Tender For Breakdown And Major Repair, Replacement Work Of Dr. R.P. Ghat Sps At Varanasi - Breakdown & major repair/ replacement work of Dr. R.P.Ghat SPS, at Varanasi. 2 Repairing of 15000 LPM 23 mtr. head kirloskar make pump no. 1,2,3 & 4 3 Carting of pump from site to workshop including loading & unloading. 4 Cleaning of dismantle part of Pump properly at workshop. 5 Metalizing, turning and polishing of shaft at both bearing, oil seal and threaded portion metalizing and re-threading. 6 S/Fof following items-a- SS sleeve as per sample- 1No.b- O-ring size 3” – 1 No. 7 S/F of ball bearing No. 6414 8 S/F of Roller bearing No. NU-314 9 S/F of Rubber bush- 30mm O.D. x 20mmI.D. x 25mm long- 8 Nos. 10 Assembling of pump at workshop including supply of required packing, grease and gland dori. 11 Carting of pump from workshop to site including loading & unloading. 12 Repairing of sluce valve 250mm & 300mm dia includingdismatling and installationdeep in 18 mtr pimp well all cost of materil labour charge t&petc.complete. 13 Instllation of 5000 LPM 23 mtr. head kirloskar make pump no. 1,2,3 & 4 dewatering pump set, required LED flood light etc. including all cost of material, labour charges T&P. complete. 14 Repairing and servicing of 160 KVA DG set. 2 No. 15 Cleaning of radiator & fitting its pressure testing inDG set No. 2 and 3. 16 Dismantling of air filter of DG Set No. 2 and 3, one by one proper cleaning, filling of Mobil oil, fitting of air filter in DG Sets. 17 Draining out the old engine oil from DG Set No. 2 and 3, one by one, cleaning of oil chamber properly. 18 Supply and filling of fresh mobil oil one by one in 3 DG set No. 2 and 3. 19 S/F of fuel filter in three DG Sets No. 2 and 3. 20 S/F of mobil filter in threeDG Sets No. 2 and 3. 21 Supply and filling of coolent in2 DG sets No. 2 and 3. 22 Supply and fitting of 180 AH Battery 2 Nos. for one DG setNo. 2. 23 Complete servicing of DG set engine and its testing. DG set No. 2 and 3 24 Repairing and servicing of 320 KVA DG Set -1No. 25 Dismantling of air filter of DG Set No. 1, proper cleaning, filling of Mobil oil, fitting of air filter in DG Set. 26 Draining out the old engine oil from DG Set No.1, cleaning of oil chamber properly, upply and filling of fresh mobil oil inDG set No. 1. 27 S/F of fuel filter in three DG Sets No. 1. 28 S/F of mobil filter in threeDG Sets No. 1. 29 Supply and filling of coolent inDG sets No. 1. 30 Complete servicing of DG set engine and its testing. DG set No. 1. 31 Painting works of equipment E&M work 32 Rubbing, Scrubing and cleaning of following equipments at Dr. R.P. Ghat Pumping station with all materials labours and T&P complete for preparing the surface to painting works including safety devices to prevent accident(a) Transformers 630 K.V.A. and base. - 2Nos.(b) 125 HP motors- 3 Nos.(c) 15000 LPM Pumps- 2 Nos.(d) 8800 LPM pumps-2Nos.(e) 75 HP motor - 3 Nos.(f) Starter ATS- 4 Nos.(g) Panels HT/LT-10 Nos.(h) ACB/VCB- 5 Nos.(i) Change overs – 3 Nos.(j) Complete header line, S.V/ R.V and all fitting in pump well.(k) Stair/ Platforms inPump well, Sump well and Spl. main hole complete.(l) Screens fitted on ground level, Transformer fencing complete.(m) 3 x 160 KVA DG Set with alternator complete & oil tanks. 33 Painting of all above by spray machine with Smoke grey/ black enamel paint as required with all materials, labours and T&P complete required for completion of works. 34 Making Name Plate (Radium stickers) of all equipment and few Danger plate symbol & fire etc. and fitting properly at site. 35 Repairing of 125 HP Motor work 36 Carting of 125 HP Motor No.1 from Dr. R.P. Ghat SPS to workshop with loading, unloading for all T&P. 37 Dismantling of all parts of 125 HP, 960 RPM motor and cleaning properly. 38 Cutting and snatching of burnt copper wire from 125 HP, 960 RPM motor cleaning of slots & rewinding of same motor with suitable size of copper wire super enameled, Varnishing, Heating of motor all T&P and labour charges. 39 S/F of Ball bearing No. 6318. 40 S/F of Roller bearing No.N-321 41 Assembling of all parts of motor & fitting at site Dr. R.P. Ghat on the base plate including testing on load at site at workshop. 42 Carting of above motor after repairing from workshop to Dr. R.P. Ghat SPS, VNS. 43 Lowering, installation, testing & commissioning of pump motor & starter after flood period and its verification to EIC. 44 Repairing of 160 KVA DG set alternator No. 2 rewinding of alternator including all cost of material, labour charges etc. complete. 45 Repairing of Blower motor - 1HP Crompton make - 3No. And supply of Pipes 80mm dia - 20mtr.including all cost of material, labour charges etc. complete. 46 SITC of flood light - 200 watt-8 No. in Pump well, sump well & special sump well. 47 SITC of flood light - 100 watt-10 No. in Pump well, sump well & special sump well, control panel, LT Panel, DG Room. Campus 48 SITC of flood light - 50 watt-5 No. inLT Panel, DG Room. HT Panel room, TF yard etc. 49 SITC of Tube light- 22 watt-20 No. inLT Panel, DG Room. HT Panel room, Pump house, office, store, control panel room etc. 50 SITC of LED Bulb with cover injector- 9 watt-25 No. inBridge withbathroom, etc. 51 SITC ofexhaust fan - 5 Nos in HT, LT Panel room, office, bathroom 52 SITC ofceiling fan - 5 Nos in HT, LT Panel room, office, store room, 53 SITC ofLEDJhalar on festival of Dev dipawali including all cost of material and labour charge etc. complete. 54 SITC of Electric resistance sheet - 7 No. for HT, LT, PLC Panel, maintenance register - 2 Nos. attended register - 3No., Pen- 10 No. etc. 55 Shifting of proper arregment of laid cableform transformer to meter room and cover of cable in meter room, restore of interlocking tiles& repairing of door of bathroom. PCC ofElectric meter room etc. complete with material and labour charges 56 Carting of old PLC panelfrom Dr. R.P. Ghat SPS to Dinapur store includinglabour chargesT&P complete. 57 Servicing of RO water Cooler, change of filter etc. complete including all material labour charge etc. complete. 58 Supply of Heater 2000 watt, Glass- 8 No. Plate- 2 No. Pack of new water Bottle 250ml - 4 Peti(Packet) 59 Supply of SS chokege removal equipment (Panja) 60 Repairing/Replecment of 24 volt self for 160 KVA DGset- 3No. 61 SITC 150 AH Battery - 4Nos. Including all cost of material and labour charge etc. complete for DG set 1 & 2. 62 Supply of Chair - 8 Nos., supply ofnew empty drum for diesel carting- 4Nos., Almirah - 1No. 63 Repairing of 125 HP ATS starterJSL make- 4Nos. and replacement of burnt motor connection plate, lug including all cost of material labour charge etc. - 1Year Comprehensive maintenance. 64 Centrifuging of oil and Repairing of 630 KVA (33/0.4KV) Transformer No. 1 & 2 at Sub-station 65 Dismantling of LT bushing & top cover inspection box for repairing of leakage oftransformer oil in bushing& damaged packing, taking out of bushingrod with damaged packing etc. 66 Supply & fitting of LT Bushing packing tostop theleakage of transformer oil, fitting of all dismantled parts & inspection box. 67 Supply and fitting of silica gel breather (2Kg. ALU) complete set and repairing of oil glass. 68 Top up the transformer No. 2 by filling of fresh 420 lit. Transformer oil and transformer No. 1 by 210 ltr. oil and Centrifugingof transformer oil from top to bottom & bottom to top (Total 3240 ltr.) by centrifuging machine including all labour T&P etc. complete and testing on load at site. 69 Miscellaneous work (like as Supply of broom-12, cloth-10 kg, harpic, Acid, Dettol soap, mustard oil, diesel carting charges during diesel supply, electric fault, Greasing, Gland dori of pump & motorcampus and Transformer sidegrass cutting (upto 1 year) etc. on periodic basis as per requirement. 70 Comprehensive maintenance of APFC Panel- 125 KVAR with its calibration certificate Including all cost of material and labour charges T&P.- 1Year 71 Servicing of 160 KVA old DG set 4 Nos. with material mobil oil, filter, air filter, cleaning of rediator, repairing of self24 volt including all cost of material, labour charges etc. complete. 72 Comprehensive maintenance of ACB 800 Amp. - 2No.LT Panel (main SFU-800 Amp. 2 Nos., SFU-400 Amp. 4 Nos.,-and 63 Amp. 3 Nos., etc) & AMF Panel, replacing of burnt or non-working items, including all cost of material and labour charges. 73 Comprehensive maintenance , Repairing of bypass gate actuator, gear box and filling of fresh grease as per requirementcomplete, Subjected to verification of EIC. 74 Repairing/Replacement of existing IP Cameras along with its 12 Month recharge. etc. complete Subjected to verification of EIC. 75 Repairing/SITC of ladder, mesh, MS Rod size - 12mm x 220 mtr. C channelsize 100mm x 5mm x 50mm gadder size 100mm x 15mm x 15mtr.MS angle in Pump well- 18mtr. deep, & special sump well - 18mtr. Deepas per old structure and dismantling of old Mesh gudder , ladder etc. including all cost of material labour charges etc. complete. 76 Comprehensive maintenance, Repairing of Dewatering Pump - 5 HP including all cost of material, labour charges etc. Complete. 77 Delegation and other officials Site visit arrangement throughout the year as per requirement and direction of engineer in charge.( 1Year) 78 Supply of tools set, TOOLS:This shall be a set of tools comprising of following items: (i) D-spanner set (6-17 mm)1 Set.(ii) Ring spanner(6-17mm) 1 Set(iii) Insulated cut Plier 1 No. (iv)Pipe wrench 18 1 No.(v) Screw driver 12”1 No. (vi)Hammer (500gm) with handle 1 No. (vii) Screw driver 8” 1 No. (viii) Tool box suitable size 1 No. (ix) Tonge tester (AC/DC- 500A) 1 No. (x) Electric safety hand gloves 1 Set(xi) Multi meter (AC/DC- 500A)1 No. (xii) Megger (AC/DC- 500V) 1 No. (xiii) Crimping tools 1 No. 79 Cover of HT panel room, LT panel roomcable tranch by MS chequered plate including all cost of material, labour charges etc. complet.e 80 Repairing of suction sluice valve 300/250 mm - 4Nos. and SS Y-delivery pipe removal of chock ages from NRV, Pumps and dewatering,(1 year) whenever necessary as per requirement and direction of EIC. 81 SITC of 800mm dia electromagnetic flow meter totalizer with cable as per old model on PLC basses including all cost of materail, labour charge etc. complete. 82 Repairing/Preventive maintenance of earthing by GI Strips (size 50x6mm) of 2 No. & checking and testing earth pit all electrical equipment-Pumping Plant. of GI Strips as per side condition. 83 Refiling of ABC type/CO2 fire extinguisher direction of EIC. Dr. R.P.Ghat SPS, Varanasi. 84 Miscellaneous and emergency work any damaged E&M Equipment, Delivery pipe line, common hedder, Y Pieces, Pump & motor, DG set etc. complete ae per repuirment of directionof EIC.