| 1 | Excavation of pole pit for pole upto 8.00m length by using JCB/Manual |
| 2 | Erection of RCC, REC, PSC poles upto 8.00m length |
| 3 | Excavation of pole pit for pole above 8.00m length by using JCB/Manual |
| 4 | Erection of RCC, REC, PSC poles above 8.00m length by using Crane / Manual |
| 5 | Fixing of 11 KV V Cross Arm/Tapping X-Arm/Guarding X-Arm |
| 6 | Fixing of 33/11 KV HT/LT TI Fittings |
| 7 | Fixing of LT 1 phase cross arm |
| 8 | Fixing of LT 3 phase cross arm |
| 9 | Excavation of Stay pit of 4.5 \" to 5 \" depth using JCB / Manual |
| 10 | Erection of stay set complete with fixing up stay wire Eye, Bow, Guy Shackle, Binding etc.. |
| 11 | Paving and stringing of conductors of sizes upto 7/2.59 mm ACSR or other equivalent conductor |
| 12 | Paving and stringing of conductors of sizes above 7/2.59 mm ACSR or other equivalent conductor |
| 13 | Fixing of LT Shackle |
| 14 | Fixing of LT Pin Insulator |
| 15 | Fixing of Alu Knob |
| 16 | Transportation of all type of poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading) (i) For a lead upto 5 KM |
| 17 | Dismantling of RCC,REC,PSC pole including closing of the pit |
| 18 | Dismantling of conductor upto 7/3.35 mm including stocking of coils to the nearest road side |
| 19 | Dismantling of cross arm, clamps, TI Fittings, hardwares etc.., |
| 20 | Concreting with 1:4:8 mix using 40 mm Jelly including curing (Material + Labour) (i) Mass Concreting of poles |
| 21 | Earthing of poles with GI wires 4 or 6 SWG by coil earthing |
| 22 | Erection of 11 KV Single Pole structure including erection of DT complete with centre support ( Data as per Annexure III) including fixing of MCD box |
| 23 | Erection of DT at structure (ii) Above 25 KVA to 100 KVA |
| 24 | Loading and unloading of DT upto 100 KVA |
| 25 | G.S.T. @18% should be Entered by the Bidder |