| 1 | Attending leakage complaint/maintenance from TF to Appliance (Gas Stove) of PNG connection (GI installation) |
| 2 | Attending Gas Leakage complaint from TF to Appliance (Gas Stove) with all tools, tackles and consumbales. Scope includes checking of leakage at joints with Soap Solution/Gas Detector, attending leakage, painting touch up work, Prepration of report as per format provided by IOAGPL.Sufficient crew/Manpower shall be available at site and should attend the leakage within 30 minutes of complaint reporting time.Free issue materials shall be supplied by IOAGPL (Contractor shall arrange for receiving, handling, loading, transportation and unloading of GI Pipe/fittings etc. from IOAGPL stores) and procument/ maintanenance of all tools, tackles and consumbales shall be bidder scope. Consumables shall include but not limited to GI powder coated clamps, Teflon Tape, \"O\" ring, etc. |
| 3 | MDPE damage recification/repair & maintenance work (upto 63 mm Dia) |
| 4 | Scope inculdes attending MDPE leakage complaint (Up to 63 mm dia) within 30 min of complaint reporting time with all tools, tackles and consumbales, closure of MDPE Valve/Sqeezing of Line, barricading of affected area,excavation of area near damage portion as per requirement, Rectification of damage line, opening of valve/Squeezer, testing of EF joint with soap solution, backifiling, prepration of report as per format provided by IOAGPL. Sufficient Crew/Manpower shall be available at site and should attend the leakage within 30 min of complaint reporting time. Free issue materials (i.e. MDPE pipe, Fittings, etc.) shall be supplied by IOAGPL (Contractor shall arrange for receiving, handling, loading, transportation and unloading of MDPE Pipes & PE Fittings etc. from IOAGPL stores). Procument/maintanenance of all tools, tackles and consumbales (i.e. Sqeezer, Valve key, Fusion Machine, Generator, Isopropyl Alcohol, etc) shall be arranged by Contractor. Works shall be executed as per instruction and satisfaction of EIC/SIC. Any pipeline relaying required, etc. shall also be in the scope of Contractor |
| 5 | MDPE damage recification/repair & maintenance work (above 63 mm Dia) |
| 6 | Scope inculdes attending MDPE leakage complaint (above to 63 mm dia) within 30 min of complaint reporting time with all tools, tackles and consumbales, closure of MDPE Valve/Sqeezing of Line, barricading of affected area,excavation of area near damage portion as per requirement, Rectification of damage line, opening of valve/Squeezer, testing of EF joint with soap solution, backifiling, prepration of report as per format provided by IOAGPL. Sufficient Crew/Manpower shall be available at site and should attend the leakage within 30 min of complaint reporting time. Free issue materials (i.e. MDPE pipe, Fittings, etc.) shall be supplied by IOAGPL (Contractor shall arrange for receiving, handling, loading, transportation and unloading of MDPE Pipes & PE Fittings etc. from IOAGPL stores). Procument/maintanenance of all tools, tackles and consumbales (i.e. Sqeezer, Valve key, Fusion Machine, Generator, Isopropyl Alcohol, etc) shall be arranged by Contractor. Works shall be executed as per instruction and satisfaction of EIC/SIC. Any pipeline relaying required, etc. shall also be in the scope of Contractor |
| 7 | MDPE Valve Chamber Cleaning, Maintenance, etc. |
| 8 | Scope include deployment of manpower with all Tools, Tackles, Machinery, etc. (i.e. Mud Motor, Generator, etc) for cleaning of MDPE Valve Chambers, prepration of report as per format provided by IOAGPL. Works shall be executed as per instruction and satisfaction of EIC/SIC. |
| 9 | Steel Valve Chamber Cleaning, Greasing, Painting, etc. |
| 10 | Scope include deployment of manpower with all Tools, Tackles, Machinery, Applying Grease, R95 Painting as per requirement, etc. (i.e. Mud Motor, Generator, etc) for cleaning of Steel Valve Chambers, prepration of report as per format provided by IOAGPL. Works shall be executed as per instruction and satisfaction of EIC/SIC. |
| 11 | Attending Service Regulator leakage complaint, Repair, Maintenance, etc. |
| 12 | Scope Include attending SR box leakage complaint, Reapair, Replacement, etc. within 30 min of complaint report time with all the tools, tackles and consumables, rectification of leakage, prepration of reprot as per format provided by IOAGPL. Free issue materials shall be supplied by IOAGPL (Contractor shall arrange for receiving, handling, loading, transportation and unloading of GI Pipe, Fittings, Regulator, etc. from IOAGPL stores) and procument/ maintanenance of all tools, tackles and consumbales shall be contractor scope.Works shall be executed as per instruction and satisfaction of EIC/SIC. |
| 13 | Patrolling of Steel & MDPE Network |
| 14 | Scope Include: • To carry out emergency patrol, for the section / network vulnerable to damage due to sudden development of activities by other utilities.• To wear PPEs like safety shoes, cotton dress and reflective jacket• To carry out patrolling by driving the vehicle along the pipeline route, as per, as-built drawing, markers and valve chamber position, observing activities on pipeline as per check list, like excavation, construction, encroachment,• To coordinate and monitor with external agencies working on charged network of IOAGPL as per permissions issued on pipeline route.• To understand their work, extent of excavation and its potential hazard to underground gas pipeline• To explain them, about the gas pipeline network / route and precautions to be taken to prevent damage to gas pipelines.• To provide / update them with contact number and other details of IOAGPL authorised EIC for assistance.• To collect details of their supervisor like contact number, address etc for further coordination• To prepare report in standard format• Report immediately any unusual developments or occurrences along a pipeline route which may have some effect on the normal operation or maintenance of the pipeline |
| 15 | SR Shifting |
| 16 | Installation of PE pipelineReceiving, handling, loading, transportation and unloading including owner supplied PE pipes and Electro fusion Fittings from owner\"s designated stock yards. Proper storing, stacking, identification, providing security, and insurancecoverforthematerials. LiasoningwithLandowningagencies/statutory authorities, , temporary restoration of the abandoned trial pitsas required (excavation to depth as per specification ) to original condition. barricading the work area as per the procedures&drawingsprovidedinthetenderandasperthedirectionsofEIC/site- incharge.Trenching to the required depth in all types of terrain, uncoiling / stringing of pipes, damping, jointing of the pipe ends/ fittings/ valves by qualified personnel, using bar coded electro fusion techniques as per specification.Rates includes excavation as per tender specification and all contractor supplied materialotherthanIOAGPLfreeissuematerialasmentionedin tender document in all types of terrain excuding rocky terrain. |
| 17 | Temporary Disconnection/Force disconnection for each house only Meter |
| 18 | Reconnection for each house only meter |
| 19 | Permanent Disconnection for each house from PE or TF |
| 20 | In the case of Permanent Disconnection, recovered material from customer premises will have to be submitted to the IOAGPL Store. |
| 21 | NG Conversion charges for 2 burner |
| 22 | Meter Shifting |
| 23 | Installation of new GI for alteration/additional point (excludingcontractor supplied materials rates )/ Re-fitting of GI, Installation of new 1\"\" GI Pipe, SOR rate to be paid for either actual or minimum 3 mlength for services and materials whichever is higher.) |
| 24 | Installation of new GI for alteration/additional point (excludingcontractor supplied materials rates )/ Re-fitting of GI, Installation of new 1/2\" GI Pipe, SOR rate to be paid for either actual or minimum 3 mlength for services and materials whichever is higher.) |
| 25 | Replacement transition fittings or RCC guard or both (Rates are excluding material charges) |
| 26 | IOAGPL supplied Suraksha Hose replacement including supply and installation of rubberhose clamp-Domestic PNG connection- Other than identifed during domestic AMC |
| 27 | Replacement of Dom., Com., Ind. Regulator/Diaphragm meter, Brass ball valve/Gas tap, |
| 28 | LP line Shifting |
| 29 | MP line Shifting |
| 30 | RCC route marker installation |
| 31 | HIRE, VEHICLE, EXTRA KM CHARGES( SCV-MINI TRUCK/Chota Hathi or similar type) |
| 32 | SPLY&FIX, VALVE CHAMBER SLEEPER MDPE/STEEL |
| 33 | Stenciling/repainting of existing marker |