Execution Of The Scheme Timber Spp. (Teak ) Plantation, With Cattle Proof Trench (Banshi Mahata-0.4 Ha,Shamol Kr. Hansda -0.4 Ha), At Mouza- Palasboni, Rudra, Jl No- 57, 38 Plot, No- 5/425, 2095 G.P- Rudra, Ranibandh, Bankura Total Area : 0.8 Ha Excution Of The Scheme Timber Spp. (Teak ) Plantation Excution Of The Scheme Timber Spp. (Teak ) Plantation, With Cattle Proof Trench (Banshi Mahata-0.4 Ha,Shamol Kr. Hansda -0.4 Ha), At Mouza- Palasboni, Rudra, Jl No- 57, 38 Plot, No- 5/425, 2095 G.P- Rudra, Ranibandh, Bankura Under Rudra Mwc - Pmksy- , Item No.10.01 Page- 45 W.R.D.D.-18 Earthwork In Excavation For Trench Cutting Around Peripheryt Of The Land Considering Model Dimension (100 M X 100 M) For 1Ha . Land For Protectin The Plants From Cattle Grazing.Digging Of Pit With Top Dimension 60 Cm X 45 Cm X And Depth 45 Cm In All Complete.(Sor 2018, I&Wd 1.01, Pg. -1) A. For Excavation Of Cuttle Trench B. Digging Of Pit With Top Dimension 60 Cm X 45 Cm X And Depth 45 Cm , No. 10935/Mkt/It-2/2017 Dt. 30.01.2023 Cost Of Plant (As Per Chief Conservator Of Forests, Headquarters. Of West Bengal . Seedling In Poly-Pots (Teak) Stamp One Year Old , (Item No.1.18 Page- 5, I&Wd-18) Dressing And Chilchalling Flanks Or Slope Of Embankment Including Filling With Earth Or Cutting Upto 150 Mm. Average Thickness And Ramming Properly After Sprinkling Water. , Cutting Uprooting And Clearing Jungles Including Shrubs, Water Weeds, Bushes, Trees, Plants, Upto 30 Cm. Girth Including Removing As Directed By Engineer-In-Charge. , Planting Cost Including Mixing Fertilizer, Placement Of Plants Into Pit, Filling The Pit With Mixed Soil And Firmly Packing, Vegetative Fencing, Gap Filling And Watering Etc. (Excluding Cost Of Fertilizer ).Rate Analysis Per Plant : Assuming 14 Nos Of Plants Will Be Planted Per Labour. Labour Rate As Per Mord,Gol,Mgnregs(W.E.F.27.03.2025) Rs 260.00/No. Hence Planting Cost Per Tree = 260.00/14 = Rs. 18.57 Say Rs. 19.00 / Each Plant , Cost Of Moisture Conservation Cattle Proof Trench. , Cost Of Sign Board Including Painting & Lettering Etc. In All Complete(L/S) , Cost Of Sign Board Including Painting & Lettering Etc. In All Complete(As Per Analysis) , Add Gst 6% For Item No 1 To 9 , Add Gst 6% For Item No 1 To 9 , Add Labour Welfare Cess 1% For Item No 1 To 11