The Supply Of Constructional Materials For The Construction Of Grama Panchayath Building In Kodimbady Village And Post Puttur Taluk And Dakshina Kannada District - Broken Stone Aggregate 40 Mm Size --Kodimbady52,Hom Of Vibrator 0.71 Days --Kodimbady51,Casurina Poles 75 - 100 Mm Dia --Kodimbady50,Stone Chistler Class Ii --Kodimbady49,Mason Class Ii (With Tools) --Kodimbady48,Latrite --Kodimbady47,Add Watering Charges At 1 % On Labour --Kodimbady46,Add Sundries Charges At 1 % On Labour --Kodimbady45,Solid Concrete Blocks (40X10x20 Cms)-4.00 N/Sqmm --Kodimbady44,Add Hom Of Welding And Grinding Machine At 2% On Material --Kodimbady43,Fabricator --Kodimbady42,Add 15% Wastage For Glass --Kodimbady41,Plain Glass 5.50 Mm Thick --Kodimbady40,Chrominum Plated Screws --Kodimbady39,Cleat Angles --Kodimbady38,Alluminium Handles - 15 Mm --Kodimbady37,Alluminium Tower Bolt - 20 Cm --Kodimbady36,Pvc Beading --Kodimbady35,Rubber Beading For Shutters Beading --Kodimbady34,Nylon Rollers --Kodimbady33,Aluminium Window Frame Section 1.20 Mm Thick --Kodimbady32,Add Brush At 1% On Cost Of Paint --Kodimbady31,Enamel Metal Paint --Kodimbady30,Add Providing And Removing Scaffolding At 3% On Labour --Kodimbady29,Painter Class I --Kodimbady28,Add Wire Brush, Fine Steel Wool, Putty, Sand Paper, At 3% On Cost Of Paint --Kodimbady27,Ready Mix Primer Paint (Ready Mix Red Lead Paint) --Kodimbady26,Add Handling , Loading And Unloading At 1% On Material --Kodimbady25,Add Hom Of Welding And Grinding Machine At 4% On Material --Kodimbady24,Welder Grade I --Kodimbady23,Fitter Class I --Kodimbady22,Ms Flat --Kodimbady21,M.S Rods --Kodimbady20,Broken Stone Aggregate 20 Mm Size --Kodimbady19,Mixer (Concrete) - 1 Cum Capacity --Kodimbady18,Plasticizer / Super Plasticizer --Kodimbady17,Broken Stone Aggregate 12 Mm To 10 Mm Size --Kodimbady16,Add Sundries Charges At 2 % On Material --Kodimbady15,Add Handling , Loading And Unloading At 2% On Material --Kodimbady14,Casurina Poles 100 - 150 Mm --Kodimbady13,Silver Oak Or Equivalent Planks 38 Mm Thick --Kodimbady12,Jungle Wood Runners And Planks --Kodimbady11,Binding Wire --Kodimbady10,Tmt Bars Fe 500 --Kodimbady09,Add Watering Charges At 1 % On Material --Kodimbady08,Mason Class I (With Tools) --Kodimbady07,Over Head & Other Miscellaneous Charges --Kodimbady06,Add Sundries Charges At 1 % On Material --Kodimbady05,Mixer (Concrete Small Used In Culvert) --Kodimbady04,Coarse Sand (Zone Iii) --Kodimbady03,Portland Cement --Kodimbady02,Over Head Charges --Kodimbady01