| 1 | Under the Business Plan for the year 2025-26, various materials used for theWork of New/strengthening of 11 KV lines should be collected from the storage centre and safely transported to the respective work site through a kutcha or paved road, which also includes the work of loading and unloading to the respective storage centre and work site, and it also includes the work of pulling etc., and the cost of labour, T&P carrier etc. required to complete the work properly is also included. |
| 2 | PCC Pole 8.5 Mtr Long |
| 3 | ST Pole 11 Mtr Long |
| 4 | 11KV VCB for O/G CTR 200/100/5A, 350 MVA |
| 5 | 11 KV XLPE Cable 3X120 SQ MM |
| 6 | 11 KV XLPE Cable 3X185 SQ MM |
| 7 | Safe cartage of line material viz. conductor, cable, GI earth wire, cross arm, angle, channel, insulator and other line material from store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of dragging. |
| 8 | Erection of 8.5 Mtr. Single PCC Pole including complete. H.T/L.T fittings as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. (Clamps shall be arranged by contractor on his own cost) |
| 9 | Grouting of 8.5 Mtr. Single PCC Poleper RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. (All Civil Material shall be arranged by contractor on his own cost) |
| 10 | Erection of ST Pole 11 Mtr Long including complete. H.T/L.T fittings as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. (Clamps shall be arranged by contractor on his own cost) |
| 11 | Grouting of ST Pole 11 Mtr Long per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. (All Civil Material shall be arranged by contractor on his own cost) |
| 12 | Erection of Double Poleincluding complete. H.T/L.T fittings as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. (Clamps shall be arranged by contractor on his own cost) |
| 13 | Grouting of Double Poleper RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. (All Civil Material shall be arranged by contractor on his own cost) |
| 14 | Erection and Grouting of Stay set Completed including the work of nozelling etc. as per RESPO manual and also including the cost of all grouting material, labour, T&P etc required for proper completion of work. (All Civil Material & Clamps shall be arranged by contractor on his own cost) |
| 15 | Laying, Sagging and Binding & Jumpring of ACSR weasel conductor as per direction of Supervising Engineer. It including the cost of Labour T&P carrier etc required for proper completion of work. |
| 16 | Laying of 11 KV XLPE Cable 3X120 sq mm cableby digging of trench 1050 mm, deep, 750 mm wide its boxing with brick,sand after laying of cable separation of cable by brick wall local sand filling and proper levelling& ramming (all civil & HDPE Pipe/GI Pipe material shall be arranged by contractor on his own cost) |
| 17 | Laying of 11 KV XLPE Cable 3X185 sq mm cableby digging of trench 1050 mm, deep, 750 mm wide its boxing with brick,sand after laying of cable separation of cable by brick wall local sand filling and proper levelling& ramming (all civil & HDPE Pipe/GI Pipe material shall be arranged by contractor on his own cost) |
| 18 | Fixing & Commisioning of Earthing Rod Complete as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 19 | Fixing & Commisioning of Ms Gaurding Angle with Clamp as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 20 | Fixing & Commisioning of Ms Top Channel with clamp as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 21 | Fixing & Commisioning of T-off Chanel 25X65X1300 mm with clampas per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 22 | Fixing & Commisioning of MS Dropper Channel with clamp as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 23 | Installetion of 11KV VCB for O/G CTR 200/100/5A, 350 MVA as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. (all civil & Steel Structure material shall be arranged by contractor on his own cost) |
| 24 | Fixing & Commisioning of 11KV CABLE JOINTING KIT (3X120 SQMM & 3X185SQMM)as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. (Jointing kit arrenge By Contractor On is own Cost) |
| 25 | Fixing & Commisioning of 11KV Straight Through(3X120 SQMM & 3X185SQMM) as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. (Jointing kit arrenge By Contractor On is own Cost) |
| 26 | Strengting of tilted pole |
| 27 | Fabication of Hardware items |
| 28 | Tree looping & chooping |