}

Tender For The Work Of Installation Of New Distribution Transformer In Business Plan-2025-26 Under Edc Hathras - Stone Pad 3 Cross Arm Holding Clamp 4 F Bracket 5 Earthing Complete 6 Al Lug Long Barrel Off Size 7 Holding Clamp 8 M.S Top Channe, hathras-Uttar Pradesh

Dakshinanchal Vidyut Vitran Nigam Limited has published Tender For The Work Of Installation Of New Distribution Transformer In Business Plan-2025-26 Under Edc Hathras - Stone Pad 3 Cross Arm Holding Clamp 4 F Bracket 5 Earthing Complete 6 Al Lug Long Barrel Off Size 7 Holding Clamp 8 M.S Top Channe. Submission Date for this Tender is 15-09-2025. Civil Work Tenders in hathras Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

50938647
Tender For The Work Of Installation Of New Distribution Transformer In Business Plan-2025-26 Under Edc Hathras - Stone Pad 3 Cross Arm Holding Clamp 4 F Bracket 5 Earthing Complete 6 Al Lug Long Barrel Off Size 7 Holding Clamp 8 M.S Top Channe
Tender
Indian
Uttar Pradesh
Hathras
15-09-2025

Tender Details

Tender For The Work Of Installation Of New Distribution Transformer In Business Plan-2025-26 Under Edc Hathras - Stone Pad 3 Cross Arm holding Clamp 4 F Bracket 5 Earthing Complete 6 AL LUG Long Barrel Off Size 7 Holding Clamp 8 M.s Top Channel 125x65x2240 mm 9 MS Dropper Channel 100x50x2028 mm 10 MS Channel T-off 125x65x1300 mm 11 MS Angle T/F base With Clamp and nut,bolt 12 Red Oxide Paint 13 Aluminium Paint 14 Barbed Wire 15 Danger Board 16 Copper L Piece 17 Number Plate 18 Guarding Angle With Clamp 19 Connecting Lead 1x16 sqmm 20 LT Distribution Box Clamp 21 LT Pole Clamp with N&B 22 Earthwire Clamp 23 Suspension Clamp 24 Dead End Clamp 25 PG Clamp 26 I Hook 27 Pearcing Connector 28 Henley Type Tailless Unit Protection Cubicle Panel 500A, 650V 29 LT Fuse Set Protection Unit for 25 KVA DT with SMC Box 30 Clamp for LT T-off Channel with N&B 31 Insulated Weasel Conductor 32 M/s Nut & Bolt 33 Safe Carriage of following material from Electricty store centerHts to Pit site of work through the Kacha and Pakka road includingloading and unloading at the respective ends including the cost of arrangement of labour, T&P, etc. which required for proper completion of work.(Distance 00-50 Kms.) 34 Pcc Pole 8.5 Mtr. Long 35 STP Pole 11 Mtr. Long 36 11 KV Steel Cross Arm V Type 37 11 KV Pin Insulator With Pin 38 11 KV Disc Insulator With Fitting 39 LT Distribution Box 40 Fuse Set 41 Stay set Complete 42 63 KVA 11/0.4 KV T/F 43 100 KVA 11/0.4 KV T/F 44 250 KVA 11/0.4 KV T/F 45 LT XLPE/PVC Cable 3.5x70 Sqmm 46 LT XLPE/PVC Cable 3.5x150 Sqmm 47 LT XLPE/PVC Cable 1x400 Sqmm 48 LT ABC Cable 3x120+1x95+1x16 sqmm 49 LT ABC Cable 3x95+1x70+1x16 sqmm 50 ACSR Rabbit Conductor 51 ACSR Weasel Conductor 52 11 kv XLPE Cable 3x120 sqmm 53 Cable Jointing Kit 11 kv XLPE Cable 3x120 sqmm 54 G.I Wire 55 11 KV TPMO with Polymer Insualator 56 Errection of following Poles with grouting including Cutting of kharanja/mettalic road/concrete portion while digging pit & complete H.T./L.T. fittings as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. 57 Pcc Pole 8.5 Mtr. Long 58 STP Pole 11 Mtr. Long 59 Fixing/ Errection of following item, cost of labor, material and T&P which required for completion of work 60 Stone Pad 61 Cross Arm holding Clamp 62 F Bracket 63 AL LUG Long Barrel Off Size 64 Holding Clamp 65 M.s Top Channel 125x65x2240 mm 66 MS Dropper Channel 100x50x2028 mm 67 MS Channel T-off 125x65x1300 mm 68 MS Angle T/F base With Clamp and nut,bolt 69 Red Oxide Paint 70 Aluminium Paint 71 Barbed Wire 72 Danger Board 73 Copper L Piece 74 Number Plate 75 LT Distribution Box With Clamp 76 Earthwire Clamp 77 PG Clamp 78 Henley Type Tailless Unit Protection Cubicle Panel 500A, 650V 79 LT Fuse Set Protection Unit for 25 KVA DT with SMC Box 80 Clamp for LT T-off Channel with N&B 81 M/s Nut & Bolt 82 11 KV Steel Cross Arm V Type 83 11 KV Pin Insulator With Pin 84 11 KV Disc Insulator With Fitting 85 Fuse Set 86 11 KV TPMO with Polymer Insualator 87 LT Pole Clamp with N&B 88 Suspension Clamp 89 Dead End Clamp 90 Cable Jointing Kit 11 kv XLPE Cable 3x120 sqmm 91 I Hook 92 Installation of63 KVA 11/0.4 KV T/F on newly constructed double pole in proper alignment direction & making HT/LT connection. 93 Installation of63 KVA 11/0.4 KV T/F on newly constructed double pole in proper alignment direction & making HT/LT connection. 94 Installation of 250 KVA T/F on newly/Old constructed Plinth in proper alignment direction & making HT/LT connection all Cost of labour and T&P which required for completion of work 95 Safe Dismenteling of old Conductor/Linewith opening of all HT/LT Jumpers,all works which required for dismentling ofLine. 96 Errection and grouting of stays as per RESPO Norms and as per direction of supervising engineer. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost. 97 Fixing of earthing rod as per RESPO Norms and as per direction of supervising engineer. 98 Laying, sagging and stringing and jumpering / binding etc. ofnew &old ACSR Weasal conductor/GIin 11 KV/LT lines as per RESPO manual and as per direction of supervising engineer. 99 LT XLPE/PVC Cable 3.5x70 Sqmm 100 LT XLPE/PVC Cable 3.5x150 Sqmm 101 LT XLPE/PVC Cable 1x400 Sqmm 102 LT ABC Cable 3x120+1x95+1x16 sqmm 103 LT ABC Cable 3x95+1x70+1x16 sqmm 104 ACSR Rabbit Conductor 105 ACSR Weasel Conductor 106 11 kv XLPE Cable 3x120 sqmm 107 Connecting Lead 1x16 sqmm 108 Insulated Weasel Conductor 109 Construction of plinth of size 2x2x1.5 M above ground level one ft below the ground level of 9 After Exavation of 4 earth brick ballast shall be provided and rammering willbe done properly After ballast shall be provided and rammering will be done properly After that a retaining wall 9width by fist class brick in ratio 1:4 of cement & sand shall be made . The earth shall be filled up to one ft.below the top of the plinth After this brick ballast shall be provided upto 6from the earth level and proper rammering shall be done one No. jall of 12 mm MS tor shall be fixed in the hollow of plinth and one ft. thick RCC in ratio of cement sand & stone ballast shall be laid on the top of the plinth. The 12 mm thick plastering shall be done all round the plinth in 1:4 ratio of cement and sand. 110 Pipe & Water Level earthing of 250 KVA medium Power Transformers 111 Net Fencing Shall be 1150*1200 mm made of 35*35 mm MS Angle covered by expended netal 14 SWG up to full Height 1200 mm duly steftened by MS flat by an 8 SWG dia bolt & nut 112 Cutting,chopping of Tree Branches 113 Re Guarding / Guarding of 11 KV line by laying, stringing, sagging and binding of 2 Nos. parallel GI wire 6 SWG after providing, fabrication and fixing of guarding angle and fabrication and fixing of X-guards (Tillis) of GI wire at distance of 3 Mtr. 114 Back Cartage of Following Material and carriage it up to Store Hathras/ J.E Storeall cost of labour and T&P which required for completion of work 115 Iron Scrap 116 AB Cable/Weasel Scrap

Key Value

Document Fees
INR 5900 /-
EMD
INR 108000.0 /-
Tender Value
Refer document

Attachment

FileName File Description File Size
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail