| 1 | Removing old lime or cement plaster from walls including racking out joints 12mm. deep and removing the debries within 50mtr lead including all labour, T&P, sundries and labour cess etc complete and as per thedirection of theEIC. |
| 2 | Earth work in hard soil or gravelly soil within 50m intial lead & 1.50 m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.30m in depth and including cost ofall labour, T & P, sundries and labour cess etc complete and as per thedirection of theEIC. |
| 3 | Fillingfoundation& plinthwith sand, well watered & rammed including cost,conveyance, royalty, T&P, sundries, lead, lift, delift and labour cessetccomplete and as per thedirection of theEIC. |
| 4 | Cement concrete (1:3:6) with 40mmsize HGCB metal including cost, conveyance, royalty,lead, lift, delift, all labour, T&P, sundries, labour cess and curing etc complete and as per thedirection of theEIC. |
| 5 | 16mm thick cement plaster in cement mortar (1:6) over brick or stone masonryincludingcost, conveyance,royalty, lead, lift, delift,alllabour, T&P, sundries, labour cess andcuringetc complete and as per thedirection of theEIC. |
| 6 | Providing,fitting and fixingconcretechequered tilesin floorsofsize 30cm x 30cm x 2.5cm oflocalmake laidon20mmthickcementmortar(1:4)andfillingthejoints withneatcement slurry including costofallmaterials, labour,T & P,sundries, lead,lift,delift,carriageandlabourcess etc complete and as per thedirection of theEIC. |
| 7 | Priming one coat with red oxide primer ofShalimar/ Asian/ Berger/ Nerolacmakeincluding cost of primer, brush, all labour, T&P, sundries, labour cess etc complete and as per thedirection of theEIC. |
| 8 | Painting two coats with any approved enamel paint ofAsian / Berger/ Shalimar/ Nerolacmakeincluding cost of paint, brush, all labour, T&P,sundries, labour cess etc complete and as per thedirection of theEIC. |
| 9 | Providing and finishing wall surface with acrylic wall putty / cementbasedwallputty of approved shade of Asian/ Berger/ Shalimar make and finished smooth and even surface to receive painting including cost of paint scaffolding charges labour , T&P sundries, labour cess etc complete and as per thedirection of theEIC. |
| 10 | Priming one coat to walls with wall cementprimer (ISI)including cost of primer water boundofAsian / Berger / Shalimarmake including all labour, T&P, sundries, brush, scaffolding,putty andlabour cess etc complete and as per thedirection of theEIC. |
| 11 | Wall painting two coats withplastic emulsion paint of approved shade of Berger/ Asian/ Shalimar / Nerolac / Dulux orequivalent make on old work to give an even shade atallheight includingcost of paint, brush, putty,all labour, T&P, scaffolding, sudries, labour cess etc complete and as per thedirection of theEIC. |
| 12 | Paintingtwo coats to outside wallssurfacewith exteriorweathercoat paint(ISI)ofapprovedshadeofAsian/Berger/Shalimar / Nerolac / Duluxoranyequivalent make on old work to give an even shade atallheightincluding cost ofweathercoatpaint,T&P,sundries, alllabour,brush, puttyandlabourcess&scaffoldingetccomplete and as per thedirection of theEIC. |
| 13 | Disposalofbuildingrubbish / malba / similarunserviceable,dismantledorwastematerialsorexcavatedearthetcbymechanicalmeans,includingloading,transporting, unloadingtoapprovedmunicipaldumpinggroundor asapprovedbyEngineer-in-chargewithin5.00 Kmawayfromtheworksiteincludingcostofalllabour, conveyance , T&P,sundries, lead, lift, delift,labour cessetc complete and as per thedirection of theEIC. |