| 1 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. |
| 2 | Collection and supply of M.sandand filling in to the basement including cost and conveyanceto the siteand all labour charges for filling as per standard speecifications. |
| 3 | Cement Concrete 1:4:8 mix using 40mm HBG metal for foundation includingwatering wherever necessary and laid in layers of not more than 15cm thick, compacting etc., complete complying with standard specifications and as directed. |
| 4 | Refilling the basement with Conveyead gravel from approved quarrycomplying the Standard specification |
| 5 | Rainforce Cement concrete 1: 11/2:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary and bearing surfaces of walls , sides and bottom of the slabs, beams etc., shall be and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. |
| 6 | Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications. |
| 7 | Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc,Complete complying with stanard specification.(MS |
| 8 | Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid) |
| 9 | Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid) |
| 10 | Brick jelly lime concrete using 40mm brick jelly with slacked lime in the ratio of 32:12.5,and finishing etc complete for10 cum.including cost and conveyance of all materials to site and all labour charges for mixing , laying |
| 11 | One coarse Pressed tiles of using with Cm1:3 mix using pressed tiles including all cost and conveyancecharges and all labour charges etc., |
| 12 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCCsurface of ceiling including finishing the joints smoothy with grinding machineand the surface shall be thoroughly cleaned out of dust and scrubbing. Surface shall then be allowed to dry for atleast 48 hours [The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty should be got approved by the Executive Engineer before use on work. (Based on SoR 2023-24) |
| 13 | Plastering with CM 1:5, 12mm thick. In all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers. |
| 14 | Colour washing two costs with Oil Bounded Distemper insideinside includingcostof lime with colour pigments including labourcharges etc.complete |
| 15 | Colour washing two coats with exteriar oil bounded emulson in approved quality & Colour including cost& conveyence of all to works site etc., complete |
| 16 | Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum |
| 17 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} |