Tender For Estimate For 0.8 Km. 11 Kv Interconnection Work From S/S Baktara To Thikri Pump Under Baktara D/C Of (Oandm) Budni
Tender Overview
Project Description
Estimate For 0.8 Km. 11 Kv Interconnection Work From S/S Baktara To Thikri Pump Under Baktara D/C Of (Oandm) Budni
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 18-Sep-2025 | Corrigendum for 2nd date extend for 0.8 Km. 11 KV Interconnection work from S/s Baktara to Thikri Pump under Baktara D/c of (OandM) Budni | Date | 25-Sep-2025 |
| 2 | 12-Sep-2025 | Corrigendum for 1st date extend for 0.8 Km. 11 KV Interconnection work from S/s Baktara to Thikri Pump under Baktara D/c of (OandM) Budni | Date | 18-Sep-2025 |
BOQ
| Sl. No. | Item Description |
| 1 | 140 Kg.,8.0 Mtrs. long PCC pole |
| 2 | AAAC Raccoon conductor 0.075 sq. inch (80 sq.mm. Al.Eq.) |
| 3 | D.C. Cross arms 4 ft centre to centre (100X50x6 mm.) channel |
| 4 | M S Channel 100X50x6 mm |
| 5 | M.S.Angle 50x50x6 mm |
| 6 | M S Angle 65X65X6 mm |
| 7 | 11 KV Pin Insulator Polymer Composit (5 KN) |
| 8 | 11 KV(45KN) Composite Polymer Disc Insulators |
| 9 | 11 KV Strain hardware (T&C type) fittings |
| 10 | M S FLAT 65X8 mm |
| 11 | Danger Boards Enamelled 11 KV |
| 12 | Red oxide paint |
| 13 | Aluminium paint |
| 14 | Back filling of poles with boulders. |
| 15 | G.I. WIRES 4.0 MM. (8 SWG) |
| 16 | Earthing Coil of 115 Turns of 50 MM.Dia and 2.5 Mtr. Lead of 4.0 MM G.I Wire |
| 17 | Earthing for PCC Pole 4.00 mm-8 SWG G.I wire- 0.8 Kg, per pole |
| 18 | Jointing Sleeves suitable for Rabbit (55Sq.mm.Al. Eq. ) AAAC conductor |
| 19 | Aluminium Binding wire and tape |
| 20 | Stay Insulators 90X65mm |
| 21 | M.S.Nuts with Bolts |
| 22 | STAY WIRE 7/3.15 MM.(7/10 SWG) |
| 23 | Stay set complete without Stay wire 16 mm. (Painted) |
| 24 | Concreting of stay (16 mm / 12 mm) @ 0.2 Cmt. per stay |
| 25 | Concreting of structures & foundation (1:3:6) |
| 26 | Stone Block/Pre cast block for base pedding(450X450X75MM) |
| 27 | Anti climbing devices ( Barbed wire 2.24 mm dia, 14 SWG) |
| 28 | Additional Erection Charge |
| 29 | Labour Charges & all Fabrication Charges (STC Sub Division will provide the raw material like M.S. angle, M.S. Channel, M.S. flat, etc. to the contractor and the contractor will fabricate the itemslike V-cross arm, Top clamp, D.C. Channel, clamp, etc. as per site condition. Those fabrication charges are included in the Labour charges.) no extra amount will be paid. |
| 30 | Transportation Charges for All Equipments & Materialsfrom area store to site & Site to Area store Bhopal |
| 31 | GST on Transportation @5% |
| 32 | GST on (Contractor side Material + Labour) @18% |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender