| 1 | Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area as directed by the Engineer-in-charge. |
| 2 | Earth work in dam and embankment in specified section using approved earth excavated by manual or mechanical means excluding all kinds of rocks from borrow areas including loading in to and transportation by mechanicalmeans and unloading the earth within 1Km lead on properly prepared and scientifically approved surfacewith all leads, lifts & de-lifts, spreading and levelling the earth in layers not exceeding22.5cm depth, removing the undesirable materials, breaking clods to a maximum 5 to 7 cm size including all costs to make ready for watering and compaction including construction, maintenance, watering, lighting of haul roads and borrow areas with all costs for approach road, diversion road, site illumination, mobilization, demobilization, T & P, royalty and other taxes etc. complete with all costs incidental to work as per specification and direction of Engineer-in-charge complete but excludingcost of watering and compaction etc. (measurement will be taken on the finished approved level section.1/6th volume will deducted for settlement of embankment only). |
| 3 | Providing Cement Concrete M15 grade on approved surface , shape and size using 20mm and downgraded crusher broken hard granite chips aggregates of approved quality quarried, free from weathered skin surface and any other deleteriousmaterials, using clean and sharp sand of approved grading and quality confirming to the design specifications including hoisting & lowering to all heights, watering & dewatering, laying the concrete in position to proper slope and level, compacting in layers with vibrators and finishing the exposed surface smooth, curing for required time, providing beads and grooves including hire charges of concrete mixer and vibrator with cost, conveyance, royalty and other taxes of all materials, with all cost of tools and plant, cost and carriage of wateretc, with supply of all labour and supervision charges including mobilisation & demobilisation of machineries, all incidental charges required for the work complete in all respect as directed by the Engineer-in-charge. |
| 4 | Supplying, fitting and placing uncoated HYSD bar reinforcement as per approved design & specification including cost, conveyance and other taxes (binding wires cost included 18 to 20 gauge) etc. complete in all respect including all leads & lifts from bending yard to placement spot with supplying of labour and T&P and labour cess required for the work etc. complete in all respect as directed by the Engineer-in-charge. |
| 5 | Excavation of foundation to proper profile in all kinds soil with all leads and lifts including dressing and leveling the bed to proper slope and level and making it fit for laying concrete including depositing the excavated materials clear of work site within all leads and lifts etc. including dewatering from foundation if required etc. with supply of all labour and T&P. required for the work etc. complete in all respect as directed by the Engineer in charge. |
| 6 | Rough stone dry packing in afflux bundhs,aprons & revetments to all heights & thickness using hard granite broken stones of 30cm& above size of approved quality free from weathered skin including filling the interstices with small stones by wedging & hammering to proper slope and level with cost conveyance, royalty & other taxes of all materials including labour cess , all labour , T & P materials required for this items etc. complete in all respect as directed by the Engineer-in-charge. (Deptt. Stone) |
| 7 | Rough stone dry packing in afflux bundhs,aprons & revetments to all heights & thickness using hard granite broken stones of 30cm& above size of approved quality free from weathered skin including filling the interstices with small stones by wedging & hammering to proper slope and level with cost conveyance, royalty & other taxes of all materials including labour cess , all labour , T & P materials required for this items etc. complete in all respect as directed by the Engineer-in-charge. |
| 8 | Filling foundation and plinth with excavated earth including watering and ramming to all heights with all leads & lifts with all labour. T&P materials and labour cess as required for the work finished smooth as directed by the Engineer-in-charge. |
| 9 | Providing Cement Concrete M20 grade for RCC works on approved surface, shape and size using 20mm and downgraded crusher broken hard granite chips aggregates of approved quality quarried, free from weathered skin surface and any other deleterious material, using clean and sharp sand of approved grading and quality confirming to the design specifications including hoisting & lowering to all heights, watering & dewatering, laying the concrete in position to proper slope and level, compacting in layers with vibrators and finishing the exposed surface smooth, curing for required time, providing beads and grooves including hire charges of concrete mixer and vibrator with cost, conveyance, royalty and other taxes of all materials, ( excluding cost, carriage of M.S. rod and labour for cutting, bending, binding and fixing of M.S. rod)with all cost of tools and plant, cost and carriage of wateretc, with supply of all labour and supervision charges including mobilisation & demobilisation of machineries,with all incidental charges required for the work complete in all respect as directed by the Engineer-in-charge. |
| 10 | Providing and removing rigid and smooth centering and shuttering for all C.C. andR.C.C. works including false work and dismentalling the same after casting and proper curing including cost, conveyance, royality and taxes of all materials required for the work with supply of all labour and T&P required for the work etc. complete in all respects as directed by the Engineer in charge. (For Foundation and Plinth) |
| 11 | Collecting,conveying,suppling,stacking & spreading moorum and consolidation with light HRR including watering but including cost and conveyance of moorum and including all labour, T&p, taxes royalty required to complete the item as directed by the Engineer-in-Charge. |
| 12 | Fine dressing the slope of the embankment and turfing with best compacted dub grass sods with all leads lifts and delifts including periodical watering till survival of turfwith supply of all labour and T&P required for the work etec. Complete in all respect as directed by the Engineer in charge (Measurement is to be taken after survival of sods only) |