}

Tender For Bp 2025-26 Verious Work Under Edd Budhana - Under Business Plan Work 2024-25 Incresing Capacity Of Medium Distribution Transformer 100Kva To 250 Kva In Village Ukawali, Husanpur(Kurasiyo Wala Joda), Vill. Moh.Pur Raising Canera Bank And Constru, budhana-Uttar Pradesh

Paschimanchal Vidyut Vitran Nigam Limited has published Tender For Bp 2025-26 Verious Work Under Edd Budhana - Under Business Plan Work 2024-25 Incresing Capacity Of Medium Distribution Transformer 100Kva To 250 Kva In Village Ukawali, Husanpur(Kurasiyo Wala Joda), Vill. Moh.Pur Raising Canera Bank And Constru. Submission Date for this Tender is 15-09-2025. Civil Work Tenders in budhana Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

50916395
Tender For Bp 2025-26 Verious Work Under Edd Budhana - Under Business Plan Work 2024-25 Incresing Capacity Of Medium Distribution Transformer 100Kva To 250 Kva In Village Ukawali, Husanpur(Kurasiyo Wala Joda), Vill. Moh.Pur Raising Canera Bank And Constru
Tender
Indian
Uttar Pradesh
Budhana
15-09-2025

Tender Details

tender for Bp 2025-26 Verious Work Under Edd Budhana - Under Business Plan Work 2024-25 Incresing Capacity of Medium Distribution Transformer 100KVA to 250 KVA in Village Ukawali, Husanpur(Kurasiyo Wala Joda), Vill. Moh.pur Raising canera bank and Construction of New Dp for 63 KVA TF And strengthening LT Line of 250KVA Peimari School & Bhumiya wala In Vill Safipur Jato wala in Chandhari and 100KVA Tf ShriVinay, Sompal in Ukawaliin Area of EDD Budhana. Sl. No. Item Description 1 Safly Cartage of PCC Pole of 8.5 Mtr. With related centralised Material from central store to JE Store/ Work Site (Including Loading, Unloading in all Respect) 2 Safe cartage of63 KVA Transformer With related Instalation centralised Material from central store to JE Store/ Work Site (Including Loading, Unloading in all Respect) 3 Safe cartage of250 KVA Transformer With related Instalation centralised Material from central store to JE Store/ Work Site (Including Loading, Unloading in all Respect) 4 Safly Carage of ABC(3x95+1x70+1x16)/ (3x50+1x35+1x16) Conducterfrom central store to JE Store/ Work Site (Including Loading, Unloading in all Respect) 5 Safe cartage ofLT AB Cable(3x120+1x95+1x16) SQ MM 6 Safly Carage of Weasel Conducterfrom central store to JE Store/ Work Site (Including Loading, Unloading in all Respect) 7 Construction of Plinth in all respect According RESPO Norms of size 2x2x1.5 m (All required Decentralized material will be Provided by contractor for Construction of Plinth) 8 Installation of 250 KVAT/F on Plinth in all respect and energize after complete all work as RESPO Norms.(All required Decentralized material will be Provided by contractor) 9 According RESPO Norms laying LT AB Cable, mounting on Pole and Tying work Properly.(All required Decentralized material will be Provided by contractor) 10 Work of Spread Wiseal, mounting and tying the wire on the pole with installation of all necessary line Item properly as Reshpo Norms 11 Digging and Erection pole to make Dp with grauting, earthing and Complete work as per RESPO Norms Including all of accessories(Decentralized Item As Clamp,Nut bolt etc will be provide by Contractor) 12 Installation of 63 KVAT/F on DP in all respect and energize after complete all work as RESPO Norms.(All required Decentralized material will be Provided by contractor) 13 Digging and Erection pole with grauting, earthing and Complete work as per RESPO Norms Including all of accessories (Decentralized Item AsClamp,Nut bolt etc will be provide by Contractor) 14 Installation of 3 Phase Distribution Box (Decentralized Item will be provide by Contractor) 15 Chemical Earthing work as per requirment of Site & RESPO Norms Including all of accessories (All required Decentralized material will be Provided by contractor for Earthing) 16 According RESPO Norms Instalation Stay Set 17 According RESPO Norms Installation of danger board and barbed wire on pole(All required Decentralized material will be Provided by contractor) 18 According RESPO Norms Instalation 11 KV Fuse Set (All required Decentralized material will be Provided by contractor for Fuse Set) 19 According RESPO Norms Wire Mesh Fencing of Distributan T/F (All required Decentralized material will be Provided by contractor for Fancing) 20 According RESPO Norms for Safty of 250KVA T/F Instalation of 01 No. Tell Less Unit with Structure In LT Side of T/F.(All required Decentralized material will be Provided by contractor for Tell Less Unit) 21 Received Back old and used 100 KVA T/F from Site to Store (Including Loading, Unloading, Cartage and Dismantle in all respect) 22 Receive Back of Damaged Conducter 23 According RESPO Norms Earthing of Pole by MS earthing 24 According RESPO Norms Grouting of Stay 25 Material Provided By Contrector 26 ston Pad 27 Clamp With nut and Bolt 28 E Bracket 29 Nut & Bolt 30 Suspance Clamp with I Hook 31 GI barbard Wire 32 Dead End Clamp with I Hook 33 LT Piercing Connecter 95 Sq.MM 34 Number Plate With clamp, Nut Bolt 35 Damger Board

Key Value

Document Fees
INR 1180 /-
Tender Value
Refer document

Attachment

FileName File Description File Size
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail