Replacement Of Acsr Conductor By Covered Conductor Of 11Kv Joshiyara Feeder Under Edd Uttarkashi .
Tender Overview
Project Description
Replacement Of Acsr Conductor By Covered Conductor Of 11Kv Joshiyara Feeder Under Edd Uttarkashi .
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 18-Sep-2025 | Corrigendum for Date extend | Date | 24-Sep-2025 |
BOQ
| Sl. No. | Item Description |
| 1 | Electrical Items : |
| 2 | EARTHWIRE CLAMPFOR SP-55 WITHN/B |
| 3 | PP & CLAMP WITH N&B ST POLE SP-55 |
| 4 | Stay Clamp for SP-55 With Nut & Bolt |
| 5 | 11 KV CABLE TIES FOR PIN INSULATOR |
| 6 | 11 KV IPC FOR COVERED TO COVEREDCOND. |
| 7 | 11 KV IPC FOR COVERED TO BARE CONDUCTOR |
| 8 | 11 KV MID SPAN JOINTING KIT |
| 9 | 11KV AAAC AL-59, 70 SQMM CoveredCond. |
| 10 | 11KV Polyme Pin Ins. (For Convered Cond) |
| 11 | 11 KV Polymer Tension Insulator |
| 12 | 11KV Biometalic crimping insulated lugs |
| 13 | 11 KV TENSION CLAMP WITH BAIL & IPC |
| 14 | Labour (Services) |
| 15 | FABRICATION OF STEEL |
| 16 | EXCAVATION OF PIT FOR STAY SET |
| 17 | ERECTION OF 11 KV STAY SET |
| 18 | GROUTING OF STAY SET |
| 19 | EXCAVATION OF PIT FOR POLE |
| 20 | ERECTION OF SINGLE SP-55 POLE |
| 21 | GROUTING OF POLE |
| 22 | MUFFING OF POLE |
| 23 | DISMANTLING OF SP-21/SP-23 SINGLE POLE |
| 24 | DISMANTLING OF 11 KV LINE(RABBIT) |
| 25 | CARTAGESP-55 POLE, 0-20 KM |
| 26 | CARTAGE OF PETTY MATERIAL,0-20 KM |
| 27 | HEADLOAD CARTAGESP-55 POLE(1-3 KM) |
| 28 | HEADLOAD CARTAGE OF MATERIAL(1-3 KM) |
| 29 | BACK CARTAGE OF PETTY MATERIAL,150-200KM |
| 30 | FIXING OF 11KV 90KN TENSION CLAMP B&IPC |
| 31 | FIXING OF 11 KV SUSPENSION TIES |
| 32 | FIXING OF 11 KV IPC FOR CC TO CC COND. |
| 33 | FIXING OF 11 KV IPC FOR CC TO BARE COND. |
| 34 | FIXING OF 11 KV MID SPAN JOINTING KIT |
| 35 | FIXING OF 11 KV BIMETALIC LUG |
| 36 | BACK HEAD LOAD CART. OF PETTY MAT. 1-3KM |
| 37 | FIXING OF DISC INS. FOR AAAC CONDUCTOR |
| 38 | FIXING OF 11 KV PIN INSULATOR |
| 39 | LAYING, SAGGING OF COVERED COND FOR 11KV |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender