|
| 1 | Transporation, Erection Dismentling of D.C. Rog Machine |
| 2 | TubewellAssemble 300 mm dia 7.1 mm thich MSERW plain@slotted Pipe |
| 3 | 150 mm dia 7.1 mm thick MSERW Plain/slotted Pipe |
| 4 | 150 mm dia baill Plug |
| 5 | 200 mm dia M.S. Clamp |
| 6 | 150 mm dia Well Cap |
| 7 | 150 mm dia Well Ring |
| 8 | 200 mm dia M.S. Ring |
| 9 | 200 mm dia Tubwell Assembly suport |
| 10 | Reducer 200X150 mm dia |
| 11 | Supply of Lal Kuan Quarry Pea Gravel 1.5 to 4.8 mm Size duly screend washed and Stacked with carting unloading complete at site |
| 12 | Drilling of 450 mm dia bore from GL to 100M BGL |
| 13 | Drilling of 450 mm dia bore from 101 to 200M BGL |
| 14 | Drilling of 450 mm dia bore from 102 to 300M BGL |
| 15 | Loging of bore hole by Electric Longer |
| 16 | Barricading of site for safety with necessary T&P and required labour etl. Complete |
| 17 | 200 mm dia Housing Pipe From |
| 18 | 150 mm Dia Plain/Slotted Pipe From 60 M BGL to 80 M BGL |
| 19 | Transporation, Erection Dismentling of 150 PSI Air Compressor |
| 20 | Devlopment of T.W.By 150 P.S.I. Air Compressor upto 50 HRS |
| 21 | Transporation erection dismentling of O.P. Unit |
| 22 | Devlopment of T.W. By O.P. Unit upto 150 hrs |
| 23 | Yeild And Verticality test of T.W. Alongwith Chemical and Bachialogical Analysis of Tubwell waher (UP) n-2019-20 EP-1 Attached) |
| 24 | Supply of 100 IPM 45 M Head 15 HP Submersible pumping Plant 415+6% Volts 50HZ AC |
| 25 | Switch Gear |
| 26 | 100 mm dia 5.4 mm thick MS Colum pipe with both end Glanged and Groove for passing of Submersible cable each lenth in 3 M Long 24 m with 1 M long Top pipe with cap and sealing ring |
| 27 | Supply & Lowering of Gravel Feed pipe |
| 28 | Supply & Installation of Suitable Capacity of Chlorinating Plat (Dozer) |
| 29 | 100 mmdia 5.4 mm thick M.S. colum pipe with both end lfanged and groove (Spare) |
| 30 | one month watch and ward |
| 31 | Installation of power wiring and earthing |
| 32 | painting of pumping plant |
| 33 | Lifting Tackle |
| 34 | Tools |
| 35 | Gauges |
| 36 | Miscellaneous item such as protection ring cut out transformer oil lelctric resistance rubbersheet etc |
| 37 | Trail & Testing |
| 38 | Supply of following size di pipes K7 including their jointing material and cartage to site of work etc 100 mm |
| 39 | supply of special for Di pipes 10% of item 1.1 |
| 40 | Excavation of earth in ordinary for laying of paipline including reffing and disposal of surplus earth for different sixe of paip in ordinary soil/clay/site etc |
| 41 | Lighting and Babarricading during laying of paipline |
| 42 | Catring of site of work, laying and jointing of pipes in trenches including lowering testing and supply of all jointing materials 100 mm |
| 43 | Supply of following of types of fitting including railway freight cartage from site of work all taxex and duties etc complete Cid/F sluice valves class 1 100 mm as per IS 780 suiteable for a working pressure of 10 KG/Sqcm |
| 44 | Carting of following sluce Valve to site of work loering fixing and jointing of following fittings in trenches 100 mm |
| 45 | Supply of all Types of materials ans construct following chambers as per type design with supply of all albour T&P etc complete in all respect S.V. chamber |
| 46 | Construction of girder post assembly |
| 47 | Desmentling of road including of supply of labour, Meterial T&P etc required for proper completion of work intrlocking road |
| 48 | Reinstement of following types of roads with old & new material including supply of labour materials T&P etc required for proper completion of work . Interlocking road |
| 49 | logging of bore hole by approved borehole logger |
| 50 | Construction of piller with R.S. Joint |