| 1 | Construction of embankment with approved material obtained from borrow pit with all lifts and leads, transporting to site, spreading, grading to required slope and compacting by vibratory roller 8-10 tonne to meet requirement of table 300-2 including cost of compensation for earth taken from private land complete as per MoRT&H specification clause 305. (Lead taken upto 5 km) |
| 2 | Providing, laying, spreading and compacting of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per MoRT&H specification clause - 401 including all material, labour, machinery, lighting, guarding and maintenance of diversion.Grading - III Material |
| 3 | Labour charges for patching WBM surface using crushed/ hand broken aggregate including preparation of pot hole, scarifying and reshaping to the required grade and camber, as per the standard specifications, spreading of material, consolidation with mechanical drop hammer of 11.40 kg hand rammer or 8-10 tonne power roller, spreading and consolidation of binding material including cost of fuel and lubricants and hire charges of T & P. |
| 4 | Filling of Pot- holes and patch repairs with Built up Spray Grout in two layers with 53-22.4mm size of aggregate upto 75mm depth and removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 506, compacting with 8-10 tonne power roller, trimming and finishing the surface to form a smooth continuous surface complete using Bitumen VG-grade 30 as per clause 503, 506 & 3004.2 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion. |
| 5 | Filling of Pot- holes and patch repairs with open graded premix surfacing 20mm thick compacted with bitumen binder VG-grade 30 @ 14.60 kg/10 sqm and aggregate in Hot mix plant, transporting the mixed material with tipper and laying manually to the required level and grade, rolling with power roller, 8-10 tonne, removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 511, compacting, trimming and finishing the surface to form a smooth continuous surface complete as per clause 3004.2 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion. |
| 6 | Dismantling of existing structures like culverts, bridges, retaining walls, CC road and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by Engineer. |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - 1:1½:3 (1 Cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size). |
| 8 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - 1:4:8 (1 Cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size). |
| 9 | Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded 20mm nominal size stone aggregate) finished with a floating coat of neat cement including cement slurry, but excluding the cost of nosing of steps etc. complete. including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar |
| 10 | Random rubble masonry with hard stone in foundation and plinth :Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 11 | Brick work with FPS bricks of class designation 75 in foundation and plinth in:Cement mortar 1:4 (1 cement : 4 coarse sand) |
| 12 | Cement plastering including T&P, scaffolding, material and complete labour, including cost of water, curing, racking of joints etc. with 12 mm cement plaster of mix : including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar 1:4 (1 cement : 4 fine/ coarse sand) |
| 13 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete: |
| 14 | Distempering with dry distemper of approved brand and manufacture (two or more coats) and of required shade on new work, over and including priming coat of whiting to give an even shade. |
| 15 | Patching of damaged concrete surface with polymer concrete and curing compounds, initiator and promoter, available in present formulations, to be applied as per instructions of manufacturer and as approved by the Engineer complete as per clause 2800 of MoRT&H specification. |