| 1 | Dismantling and disposal of damaged Brick work of Bridge including stacking of materials as directed by Engineer - in - Charge.including all labour,T&P etc. |
| 2 | Dismantling and disposal of damaged R.C.C.1:2:4 work slab of bridgeincluding stacking of materias as directed by Engineer In-Charge. including all labour, T&P etc. |
| 3 | Dismantling and disposal of damaged Cement Concrete 1:4:8 of Bridge foundation including stacking of materials as directed by Engineer - in - Charge.including all labour,T&P etc. |
| 4 | Earth work in excavation of foundation in ordinary/sandy loam, clay or sand including lift upto 1.5 m. and lead upto 30.00 m. including filling, watering, ramming of excavated earth in to the trenches or upto the space and side of the foundation trenches and removal and disposal of surplus earth as directed by Engineer-in-charge. Including all labour, T&P etc. |
| 5 | C. C. with M-10 (1:3:6) in foundation of abutment with cement, coarse sand F.M. above 2.0 and stone ballast 45 – 63 mm including all material, labour, T&P etc. |
| 6 | First class brick work in 1:4 c.m. with first class old dismantled brick, cement and coarse sand F.M. 1.5 to 2.0 including all cost of material, labour, T&P etc. |
| 7 | First class brick work in 1:4 c.m. with first class brick, cement and coarse sand F.M. 1.5 to 2.0 including all cost of material, labour, T&P etc. |
| 8 | Shuttering & Centering for slab and bed block including all material, labour, T&P etc. |
| 9 | Reinforcement work in slab and bed block with cutting, bending,binding and placing including cost of all material, labour, binding wire, T&P etc. |
| 10 | R. C. C. with M-20 (1:1.5:3) in slab and bed block withcement, coarse sand F. M. above 2.0 and crushed stone grit 10-20 mm and 4.75-10mm size with mechanically mixed andmechanically compaction including all cost of material, labour, T&P etc. |
| 11 | Wearing coat with M-20 (1:1.5:3) in cement, coarse sand F. M. above 2.0 and crushed stone grit 10-20 mm and 4.75-10 mm with mechanically mixed including all cost of material, labour, T&P etc. |
| 12 | Deep struck pointing in 1:2 c.m. on open new brick surface with cement and coarse sand F.M. 1.5 to 2.0 including all material, labour, T&P etc. |
| 13 | Finishing wall with water proof cement paint of approved make such as super snowcem of required shade on new wall surface with two coat of paint over one coat of primer to give an even shade after thoroughly brushing the surface to remove all dirt and remains, loose powdered materials including curing and cost of all materials, labour T&P etc. required for proper completion. |
| 14 | Supplying and fixing of wheel guard stone including cost of all material, labour, t&p etc. |
| 15 | Earthwork in correcting external section of canal by J.C.B.machine including partial compaction in layers with initial lead and lift of 5.00 m each including cost of all labour,T&P etc. |