| 1 | H-Beams 152 X 152 mm., 37.1 Kg./Mtr.-13 mtr. Long = 482.3 kg |
| 2 | BIS certified Energy Efficiency Level-III (Old)/Level-II (New) Convential 11/0.433KV, 200 KVA Distribution Transformer |
| 3 | AAAC Raccoon conductor 0.075 sq. inch (80 sq.mm. Al.Eq.) |
| 4 | AAAC Rabbit conductor 0.05 sq. inch. (55 sq.mm. Al.Eq.) |
| 5 | XLPE Cable 1 core unarmoured 300 sqmm Aluminium conductor 1100 Volts |
| 6 | XLPE Cable 1 core unarmoured 150 sqmm Aluminium conductor 1100 Volts |
| 7 | M S Channel 75X40x6 mm |
| 8 | M S Channel 100X50x6 mm |
| 9 | M.S.Angle 50x50x6 mm |
| 10 | M S FLAT 65X8 mm |
| 11 | 11 KV(45KN) Composite Polymer Disc Insulators |
| 12 | 11 KV Strain hardware (T&C type) fittings |
| 13 | Bi-metallic clamps suitable for 12mm dia stud and 80sqmm AAAC |
| 14 | Bi-metallic clamps Distribution Transformers Bushing |
| 15 | 11 KV D.O. Fuse Unit Polymer type |
| 16 | Three phase Static Energy meters 20-80 Amps.with L.S. & TOD Facility with box |
| 17 | 9 KV Gapless type ( 5KA) Polymer for DTR |
| 18 | 11 KV AB Switch Polymer type 400 Amp with Complete fitting |
| 19 | Red oxide paint |
| 20 | Aluminium paint |
| 21 | M.S.Nuts with Bolts |
| 22 | MS strain plate 65x8mm 250mm long |
| 23 | STAY WIRE 7/3.15 MM.(7/10 SWG) |
| 24 | Stay set complete without Stay wire 16 mm. (Painted) |
| 25 | Concreting of stay (16 mm / 12 mm) @ 0.2 Cmt. per stay |
| 26 | Concreting of structures & foundation (1:3:6) |
| 27 | Danger Boards Enamelled 11 KV |
| 28 | Complete jumpering of DTR |
| 29 | Stone Block/Pre cast block for base pedding(450X450X75MM) |
| 30 | G.I.Pipe 40 mm Dia C grade type |
| 31 | G.I. STRIP 25X3 MM1 |
| 32 | Galvanized nut & bolt with washer |
| 33 | Bentonite compound powder |
| 34 | DTR S/s fencing (37 feet) of 6\" with on MS Angle(50x50x6mm) 7No, 7\"Height |
| 35 | Double Gate (2No-2.5\"x5x) set of MS angle (25x25x4mm) with mesh & locking |
| 36 | LT distribution box with 1.2 mm thick MS powder coated sheet, 315 A MCB on incoming & 6 no. 250 A HRC fuse base including 200 A HRC fuse , For 200 KVA Transformer |
| 37 | Anti climbing devices ( Barbed wire 2.24 mm dia, 14 SWG) |
| 38 | Additional Erection Charge |
| 39 | Labour Charges & all Fabrication Charges (STC Sub Division will provide the raw material like M.S. angle, M.S. Channel, M.S. flat, etc. to the contractor and the contractor will fabricate the itemslike V-cross arm, Top clamp, D.C. Channel, clamp, etc. as per site condition. Those fabrication charges are included in the Labour charges.) no extra amount will be paid. |
| 40 | Transportation Charges for All Equipments & Materialsfrom area store to site & Site to Area store Bhopal |
| 41 | GST on Transportation @5% |
| 42 | GST on (Contractor side Material + Labour) @18% |