| 1 | Concrete with 4 cm. guage stone ballast, Fine sand of 1.25 F.M. and cement, in proportion of12:6:1 in foundation and under floors including supply of all materials, labour Tools & plants etc.required for proper completion of thework. |
| 2 | Construction of embankment with approved material (Earth) obtained from borrow pits cartage from 8 km with all lifts and leads, transporting of site, spreading, grading to required slope and compacting to meet requirement of table 300-2 |
| 3 | M-150Brickworkinone cementandfourcorsesand (1:4)infoundationandplinth including supply of all materials labour,T&Petc.Reqd.forproper completion of the work |
| 4 | 12mmthickcementplasterwith cementandcorsesandmortar1:4 overbrickworkthicknessnotless than 1cm including of all workcomplete |
| 5 | Cement Concrete with 20mm gauge approved stone ballast, coarse sand,and cement in the proportion 4:2:1 including supply of all material, labour, tools and Plants etc. requared for proper complition of the work SINo 279 (a) |
| 6 | Construction ofgranularsub-base byprovidingcoarsegraded material, spreading in uniform layerswithmotorgraderonprepared surface, |
| 7 | Construction of un-reinforced plain cement concrete pavement, thickness as per design over a prepared sub base with 43 grade cement or any other type as per clause 1501.2.2 M-30 (Grade), coarse and fine aggregates confirming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less then 0.2 cum capacity and appropriate weight batcher using approved mix design laid in approved fixed side form work (steel channel, laying and fixing of125 micron thick polythene film wedges steel plates including leveling the formwork as per shovels rakes compacted using needle continuous operation including provision of contraction and expansion construction joints as per norms applying debonding strips primer , sealant, dowel bars, near approaches to bridge/ culvert and construction , joints, admixtures as approved, curing of conrete slabs for 14- days, curing compound ( where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 including cost of polythene sheetand also including complete shifting of materials & Concrete etc. |
| 8 | R.C.C. Workwith cement approved coarse sand and 2 cm. gauge approve stone grit in proportions of 1:2:4 in Light beam having spans upto 6M excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary, centering & shuttering etc. and supply of all material, labour, tools & plants etc. required for proper completion of the work including cost of binding wire. The rate excludesmaking of drip course which shall be paid extra. |
| 9 | Providing and fixing of granite inaurgation stone for display board including all work complete |
| 10 | MS (Tor steel or plain)in plain work such as RCC or RB work including binding for proper shape and including supply of steel & its wastage bend, hooks and authorized overlapping shall be measured and including cost for binding wire.SINo. 504 |
| 11 | Add 18% GST |