Restoration of pumping machinery, sub stations and other allied electro- mechanical equipment installed in different stations under the juridiction of Jal Shakti PHE Division samba which were damaged due to flash flood under SDRF- 1 Rewinding of Submersible Motors along with providing & fitting of submersible cable leads, each of length 1 mtr. and of suitable specification. 2 Complete rewinding of 5 HP submersible motor. The job includes repairs to submersible motor rotor shaft by turning, finishing & polishing, Fabrication & fitting of bushes in bush housing-2set. P/F of thrust pad 01 set. P/F of studs with nuts and T-bolts (08 nos.) in place of damaged studs/nuts/bolts as per requirement, Complete assembling of submersible motor & testing in the test pit. Complete job includes cost of material and labour charges. 3 Complete rewinding of 7.5 HP submersible motor. The job includes repairs to submersible motor rotor shaft by turning, finishing & polishing, Fabrication & fitting of bushes in bush housing-2set. P/F of thrust pad 01 set. P/F of studs with nuts and T-bolts (08 nos.) in place of damaged studs/nuts/bolts as per requirement, Complete assembling of submersible motor & testing in the test pit. Complete job includes cost of material and labour charges. 4 Complete rewinding of 10 HP submersible motor. The job includes repairs to submersible motor rotor shaft by turning, finishing & polishing, Fabrication & fitting of bushes in bush housing-2set. P/F of thrust pad 01 set. P/F of studs with nuts and T-bolts (08 nos.) in place of damaged studs/nuts/bolts as per requirement, Complete assembling of submersible motor & testing in the test pit. Complete job includes cost of material and labour charges. 5 Complete rewinding of 12.5 HP submersible motor. The job includes repairs to submersible motor rotor shaft by turning, finishing & polishing, Fabrication & fitting of bushes in bush housing-2set. P/F of thrust pad 01 set. P/F of studs with nuts and T-bolts (08 nos.) in place of damaged studs/nuts/bolts as per requirement, Complete assembling of submersible motor & testing in the test pit. Complete job includes cost of material and labour charges. 6 Complete rewinding of 15 HP submersible motor. The job includes repairs to submersible motor rotor shaft by turning, finishing & polishing, Fabrication & fitting of bushes in bush housing-2set. P/F of thrust pad 01 set. P/F of studs with nuts and T-bolts (08 nos.) in place of damaged studs/nuts/bolts as per requirement, Complete assembling of submersible motor & testing in the test pit. Complete job includes cost of material and labour charges. 7 Complete rewinding of 17.5 HP submersible motor. The job includes repairs to submersible motor rotor shaft by turning, finishing & polishing, Fabrication & fitting of bushes in bush housing-2set. P/F of thrust pad 01 set. P/F of studs with nuts and T-bolts (08 nos.) in place of damaged studs/nuts/bolts as per requirement, Complete assembling of submersible motor & testing in the test pit. Complete job includes cost of material and labour charges. 8 Complete rewinding of 20 HP submersible motor. The job includes repairs to submersible motor rotor shaft by turning, finishing & polishing, Fabrication & fitting of bushes in bush housing-2set. P/F of thrust pad 01 set. P/F of studs with nuts and T-bolts (08 nos.) in place of damaged studs/nuts/bolts as per requirement, Complete assembling of submersible motor & testing in the test pit. Complete job includes cost of material and labour charges. 9 Complete rewinding of 22.5 HP submersible motor. The job includes repairs to submersible motor rotor shaft by turning, finishing & polishing, Fabrication & fitting of bushes in bush housing-2set. P/F of thrust pad 01 set. P/F of studs with nuts and T-bolts (08 nos.) in place of damaged studs/nuts/bolts as per requirement, Complete assembling of submersible motor & testing in the test pit. Complete job includes cost of material and labour charges. 10 Complete rewinding of 25 HP submersible motor. The job includes repairs to submersible motor rotor shaft by turning, finishing & polishing, Fabrication & fitting of bushes in bush housing-2set. P/F of thrust pad 01 set. P/F of studs with nuts and T-bolts (08 nos.) in place of damaged studs/nuts/bolts as per requirement, Complete assembling of submersible motor & testing in the test pit. Complete job includes cost of material and labour charges. 11 Complete Rewinding of Induction motors 12 Disconnecting the electrical connections, disengaging the coupling pulley set, foot bolts of Horizontal Centrifugal Motor. 13 Carriage of the HC motor by head load nearest roadside and loading of the same into the mechanical transport for carriage to the workshop for head load 0-1 km 14 Disassembling the Rotor & Stator of HC motor. (at work shop/at site) 15 Reconditioning of Rotor shaft by way of welding, turning and finishing as per required size. 16 Assembling the Rotor & Stator of HC motor. (at work shop/at site) 17 Back Carriage of repaired HC motor by head load from the nearest roadside to the site for head load 0-1 km 18 Fitting of Horizontal centrifugal motor on the base frame by way of engaging the coupling pulley set, fitting of foot bolts, making of electrical connections , making alignment with the pump and testing thereof. 19 Horizontal Squirrel cage High Speed Induction Motors 20 Complete rewinding of 20 HP induction motor. 21 Complete rewinding of 25 HP induction motor. 22 Complete rewinding of 30 HP induction motor. 23 Complete rewinding of 35 HP induction motor. 24 Complete rewinding of 40 HP induction motor. 25 Complete rewinding of 50 HP induction motor. 26 Complete rewinding of 60 HP induction motor. 27 Complete rewinding of 75 HP induction motor. 28 Complete rewinding of 80 HP induction motor. 29 Complete rewinding of 100 HP induction motor. 30 Repair to rotor of 20 HP induction motor. The job includes repairs to induction motor rotor shaft by turning, finishing to size & polishing, Fabrication & fitting of C.I. sleeves of exact size - 02 nos to end covers. P/F of bearings of reputed make at DE and NDE as per sample. P/F of studs, nuts and bolts in place of damaged studs/nuts/bolts as per requirement, Complete assembling of induction motor & testing at no load. Complete job 31 Repair to rotor of 25 HP induction motor. The job includes repairs to induction motor rotor shaft by turning, finishing to size & polishing, Fabrication & fitting of C.I. sleeves of exact size - 02 nos to end covers. P/F of bearings of reputed make at DE and NDE as per sample. P/F of studs, nuts and bolts in place of damaged studs/nuts/bolts as per requirement, Complete assembling of induction motor & testing at no load. Complete job 32 Repair to rotor of 30 HP induction motor.The job includes repairs to induction motor rotor shaft by turning, finishing to size & polishing, Fabrication & fitting of C.I. sleeves of exact size - 02 nos to end covers. P/F of bearings of reputed make at DE and NDE as per sample. P/F of studs, nuts and bolts in place of damaged studs/nuts/bolts as per requirement, Complete assembling of induction motor & testing at no load. Complete job 33 Repair to rotor of 35 HP induction motor. The job includes repairs to induction motor rotor shaft by turning, finishing to size & polishing, Fabrication & fitting of C.I. sleeves of exact size - 02 nos to end covers. P/F of bearings of reputed make at DE and NDE as per sample. P/F of studs, nuts and bolts in place of damaged studs/nuts/bolts as per requirement, Complete assembling of induction motor & testing at no load. Complete job 34 Repair to rotor of 40 HP induction motor. The job includes repairs to induction motor rotor shaft by turning, finishing to size & polishing, Fabrication & fitting of C.I. sleeves of exact size - 02 nos to end covers. P/F of bearings of reputed make at DE and NDE as per sample. P/F of studs, nuts and bolts in place of damaged studs/nuts/bolts as per requirement, Complete assembling of induction motor & testing at no load. Complete job 35 Repair to rotor of 50 HP induction motor. The job includes repairs to induction motor rotor shaft by turning, finishing to size & polishing, Fabrication & fitting of C.I. sleeves of exact size - 02 nos to end covers. P/F of bearings of reputed make at DE and NDE as per sample. P/F of studs, nuts and bolts in place of damaged studs/nuts/bolts as per requirement, Complete assembling of induction motor & testing at no load. Complete job 36 Repair to rotor of 60 HP induction motor. The job includes repairs to induction motor rotor shaft by turning, finishing to size & polishing, Fabrication & fitting of C.I. sleeves of exact size - 02 nos to end covers. P/F of bearings of reputed make at DE and NDE as per sample. P/F of studs, nuts and bolts in place of damaged studs/nuts/bolts as per requirement, Complete assembling of induction motor & testing at no load. Complete job 37 Repair to rotor of 75 HP induction motor. The job includes repairs to induction motor rotor shaft by turning, finishing to size & polishing, Fabrication & fitting of C.I. sleeves of exact size - 02 nos to end covers. P/F of bearings of reputed make at DE and NDE as per sample. P/F of studs, nuts and bolts in place of damaged studs/nuts/bolts as per requirement, Complete assembling of induction motor & testing at no load. Complete job 38 Repair to rotor of 80 HP induction motor. The job includes repairs to induction motor rotor shaft by turning, finishing to size & polishing, Fabrication & fitting of C.I. sleeves of exact size - 02 nos to end covers. P/F of bearings of reputed make at DE and NDE as per sample. P/F of studs, nuts and bolts in place of damaged studs/nuts/bolts as per requirement, Complete assembling of induction motor & testing at no load. Complete job 39 Repair to rotor of 100 HP induction motor. The job includes repairs to induction motor rotor shaft by turning, finishing to size & polishing, Fabrication & fitting of C.I. sleeves of exact size - 02 nos to end covers. P/F of bearings of reputed make at DE and NDE as per sample. P/F of studs, nuts and bolts in place of damaged studs/nuts/bolts as per requirement, Complete assembling of induction motor & testing at no load. Complete job 40 Cleaning, drying, varnishing, and testing of flood-affected 20 HP induction motor 41 Cleaning, drying, varnishing, and testing of flood-affected 25 HP induction motor 42 Cleaning, drying, varnishing, and testing of flood-affected 30 HP induction motor 43 Cleaning, drying, varnishing, and testing of flood-affected 35 HP induction motor 44 Cleaning, drying, varnishing, and testing of flood-affected 40 HP induction motor 45 Cleaning, drying, varnishing, and testing of flood-affected 50 HP induction motor 46 Cleaning, drying, varnishing, and testing of flood-affected 60 HP induction motor 47 Cleaning, drying, varnishing, and testing of flood-affected 75 HP induction motor 48 Cleaning, drying, varnishing, and testing of flood-affected 80 HP induction motor 49 Cleaning, drying, varnishing, and testing of flood-affected 100 HP induction motor 50 Replacement of parts of different capacities of transformers 51 Providing and fitting of New LV Leg Coils Copper (DPC) 52 250 KVA 53 100 KVA 54 63 KVA 55 Providing and fitting of New LV Leg Coils Aluminum (DPC) 56 250 KVA 57 100 KVA 58 63 KVA 59 Providing and fitting of New HV Leg Coils Copper 60 250 KVA 61 100 KVA 62 63 KVA 63 Providing and fitting of New HV Leg Coils Aluminum 64 250 KVA 65 100 KVA 66 63 KVA 67 Providing and Fitting of HV Bushing 68 250 KVA 69 100 KVA 70 63 KVA 71 Providing and Fitting of LV Bushing 72 250 KVA 73 100 KVA 74 63 KVA 75 Providing and Fitting of LV bush rod (metal part) 76 250 KVA 77 100 KVA 78 63 KVA 79 Providing and Fitting of HT bush rod (metal part) 80 250 KVA 81 100 KVA 82 63 KVA 83 Providing and Fitting of Gasket Set 84 250 KVA 85 100 KVA 86 63 KVA 87 Providing and Fitting of LT Terminal Plate 88 250 KVA 89 100 KVA 90 63 KVA 91 Providing and Fitting of Oil drain valve 92 250 KVA 93 100 KVA 94 63 KVA 95 Providing and Fitting of core laminations 96 250 KVA 97 100 KVA 98 63 KVA 99 Providing and Fitting of SundryItems 100 250 KVA 101 100 KVA 102 63 KVA 103 Arresting of oil leakages if any by way of welding etc. 104 250 KVA 105 100 KVA 106 63 KVA 107 Heat Treatment of repaired transformer 108 250 KVA 109 100 KVA 110 63 KVA 111 Providing and filling of fresh transformer oil at site 112 250 KVA 113 100 KVA 114 63 KVA 115 Disconnecting of distribution transformer HT links and HT/LT sidde cables. Dismounting the transformer from poles/platform using crane and skilled labour and loading into the meachanical transport. 116 250 KVA 117 100 KVA 118 63 KVA 119 Draining of transformer oil in barrels, dismantling of top cover and extracting out assembly using chain pulley block and tripod and checking for fault. 120 250 KVA 121 100 KVA 122 63 KVA 123 Washing and cleaning of the oil tank with appropriate cleaning agents after draining of contaminated oil and drying it to make it usable 124 250 KVA 125 100 KVA 126 63 KVA 127 Assembling of transformer and lowering into the tank using chain pullry block and tripod. Assembling of top cover thereof and filling of transformer oil after dehydrating. 128 250 KVA 129 100 KVA 130 63 KVA 131 Loading of transformer into mechanical transport using crane and skilled labour. Mounting the transformer on poles/platform with the help of crane and skilled labour. Making of LT as well as HT side cable connections, charging the transformer on no load conditions and thereafter checking on full load conditions. 132 250 KVA 133 100 KVA 134 63 KVA 135 Rebate on account of copper scrap 136 250 KVA 137 100 KVA 138 63 KVA 139 Rebate on account of aluminum scrap 140 250 KVA 141 100 KVA 142 63 KVA 143 Rebate on account of Old T-Oil 144 250 KVA 145 100 KVA 146 63 KVA 147 Providing and fitting of LA set 148 Providing and fitting of Link set 149 Providing and fitting of DO set 150 Providing and fitting of channels 151 HT Line 152 Re-erection of uprooted/ tilted PCC pole 153 Re-erection of uprooted/ tilted Tubular pole 154 Replacing damaged PCC pole by way of providing and erecting new PCC pole along with accessories. 155 Replacing damaged Tubular pole by way of providing and erecting new Tubular pole along with accessories. 156 Laying of HT line along by way of provind of HT pole, conductor and allied accessories. 157 Electric Substation 158 Creation of new 63 KVA electric substation of providing and erection of 2 no 9 mtrs PCC poles along with laying of conductors as per site requirement. Providing and fitting of angle frames, 11 KV kinfe edge link set, 11 KV HG set, 11 KV LA set, 11 KV pin insulators, ACSR conductors, dogs for HT load/ jumper and fuse set for electric poles and making necessary electrical connections 159 Creation of new 100 KVA electric substation of providing and erection of 2 no 9 mtrs PCC poles along with laying of conductors as per site requirement. Providing and fitting of angle frames, 11 KV kinfe edge link set, 11 KV HG set, 11 KV LA set, 11 KV pin insulators, ACSR conductors, dogs for HT load/ jumper and fuse set for electric poles and making necessary electrical connections 160 Creation of new 250 KVA electric substation of providing and erection of 2 no 9 mtrs PCC poles along with laying of conductors as per site requirement. Providing and fitting of angle frames, 11 KV kinfe edge link set, 11 KV HG set, 11 KV LA set, 11 KV pin insulators, ACSR conductors, dogs for HT load/ jumper and fuse set for electric poles and making necessary electrical connections 161 Erection of uprooted/ tilted Substation by way of creating new foundation, angle frames and laying of conductors as per site requirement. 162 Earthing of sub station using chemical earthing 163 Replacement of parts LT Control panels, voltage stabilizers etc. 164 Replacement of damaged MNX 50 165 Replacement of damaged MNX 70 166 Replacement of damaged MNX 95 167 Replacement of damaged MNX 110 168 Replacement of damaged MNX 140 169 Replacement of damaged kit of MNX 50 170 Replacement of damaged kit of MNX 70 171 Replacement of damaged kit of MNX 95 172 Replacement of damaged kit of MNX 110 173 Replacement of damaged kit of MNX 140 174 Replacement of damaged Voltmeter 175 Replacement of damaged Ampere meter 176 Replacement of damaged Selector switch 177 Replacement of damaged CT Coil 178 Replacement of damaged MPR( Gardian Make) 179 Replacement of damaged overload relay 180 Replacement of damaged under voltage relay 181 Replacement of damaged over voltage relay 182 Replacement of damaged single phase/ reverse phase relay 183 Replacement of damaged internal wiring 184 Replacement of damaged MCCB-100 Amp 185 Replacement of damaged MCCB-125 Amp 186 Replacement of damaged MCCB-160 Amp 187 Replacement of damaged MCCB-250 Amp 188 Repair to Star Delta Starters of capacity 20 HP/30 HP by way of replacement of damaged contact points, no-load coil, contact point holders, replacement of T-Oil and testing on load. 189 Repair to Star Delta Starters of capacity 40 HP/50 HP by way of replacement of damaged contact points, no-load coil, contact point holders, replacement of T-Oil and testing on load. 190 Repair to Star Delta Starters of capacity 60 / 70 HP by way of replacement of damaged contact points, no-load coil, contact point holders, replacement of T-Oil and testing on load. 191 Repair to Star Delta Starters of capacity 80 HP/100 HP by way of replacement of damaged contact points, no-load coil, contact point holders, replacement of T-Oil and testing on load. 192 Repair to Star Delta Starters of capacity 100 HP/120 HP by way of replacement of damaged contact points, no-load coil, contact point holders, replacement of T-Oil and testing on load. 193 Servicing of LT Control Panel affected by flood water 194 Servicing of Star Delta Starter affected by flood water 195 63 KVA Manual Voltage Stablizer 196 Rewinding of copper coils 197 Providing and fitting of Rotary switch as per size 198 Providing and Fitting of Change over switch 160 Ampere 199 Providing and Fitting of MCCB of 200 Ampere capacity. 200 Providing and Fitting of Indicator switch 201 Providing and Fitting of selector switch and voltmeter 202 Providing and Fitting of selector switch and ammeter with CT set. 203 Providing and Fitting of Nut bolts 204 Providing and Filling of Fresh Transformer Oil 205 Complete wiring job with insulator 206 Repair of the stabilizer tank by welding and complete Painting 207 Sundry items 208 Labour charges for disconnecting the electrical connections of stabilizer , repair of stabilizer at workshop, making electrical connections of repaired atabilizer at site and thereafter checking on full load conditions. 209 Crane Charges for handling of stabilizer at site and loading into the mechanical transport for repairs and unloading of stabilizer after repairs from mechanical transport to site. 210 Draining of contaminated oil from stabilizer, washing and cleaning the oil tank with appropriate cleaning agents and drying it to make it usable 211 Rebate on account of copper scrap 212 Rebate on account of old T-oil 213 100 KVA Manual Voltage Stablizer 214 Rewinding of copper coils 215 Providing and fitting of Rotary switch as per size 216 Providing and Fitting of Change over switch 160 Ampere 217 Providing and Fitting of MCCB of 200 Ampere capacity. 218 Providing and Fitting of Indicator switch 219 Providing and Fitting of selector switch and voltmeter 220 Providing and Fitting of selector switch and ammeter with CT set. 221 Providing and Fitting of Nut bolts 222 Providing and Filling of Fresh Transformer Oil 223 Complete wiring job with insulator 224 Repair of the stabilizer tank by welding and complete Painting 225 Sundry items 226 Labour charges for disconnecting the electrical connections of stabilizer , repair of stabilizer at workshop, making electrical connections of repaired atabilizer at site and thereafter checking on full load conditions. 227 Crane Charges for handling of stabilizer at site and loading into the mechanical transport for repairs and unloading of stabilizer after repairs from mechanical transport to site. 228 Draining of contaminated oil from stabilizer, washing and cleaning the oil tank with appropriate cleaning agents and drying it to make it usable 229 Rebate on account of copper scrap 230 Rebate on account of old T-oil 231 250 KVA Manual Voltage Stablizer 232 Rewinding of copper coils 233 Providing and fitting of Rotary switch as per size 234 Providing and Fitting of Change over switch 160 Ampere 235 Providing and Fitting of MCCB of 200 Ampere capacity. 236 Providing and Fitting of Indicator switch 237 Providing and Fitting of selector switch and voltmeter 238 Providing and Fitting of selector switch and ammeter with CT set. 239 Providing and Fitting of Nut bolts 240 Providing and Filling of Fresh Transformer Oil 241 Complete wiring job with insulator 242 Repair of the stabilizer tank by welding and complete Painting 243 Sundry items 244 Labour charges for disconnecting the electrical connections of stabilizer, repair of stabilizer at workshop, making electrical connections of repaired atabilizer at site and thereafter checking on full load conditions. 245 Crane Charges for handling of stabilizer at site and loading into the mechanical transport for repairs and unloading of stabilizer after repairs from mechanical transport to site. 246 Draining of contaminated oil from stabilizer, washing and cleaning the oil tank with appropriate cleaning agents and drying it to make it usable 247 Rebate on account of copper scrap 248 Rebate on account of old T-oil 249 Providing and fitting of submersible / copper / LT Al cables, main switches, Star Delta Starters / MUG panels of various capacities. 250 Providing and fitting of HRC Type TP Main Switch -100 Amp 251 Providing and fitting of HRC Type TP Main Switch -200 Amp 252 Providing and fitting ofHRC Type TP Main Switch - 400 Amp 253 Providing and fitting of LT 3-½ core Al. Arrmoured cable with new one of size 70mm² including laying and cost of thimbles 254 Providing and fitting of LT 3-½ core Al. Arrmoured cable with new one of size 95mm² per meter including laying and cost of thimbles 255 Providing and fitting of LT 3-½ core Al. Arrmoured cable with new one of size 120mm² per meter including laying and cost of thimbles 256 Providing and fitting of LT 3-½ core Al. Arrmoured cable with new one of size 150mm² per meter including laying and cost of thimbles 257 Providing and fitting of LT 3-½ core Al. Arrmoured cable with new one of size 185mm² per meter including laying and cost of thimbles 258 Providing and fitting of multistrand copper cable with new one of size 16mm² per meter including laying and cost of thimbles 259 Providing and fitting of multistrand copper cable with new one of size 25mm² per meter including laying and cost of thimbles 260 Providing and fitting of multistrand copper cable with new one of size 35mm² per meter including laying and cost of thimbles 261 Providing and fitting of multistrand copper cable with new one of size 50mm² per meter including laying and cost of thimbles 262 Providing and fitting of multistrand copper cable with new one of size 70mm² per meter including laying and cost of thimbles 263 Providing and fitting of submerssible copper cable with new one of size 6mm² per meter including laying and cost of thimbles 264 Providing and fitting of submerssible copper cable with new one of size 10mm² per meter including laying and cost of thimbles 265 Providing and fitting of submerssible copper cable with new one of size 16mm² per meter including laying and cost of thimbles 266 Providing & Fitting of Star Delta Starters 267 10 HP 268 20 HP 269 30 HP 270 40 HP 271 50 HP 272 60 Hp 273 70 HP 274 80 HP 275 90 HP 276 100 HP 277 Providing & Fititng ofMU-G Panels 278 MU-G 10 279 MU-G 20 280 MU-G 30 281 MU-G 40 282 MU-G 50 283 Extraction and lowering of submersible pump sets. 284 Extraction of submersible pump set having G.I. / M.S. pipe flanged column assembly from deep bore tube wells and lowering of the repaired submersible pump set after coupling and jointing of submersible cable with the connection cables. Lowering the submersible pump along with column pipes one by one using chain pulley block (manually or by long boom crane). The flanges shall have to be tightened by placing rubber insertion sheets and suitable nuts, bolts and washers etc (nuts, bolts, washers, rubber insertion sheets, patch rolls, insulation tapes to be provided by contractor) with due care under the jurisdiction of Jal Shakti PHE Division Samba as per details below: 285 Column pipes having 50 / 65 / 80 mm dia up to a depth of 30 meters (Pump dia 100 / 150 / 200 mm) 286 Column pipes having 50 / 65 / 80 mm dia up to a depth of 60 meters (Pump dia 100 / 150 / 200 mm) 287 Column pipes having 50 / 65 / 80 mm dia up to a depth of 130 meters (Pump dia 100 / 150 / 200 mm) 288 Column pipes having 100 mm dia up to a depth of 50 meters (Pump dia 150 / 200 mm) 289 Submersible pump set from the Dugwells / open wells. 290 Dewatering and cleaning of dugwells affected by silt accumulation due to flooding