| 1 | Modular toilet |
| 2 | Earth work in excavation in ordinary soil including lift upto 1.5 M & lead upto 30 M including back filling watering and ramming of excavated earth.including supply of all material,labour and T&P etc.required for proper completion of work (Chpt-4/251a)septic tank column footing long wall short wall partition wall partion wall less column footing long wall less wall partition wall partion wall less column footing |
| 3 | Concrete in 1:6:12 with cement,fine sand and brick ballast of 4cm guage including supply of all material,labour and T&P etc.required for proper completion of work(CHpt-5/273) septic tank column footing long wall short wall partion wall partion wall under floor less column footing |
| 4 | M-150 brick work in 1:6 with cement, fine sand in foundation and plinthmortar including supply of all material,labour and T&P etc.required for proper completion of work(CHpt-6/303) septic tank long wall short wallpartition wall partion wall deduction column |
| 5 | M-150 brick work in 1:3 with cement, fine sandmortar in super structure including supply of all material,labour and T&P etc.required for proper completion of work, (Chpt-6/307+309) long wall short wall partition wall partion wall deduction column deduction door deduction ed parapet wall |
| 6 | R.C.C work in 1:1.5:3 with cement,coarse sand and stone gritt of 4cm guage in r.c.c raft foundation and footingincluding supply of all material,labour and T&P etc.required for proper completion of work,(Chpt-5/287a) footing |
| 7 | R.C.C work in columns 1:1.5:3 with cement,coarse sand and stone gritt of 2cm guage includingsupply of all material,labour and T&P etc.required for proper completion of work (Chpt-5/289)H=0.50+2.50=3.00 |
| 8 | R.C.C work in 1:1.5:3 with cement,coarse sand and stone gritt of 2cm guage in plinth beam,tie beam i/c supply of all material,labour and T&P etc.including all complete of work,(Chpt-5/285) plinh beam tie beam |
| 9 | R.C.C work in 1:1.5:3 with cement,coarse sand and stone gritt of 2cm guage in Suspended floor slabsi/c supply of all material,labour and T&P etc.including all complete of work,(Chpt-5/284a)slab septic tank |
| 10 | Supply and fixing of mild steel bars for Rcc work and angle for channel includingsupply of all material,labour and T&P etc.required for proper completion of work(asper sail)Taking 0.60% in footingTaking 1.20% in Column Taking 1.00% in plinth& tieTaking 1.00% in Slabs |
| 11 | 12mm thick Plaster in 1:3 with cement,coarse sand mortar including supply of all material,labour and T&P etc.required for proper completion of work, (Chpt-13/582a)septic tank toilet slab gents ceiling long wall short wall deduction door chajjas p;laster |
| 12 | Concrete in 1:2:4 in floorwith cement,fine sand and stone ballast of 2cm guageincluding supply of all material,labour and T&P etc.required for proper completion of work,(Chpt-5/279a)toilets passage urinal |
| 13 | Providing and laying \"brick coba\" 12mm thick laid with M-150 class brick bat coba 7.50cm thick with gap of 15mm to each other,over 20mm thick base ofcement mortar 1:4 cement and coarse sand mixed with water proofing compound spreading cement slurry withtop mashed false square 30cm x30cm and side wall parapet shall be mono tythic plasterwall upto 30cm higher incluing supply of all materials ,labour and T&P etc. required for proper completion of the work cHPT-11 NEW 1st part |
| 14 | Providing & Applying wall putti on new surface with two coat approved brand including supply of all material,labour and T&P etc.required for proper completion of work Chpt-15 New as per plaster area |
| 15 | Finishing wall with waterproof cement paint apex weather coat approved brand including supply of all material,labour and T&P etc.required for proper completion of work Chpt-15 new sa per internal plaser area |
| 16 | Fabrication of grill and staircase railling 35.00kg/sqm = 0.35qtl/sqm including supplyof all material,labour and T&P etc.required for proper completion of work v grills |
| 17 | Supply and fixing of 3.8cm thick commercial quality ply wood hard board flush Door shutter including fixing of wooden cleats and stoppers and adjustment of hinges bolts locks handles springs fittings with necessary screws to be supplied. Flush door |
| 18 | Providing and fixing of pressed steel Door frames confirming to IS 4351 manufactured from commercial mild steel sheet of 1.25mm thickness including hinges,lock jamb,bead and if required angle including supply of all material,labour and T&P etc.required for proper completion of work 10.14.10 flush door flush door profile E |
| 19 | Supply and fixing of 4.5 cm thick teak wood part panelled and part glazed door and window shutterof 3.8cm thick commercial quality ply wood hard board flush Door shutter including fixing of wooden cleats and stoppers and adjustment of hinges bolts locks handles springs fittings with necessary screws to be supplied. 409 door door |
| 20 | Supply & fixing 6-8mm thick Vitri fied floor tiles of first quality in floor & wall or skirttingwith 1.3 cement coarse sand mortor with white cement slurry jointing and polishing including supply of all material,labour and T&P etc.required for proper completion of work,(Chpt-14/new4) passage toilet wall pasage less door less door |
| 21 | Supplying & Fixing Indian seat Orissa Oan ( CELLO) CABLE S3020105 500X400mmIvory/Superior colours |
| 22 | Supplying & Fixing Wash basin CATMAX 650X380X110CAT no-s2020159 |
| 23 | S/F Eropan Seat CHARM 6D 650x335x745mm Cat no-S1013222VS, STRAP 300 |
| 24 | Urinal with sensor KENSO cat no-A4010101 |
| 25 | Liquid Soap dispenser F5001111MB |
| 26 | Dribble -Two function Health Faucet F8035101MB |
| 27 | Robe Hook F5014108MB |
| 28 | Soap Dish ( brass) F5014106MB |
| 29 | Towel rack 600mmF5013121MB |
| 30 | Paper holder F5012109MB |
| 31 | Pillar cock with AeratorF1016101BM |
| 32 | Bibcock with wall flange F1016151BM |
| 33 | Angle cock with wall flange F1016201BM |
| 34 | Mirror with frame |
| 35 | Urinal partition |
| 36 | Cistern cat no-B1110101 |
| 37 | O Knob matte Black B 1120120MB |
| 38 | P/F stopne Counter for basin |
| 39 | Providing & Placing on tarracwater tank of including supply of all material,labour and T&P etc.required for proper completion of work |
| 40 | Add for Internal w/s & sanitoryfor Labor |
| 41 | Add for Internal & External Electrification fittings |
| 42 | gst |