|
| 1 | Carriage of Following line materials from ESC, Muzaffarnagar to work sites including safe loading and unloading at both ends as per site condition :- |
| 2 | 25 KVA T/F |
| 3 | 100 KVA T/F |
| 4 | 250 KVA T/F |
| 5 | ACSR Weasel conductor |
| 6 | 11 KV poly pin insulator |
| 7 | 11 KV poly disc insulator with fitting |
| 8 | LT Al. XLPE Cable 1x240 sqmm |
| 9 | LT Al. XLPE Cable 1x120 sqmm |
| 10 | LT PVC Cable Al. 4x16 sqmm. |
| 11 | ABC 3x95+1x70+1x16 sqmm |
| 12 | ABC 3x120+1x95+1x16 sqmm |
| 13 | ABC 3x50+1x35+1x16 sqmm |
| 14 | LT PVC Cable Al. 3.5x400 sqmm |
| 15 | Stay Set complete |
| 16 | PCC 8.5 mtr. |
| 17 | 11 KV fuse set |
| 18 | MS Angle/Channel |
| 19 | MS Earting rod complete |
| 20 | 11 KV Distribution Box |
| 21 | 11 KV TPMO |
| 22 | Errection of PCC 8.5 mtr. with all Accessories as per norms (Nuts, Bolts, Washer and all typeClamps will be provided by contractor) |
| 23 | Errection of Double Pole Structure and fixing allAccessories as per norms (Nuts, Bolts, Washer and all type Clamps will be provided by contractor) |
| 24 | Fabrication of MS Angle/Channel |
| 25 | Grouting of PCC pole with cement, sand, bricks CC ratio1:4:5 as per RESPO norms (all materila provided by contractor) |
| 26 | Errection of fuse set on double pole and making connection properly |
| 27 | Providing and Laying of LT PVC Cable Al. 3.5x70 sqmm |
| 28 | Laying of LT PVC Cable Al. 3.5x400 sqmm |
| 29 | Laying of ACSR Weasel conductor |
| 30 | Laying of AB cable 3x120 sqmm |
| 31 | Laying of AB cable 3x50 sqmm |
| 32 | Laying of LT Al. XLPE Cable 1x240 Sqmm |
| 33 | Laying of LT Al. XLPE Cable 1x120 Sqmm |
| 34 | Laying of LT PVC Cable 4x16 Sqmm |
| 35 | Laying of LT Al. AB cable 3x95+1x70+1x16 sqmm |
| 36 | Mounting of 25/100 KVA T/F at double pole and making proper connection as per norms (Nut, bolts, clamps and lugs will be provided by contractor). |
| 37 | Mounting of 250 KVA T/F at Plinth and making proper connection as per norms (Nut, bolts, clamps and lugs will be provided by contractor). |
| 38 | Errection of earthing complete as per norms. |
| 39 | Complete work of installation and commissioning of 11 KV Distribution box |
| 40 | Complete work of installation and commissioning of TPMO |
| 41 | Complete work of installation and commissioning of Stay Set Complete |
| 42 | Grouting of Stay road with cement, sand, bricks CC ratio1:4:5 as per RESPO norms (all materila provided by contractor) |
| 43 | Providing and fixing of LT Fuse Box Unit at DT |
| 44 | Providing and fixing of Danger Board |
| 45 | Providing and fixing of GI Wire |
| 46 | Chemical earthing of 250 KVA T/F |
| 47 | Providing of fancing for 250 KVA T/F as per norms |
| 48 | Providing and fixing of Tail Less Unit for 250 KVA T/F as per norms. |
| 49 | Dismentling of Following line materials and carriage from work site to ESC, Muzaffarnagar including safe loading and unloading at both ends:- |
| 50 | 10 KV T/F old and used |
| 51 | 100 KV T/F old and used |