| 1 | fo|qr forj.k [k.M fupykSy ds vUrxZrfo|qr O;oLFkk lqn`<+hdj.k gsrq ifjorZd {kerko`f)@ vfrfjDr ifjorZd yxkus dk dk;ZA |
| 2 | fo|qr forj.k e.My&egjktxat ds v/khu fo|qr forj.k [k.M fupykSy esa dqy 23 vyx& vyx LFkkuksa ij vfrfjDr 25 ds0oh0,0 ifjorZd dh LFkkiuk dk dk;Z djk;k tkuk gSA |
| 3 | Carriage of 8.5 Mtr Pcc Pole |
| 4 | Safe Carriage. Loading, Unloading of Other Line Item Required for particular work from store location or dump site to work site |
| 5 | Safe Carriage. Loading, Unloading of 25 KVA Distribution Transformer Required for particular work from store location or dump site to work site |
| 6 | Erection and Groutingof PCC Pole as per specification |
| 7 | Earthing of PCC Pole/Earthing set |
| 8 | Installation of ACSR Weasel Conductor |
| 9 | Erection and Grouting of Stay Set |
| 10 | Installation of LA |
| 11 | Mounting of 25 KVA Distribution Transformer on Double Pole |
| 12 | Supply of 3.5x150/70 sqmm |
| 13 | Supply of Top Channel |
| 14 | Supply of Dropper Channel |
| 15 | Supply of T-off channel |
| 16 | Supply of Transformer Base |
| 17 | Supply of Top/Dropper/T-Off Channel Clamp |
| 18 | Supply of Danger Board |
| 19 | Supply of Fuse set |
| 20 | Supply of Nut and Bolt |
| 21 | Supply of PG Clamp |
| 22 | Supply of Alluminium Lug |
| 23 | Supply of Barbed Wire |
| 24 | Supply of Stone Pad |
| 25 | Installation of LT PVC 3.5x150/70 sqmm |
| 26 | Installation of Top Channel |
| 27 | Installationof Dropper Channel |
| 28 | Installation of T-off channel |
| 29 | Installation of Transformer Base |
| 30 | Installation of Top/Dropper/T-Off Channel Clamp |
| 31 | Installation of Fuse set |
| 32 | Installation of Nut and Bolt |
| 33 | Installation of PG Clamp |
| 34 | Installation of Alluminium Lug |
| 35 | Installation of Danger Board |
| 36 | Installation of Barbed Wire |
| 37 | Installation of Stone Pad |
| 38 | fo|qr forj.k e.My&egjktxat ds v/khu fo|qr forj.k [k.M fupykSy esa dqy 4 vyx& vyx LFkkuksa ij vfrfjDr 63 ds0oh0,0 ifjorZd dh LFkkiuk dk dk;Z djk;k tkuk gSA |
| 39 | Carriage of 8.5 Mtr Pcc Pole |
| 40 | Safe Carriage. Loading, Unloading of Other Line Item Required for particular work from store location or dump site to work site |
| 41 | Safe Carriage. Loading, Unloading of 63 KVA Distribution Transformer Required for particular work from store location or dump site to work site |
| 42 | Erection and Groutingof PCC Pole with all fittings as per specification |
| 43 | Earthing of PCC Pole/Earthing set |
| 44 | Installation of ACSR Weasel Conductor |
| 45 | Erection and Grouting of Stay Set |
| 46 | Installation of LA |
| 47 | Mounting of 63 KVA Distribution Transformer on Double Pole |
| 48 | Supply of 3.5x150/70 sqmm |
| 49 | Supply of Top Channel |
| 50 | Supply of Dropper Channel |
| 51 | Supply of T-off channel |
| 52 | Supply of Transformer Base |
| 53 | Supply of Top/Dropper/T-Off Channel Clamp |
| 54 | Supply of Barbed Wire |
| 55 | Supply of Danger Board |
| 56 | Supply of Fuse set |
| 57 | Supply of Nut and Bolt |
| 58 | Supply of PG Clamp |
| 59 | Supply of Stone Pad |
| 60 | Installation of 3.5x150/70 sqmm |
| 61 | Installation of Top Channel |
| 62 | Installation of Dropper Channel |
| 63 | Installation of T-off channel |
| 64 | Installationof Transformer Base |
| 65 | Installationof Top/Dropper/T-Off Channel Clamp |
| 66 | Installationof Barbed Wire |
| 67 | Installationof Danger Board |
| 68 | Installationof Fuse set |
| 69 | Installationof Nut and Bolt |
| 70 | Installationof PG Clamp |
| 71 | Installationof Stone Pad |
| 72 | fo|qr forj.k e.My&egjktxat ds v/khu fo|qr forj.k [k.M fupykSy esa dqy 9 vyx& vyx LFkkuksa ij vfrfjDr 100 ds0oh0,0 ifjorZd dh LFkkiuk dk dk;Z djk;k tkuk gSA |
| 73 | Carriage of 8.5 Mtr Pcc Pole |
| 74 | Safe Carriage. Loading, Unloading of Other Line Item Required for particular work from store location or dump site to work site |
| 75 | Safe Carriage. Loading, Unloading of 100 KVA Distribution Transformer Required for particular work from store location or dump site to work site |
| 76 | Erection and Groutingof PCC Pole with all fittings as per specification |
| 77 | Earthing of PCC Pole/Earthing set |
| 78 | Installation of ACSR Weasel Conductor |
| 79 | Erection and Grouting of Stay Set |
| 80 | Installation of LA |
| 81 | Mounting of 100 KVA Distribution Transformer on Double Pole |
| 82 | Supply of LT PVC 3.5x150/70 sqmm |
| 83 | Supply of Top Channel |
| 84 | Supply of Dropper Channel |
| 85 | Supply of T-off channel |
| 86 | Supply of Transformer Base |
| 87 | Supply of Top/Dropper/T-Off Channel Clamp |
| 88 | Supply of Barbed Wire |
| 89 | Supply of Danger Board |
| 90 | Supply of Fuse set |
| 91 | Supply of Nut and Bolt |
| 92 | Supply of PG Clamp |
| 93 | supply of Al Lug |
| 94 | Supply of Stone Pad |
| 95 | Installation of LT PVC 3.5x150/70 sqmm |
| 96 | Installation of Top Channel |
| 97 | Installation of Dropper Channel |
| 98 | Installation of T-off channel |
| 99 | Installationof Transformer Base |
| 100 | Installationof Top/Dropper/T-Off Channel Clamp |
| 101 | Installationof Barbed Wire |
| 102 | Installationof Danger Board |
| 103 | Installationof Fuse set |
| 104 | Installationof Nut and Bolt |
| 105 | Installationof PG Clamp |
| 106 | Installation of Al Lug |
| 107 | Installationof Stone Pad |
| 108 | fo|qr forj.k e.My&egjktxat ds v/khu fo|qr forj.k [k.M fupykSy esa dqy 3 vyx& vyx LFkkuksa ij vfrfjDr 250 ds0oh0,0 ifjorZd dh LFkkiuk dk dk;Z djk;k tkuk gSA |
| 109 | Carriage of 8.5 Mtr Pcc Pole |
| 110 | Safe Carriage. Loading, Unloading of Other Line Item Required for particular work from store location or dump site to work site |
| 111 | Safe Carriage. Loading, Unloading of 250 KVA Distribution Transformer Required for particular work from store location or dump site to work site |
| 112 | Erection and Groutingof PCC Pole with all fittings as per specification |
| 113 | Earthing of PCC Pole/Earthing set |
| 114 | Installation of ACSR Weasel Conductor |
| 115 | Erection and Grouting of Stay Set |
| 116 | Installation of LA |
| 117 | Mounting of 250 KVA Distribution Transformer on plinth |
| 118 | Supply of Top Channel |
| 119 | Supply of Dropper Channel |
| 120 | Supply of T-off channel |
| 121 | Supply of Top/Dropper/T-Off Channel Clamp |
| 122 | Supply of Barbed Wire |
| 123 | Supply of Danger Board |
| 124 | Supply of Fuse set |
| 125 | Supply of Nut and Bolt |
| 126 | Supply of PG Clamp |
| 127 | supply of Al Lug |
| 128 | Supply of Stone Pad |
| 129 | Supply of TPMO |
| 130 | Copper L Piece 50x225x10 mm L.S |
| 131 | Copper L Piece 62x22x12 mm L.S |
| 132 | Installation of Top Channel |
| 133 | Installationof Dropper Channel |
| 134 | Installationof T-off channel |
| 135 | Installationof Top/Dropper/T-Off Channel Clamp |
| 136 | Installationof Barbed Wire |
| 137 | Installationof Danger Board |
| 138 | Installationof Fuse set |
| 139 | Installationof Nut and Bolt |
| 140 | Installationof PG Clamp |
| 141 | Installationof Al Lug |
| 142 | Installation of Stone Pad |
| 143 | Installationof TPMO |
| 144 | InstallationL Piece 50x225x10 mm L.S |
| 145 | InstallationL Piece 62x22x12 mm L.S |
| 146 | Chemical Earthing of 250 KVA Distribution transformer |
| 147 | Making of Plinth of size 2x2x1.5 m and Installlation of Transformer |
| 148 | Pale fencing of Distribution Transformer. |
| 149 | fo|qr forj.k e.My&egjktxat ds v/khu fo|qr forj.k [k.M fupykSy esa dqy 34 vyx& vyx LFkkuksa ij 10 ds0oh0,0 ls 25 ds0oh0,0 ifjorZd {kerko`f) dk dk;Z djk;k tkuk gSA |
| 150 | Carriage of 8.5 Mtr Pcc Pole |
| 151 | Safe Carriage. Loading, Unloading of Other Line Item Required for particular work from store location or dump site to work site |
| 152 | Safe Carriage. Loading, Unloading of 25 KVA Distribution Transformer Required for particular work from store location or dump site to work site |
| 153 | Erection and Groutingof PCC Pole as per specification |
| 154 | Earthing of PCC Pole/Earthing set |
| 155 | Installation of ACSR Weasel Conductor |
| 156 | Installation of LT ABC 3X50+1X35+1X16 SQMM |
| 157 | Erection and Grouting of Stay Set |
| 158 | Installation of LA |
| 159 | Mounting of 25 KVA Distribution Transformer on Double Pole and dismentalling of 10 KVA Distribution Transformer. |
| 160 | Supply of LT PVC Cable 3.5x150/70 sqmm |
| 161 | Supply of F Braket |
| 162 | Supply of Top Channel |
| 163 | Supply of Dropper Channel |
| 164 | Supply of Transformer Base |
| 165 | Supply of Danger Board |
| 166 | Supply of Fuse set |
| 167 | Supply of Nut and Bolt |
| 168 | Supply of PG Clamp |
| 169 | Supply of Alluminium Lug |
| 170 | Supply of Barbed Wire |
| 171 | Supply of LT Clamp |
| 172 | Supply of Eye Hook |
| 173 | Supply of Suspension clamp |
| 174 | Supply of Deadend Clamp |
| 175 | Supply of Piercing Clamp |
| 176 | Supply of 1x16 sqmm AL Cable for Distribution Box |
| 177 | Supply of Stone Pad |
| 178 | Supply of TPMO |
| 179 | Supply of Distribution Box Clamp |
| 180 | Supply of 1x16 sqmm AL Cable for Distribution Box |
| 181 | Installation of LT PVC Cable 3.5x150/70 sqmm |
| 182 | Installation of F Braket |
| 183 | Installation of Top Channel |
| 184 | Installation of Dropper Channel |
| 185 | Installation of Transformer Base |
| 186 | Installation of Danger Board |
| 187 | Installation of Fuse set |
| 188 | Installation of Nut and Bolt |
| 189 | Installation of PG Clamp |
| 190 | Installation of Alluminium Lug |
| 191 | Installation of Barbed Wire |
| 192 | Installation of LT Clamp |
| 193 | Installation of Eye Hook |
| 194 | Installation of Suspension clamp |
| 195 | Installation of Deadend Clamp |
| 196 | Installation of Piercing Clamp |
| 197 | Installation of 1x16 sqmm AL Cable for Distribution Box |
| 198 | Installation of Stone Pad |
| 199 | Installation of TPMO |
| 200 | Installation of Distribution Box Clamp |
| 201 | Installation of 1x16 sqmm AL Cable for Distribution Box |
| 202 | Carriage of dismentalled material and DT from site to store. |
| 203 | fo|qr forj.k e.My&egjktxat ds v/khu fo|qr forj.k [k.M fupykSy esa dqy 40 vyx&vyx LFkkuksa ij 25 ds0oh0,0 ls 63 ds0oh0,0 ifjorZd {kerko`f) dk dk;Z djk;k tkuk gSA |
| 204 | Safe Carriage. Loading, Unloading of Other Line Item Required for particular work from store location or dump site to work site |
| 205 | Safe Carriage. Loading, Unloading of 63 KVA Distribution Transformer Required for particular work from store location or dump site to work site |
| 206 | Earthing of PCC Pole/Earthing set |
| 207 | Installation of LA |
| 208 | Mounting of 63 KVA Distribution Transformer on Double Pole and dismentalling of 25 KVA Distribution Transformer. |
| 209 | Supply of LT PVC Cable 3.5x150/70 sqmm |
| 210 | Supply of Fuse set |
| 211 | Supply of Nut and Bolt |
| 212 | Supply of PG Clamp |
| 213 | Supply of Alluminium Lug |
| 214 | Supply of Barbed Wire |
| 215 | Supply of TPMO |
| 216 | Installation of LT PVC Cable 3.5x150/70 sqmm |
| 217 | Installationof Fuse set |
| 218 | Installationof Nut and Bolt |
| 219 | Installationof PG Clamp |
| 220 | Installationof Alluminium Lug |
| 221 | Installationof Barbed Wire |
| 222 | Installationof TPMO |
| 223 | Carriage of dismentalled material and DT from site to store. |
| 224 | fo|qr forj.k e.My&egjktxat ds v/khu fo|qr forj.k [k.M fupykSy esa dqy 30 vyx& vyx LFkkuksa ij 63 ds0oh0,0 ls 100 ds0oh0,0 ifjorZd {kerko`f) dk dk;Z djk;k tkuk gSA |
| 225 | Safe Carriage. Loading, Unloading of Other Line Item Required for particular work from store location or dump site to work site |
| 226 | Safe Carriage. Loading, Unloading of 100 KVA Distribution Transformer Required for particular work from store location or dump site to work site |
| 227 | Earthing of PCC Pole/Earthing set |
| 228 | Installation of LA |
| 229 | Mounting of 100 KVA Distribution Transformer on Double Pole and dismentalling of 63 KVA Distribution Transformer |
| 230 | Supply of LT PVC Cable 3.5x150/70 sqmm |
| 231 | Supply of Fuse set |
| 232 | Supply of Nut and Bolt |
| 233 | Supply of PG Clamp |
| 234 | Supply of Alluminium Lug |
| 235 | Supply of Barbed Wire |
| 236 | Supply of TPMO |
| 237 | Installation of LT PVC Cable 3.5x150/70 sqmm |
| 238 | Installationof Fuse set |
| 239 | Installationof Nut and Bolt |
| 240 | Installationof PG Clamp |
| 241 | Installationof Alluminium Lug |
| 242 | Installationof Barbed Wire |
| 243 | Installationof TPMO |
| 244 | Carriage of dismentalled material and DT from site to store. |
| 245 | fo|qr forj.k e.My&egjktxat ds v/khu fo|qr forj.k [k.M fupykSy esa dqy 21 vyx& vyx LFkkuksa ij 100 ds0oh0,0 ls 250 ds0oh0,0 ifjorZd {kerko`f) dk dk;Z djk;k tkuk gSA |
| 246 | Safe Carriage. Loading, Unloading of Other Line Item Required for particular work from store location or dump site to work site |
| 247 | Safe Carriage. Loading, Unloading of 250 KVA Distribution Transformer Required for particular work from store location or dump site to work site |
| 248 | Earthing of PCC Pole/Earthing set |
| 249 | Installation of ACSR Weasel Conductor |
| 250 | Installation of LA |
| 251 | Installation of LT PVC Cable 3.5x400 sqmm |
| 252 | Dismentalling of 100 KVA Transformer and safe carriage from site to store. |
| 253 | Supply of Dropper Channel |
| 254 | Supply of Top/Dropper/T-Off Channel Clamp |
| 255 | Supply of Barbed Wire |
| 256 | Supply of Danger Board |
| 257 | Supply of Fuse set |
| 258 | Supply of Nut and Bolt |
| 259 | Supply of PG Clamp |
| 260 | supply of Al Lug |
| 261 | Supply of TPMO |
| 262 | Copper L Piece 50x225x10 mm L.S |
| 263 | Copper L Piece 62x22x12 mm L.S |
| 264 | Installation of Dropper Channel |
| 265 | Installation of Top/Dropper/T-Off Channel Clamp |
| 266 | Installation of Barbed Wire |
| 267 | Installation of Danger Board |
| 268 | Installation of Fuse set |
| 269 | Installation of Nut and Bolt |
| 270 | Installation of PG Clamp |
| 271 | Installation of Al Lug |
| 272 | Installation of TPMO |
| 273 | Installation Copper L Piece 50x225x10 mm L.S |
| 274 | Installation Copper L Piece 62x22x12 mm L.S |
| 275 | Chemical Earthing of 250 KVA Distribution transformer |
| 276 | Making of Plinth of size 2x2x1.5 m and Installlation of Transformer |
| 277 | Pale fencing of Distribution Transformer. |