Execution Of The Scheme Mango Plantation, With Cattle Proof Trench (Laxmirani Mandi 0.3 Ha, Kamalakanta Mandi-0.7Ha Pabitra Soren -0.4 Ha,), At Mouza- Bagdiha, Jl No- 70 Plot, No- 15,39,2 ,19 G.P- Rudra, Bankura Total Area : 1.4 Ha Excution Of The Scheme Mango Plantation Excution Of The Scheme Mango Plantation, With Cattle Proof Trench(Laxmirani Mandi 0.3 Ha, Kamalakanta Mandi-0.7Ha Pabitra Soren -0.4 Ha,), At Mouza- Bagdiha, Jl No- 70 Plot, No- 15,39,2 ,19 G.P- Rudra, Bankura Under Rudra Mwc Pmksy Wdc--2.0/06/20 , Item No.10.01 Page- 45 W.R.D.D.-18 Earthwork In Excavation For Trench Cutting Around Peripheryt Of The Land Considering Model Dimension (100 M X 100 M) For 1Ha . Land For Protectin The Plants From Cattle Grazing.Digging Of Pit With Top Dimension 60 Cm X 45 Cm X And Depth 45 Cm In All Complete.(Sor 2018, I&Wd 1.01, Pg. -1) A. For Excavation Of Cuttle Trench B. Digging Of Pit With Top Dimension 60 Cm X 45 Cm X And Depth 45 Cm , (Doh-20013/2/2019-Dd(Doh)-Doh Dt. 06.05.2022 Cost Of Plant (As Per Director Of Horticulture Govt. Of West Bengal File No - Doh-20013/2 /2019-Dd(Doh)-Doh Dt. 06.05.2022) In All Complete. Mango (Var - Amrapali) , (Item No.1.18 Page- 5, I&Wd-18) Dressing And Chilchalling Flanks Or Slope Of Embankment Including Filling With Earth Or Cutting Upto 150 Mm. Average Thickness And Ramming Properly After Sprinkling Water. , Cutting Uprooting And Clearing Jungles Including Shrubs, Water Weeds, Bushes, Trees, Plants, Upto 30 Cm. Girth Including Removing As Directed By Engineer-In-Charge. , Planting Cost Including Mixing , Fertilizers, Placement Oh Plants Into Pit, Filling The Pit With Rate Analysis Per Plant :Assuming 14 Nos Of Plants Will Be Planted Per Labour Rate As Per Mord,Goi,Mgnregs (W.E.F.27.03.2025)Rs 260.00/No. Hence Planting Cost Per Tree=260.00/14=Rs.18.57 Say Rs. 19.00/Each Plant , Cost Of Moisture Conservation Cattle Proof Trench. , Cost Of Sign Board Including Painting & Lettering Etc. In All Complete(As Per Analysis) , Cost Of Sign Board Including Painting & Lettering Etc. In All Complete(L/S) , Add Gst 6% For Item No 1 To 9 , Add Gst 6% For Item No 1 To 9 , Add Labour Welfare Cess 1% For Item No 1 To 11