}

Tender For Repair/ Spares/ Maintenance Of Ashok Leyland Guru I, Ii, Iii And Stallion New Of Snow Clearance Control Room Kulgam/Bathipora., kulgam-Jammu And Kashmir

Public Works Department has published Tender For Repair/ Spares/ Maintenance Of Ashok Leyland Guru I, Ii, Iii And Stallion New Of Snow Clearance Control Room Kulgam/Bathipora.. Submission Date for this Tender is 04-09-2025. Vehicle Maintenance Service Tenders in kulgam Jammu And Kashmir. Bidders can get complete Tender details and download the document.




Tender Notice

50911218
Tender For Repair/ Spares/ Maintenance Of Ashok Leyland Guru I, Ii, Iii And Stallion New Of Snow Clearance Control Room Kulgam/Bathipora.
Tender
Indian
Jammu And Kashmir
Kulgam
04-09-2025

Tender Details

Repair/ Spares/ Maintenance Of Ashok Leyland Guru I, Ii, Iii And Stallion New Of Snow Clearance Control Room Kulgam/Bathipora.=2 Fabrication of new cutting edges for Snow Service Blade Assembly out of MS Flats as per sample, which will be supplied by the Department. The fabrication involves of cutting the flats by using oxy- acetylene gas to the matching length of four pieces of the existing fitted cutting edges of the blade and drilling of 24 holes of size 16-18 mm at required locations. The job also includes supply of new set of M14 bolts with nuts and washers of standard grade. the job also includes cost of transportation, loading and unloading etc of cutting edges from divisional office to SCCR Kulgam/Bathipora All tools and tackles during execution of work are to be provided by firm. 3 Repairs to the variable plough assembly. The job includes dismounting of the plough from the machine and removing of bends by heating, pressing, hammering and welding at damaged/ cracked spots. 4 Four wheel checking and hub greasing by way of:1. Removing of tyres, wheel hub, brake drum, bearings both inner and outer, axle and all realted parts of the hub assembly. Washing and cleaning of all the parts using HSD(cost on a/c of HSD is mentioned seprately).2. Checking bearings, brake shoes and all realted parts.3.Providing and fitting of new oil seals.4. Greasing of bearing and hub while repacking and adjust hub end play (required quantity of grease will be provided by the department).5. Reassembling of the hub and refitting of tyres. 5 Greasing on critical componentswhich include: steering, linkages including sway bar links, ball joints, tie rods ends, control arm bushings and pitman arm, Suspension parts including spring shackles and pins, propellor shaft splines and crosses in U Joints. The job includes greasing on various points of Blade Assmebly. (The required amount of the grease will be provided by the Department). The tools including grease gun involved in the execution of the job are to be provided by the firm. 6 HSD for washing of parts 7 Dhoti Cloth 8 Electric Job :The job includes identifying and replacing faulty fuses, ensuring strict adherence to machine specifications. Providing and fitting of the front-side fog lights (2 No. each) by replacing damaged ones with new fog lights for improved visibility under Snowy conditions (12V/24V with ip64 protection). Additionallyreplacing damaged wiring with new segments of the correct size for each machine. 9 Providing and Fitting of Siren horn hooter. 10 P/F of of Filter kit -(M-oil filter-01 No.,fuel water seperator-01 No., fuel filter-01 No., air filter-01 NO.) as per sample and as recomended by OEM. 11 Supply of wiper blade with arm 12 GURU-II 13 Fabrication of new cutting edges for Snow Service Blade Assembly out of MS Flatsas per sample, which will be supplied by the Department. The fabrication involves of cutting the flats by using oxy- acetylene gas to the matching length of four pieces of the existing fitted cutting edges of the blade and drilling of 24 holes of size 16-18 mm at required locations. The job also includes supply of new set of M14 bolts with nuts and washers of standard grade. the job also includes cost of transportation, loading and unloading etc of cutting edges from divisional office to SCCR Kulgam/Bathipora All tools and tackles during execution of work are to be provided by firm. 14 Repairs to the variable plough assembly. The job includs dismounting of the plough from the machine and removing of bends by heating, pressing, hammering and welding at damaged/ cracked spots. 15 Four wheel checking and hub greasingby way of:1. Removing of tyres, wheel hub, brake drum, bearings both inner and outer, axle and all realted parts of the hub assembly. Washing and cleaning of all the parts using HSD(cost on a/c of HSD is mentioned seprately).2. Checking bearings, brake shoes and all realted parts.3.Providing and fitting of new oil seals.4. Greasing of bearing and hub while repacking and adjust hub end play (required quantity of grease will be provided by the department).5. Reassembling of the hub and refitting of tyres. 16 Greasing on critical components which include:steering linkages including sway bar links, ball joints, tie rods ends, control arm bushings and pitman arm, Suspension parts including spring shackles and pins, propellor shaft splines and crosses in U Joints. The job includes greasing on various points of Blade Assmebly. (The required amount of the grease will be provided by the Department). The tools including grease gun involved in the execution of the job are to be provided by the firm. 17 HSD for washing of parts 18 Dhoti Cloth 19 Electric Job:The job includes identifying and replacing faulty fuses, ensuring strict adherence to machine specifications. Providing and fitting of the front-side fog lights (2 No. each) by replacing damaged ones with new fog lights for improved visibility under Snowy conditions (12V/24V with ip64 protection). Additionallyreplacing damaged wiring with new segments of the correct size for each machine. 20 Providing and Fitting of Siren horn hooter. 21 P/F of of Filter kit- (M-oil filter-01 No.,fuel water seperator-01 No., fuel filter-01 No., air filter-01 NO.) as per sample and as recomended by OEM. 22 P/F of wiper blade with arm 23 GURU-III 24 Fabrication of new cutting edges for Snow Service Blade Assembly out of MS Flats as per sample, which will be supplied by the Department. The fabrication involves of cutting the flats by using oxy- acetylene gas to the matching length of four pieces of the existing fitted cutting edges of the blade and drilling of 24 holes of size 16-18 mm at required locations. The job also includes supply of new set of M14 bolts with nuts and washers of standard grade. the job also includes cost of transportation, loading and unloading etc of cutting edges from divisional office to SCCR Kulgam/Bathipora All tools and tackles during execution of work are to be provided by firm. 25 Repairs to the variable plough assembly. The job includs dismounting of the plough from the machine and removing of bends by heating, pressing, hammering and welding at damaged/ cracked spots. 26 Four wheel checking and hub greasing by way of:1. Removing of tyres, wheel hub, brake drum, bearings both inner and outer, axle and all realted parts of the hub assembly. Washing and cleaning of all the parts using HSD(cost on a/c of HSD is mentioned seperately).2. Checking bearings, brake shoes and all realted parts.3.Providing and fitting of new oil seals.4. Greasing of bearing and hub while repacking and adjust hub end play (required quantity of grease will be provided by the department).5. Reassembling of the hub and refitting of tyres. 27 Greasing on critical components which include:steering linkages including sway bar links, ball joints, tie rods ends, control arm bushings and pitman arm, Suspension parts including spring shackles and pins, propellor shaft splines and crosses in U Joints. The job includes greasing on various points of Blade Assmebly. (The required amount of the grease will be provided by the Department). The tools including grease gun involved in the execution of the job are to be provided by the firm. 28 HSD for washing of parts 29 Dhoti Cloth 30 Electric Job:-The job includes identifying and replacing faulty fuses, ensuring strict adherence to machine specifications. Providing and fitting of the front-side fog lights (2 No. each) by replacing damaged ones with new fog lights for improved visibility under Snowy conditions (12V/24V with ip64 protection). Additionallyreplacing damaged wiring with new segments of the correct size for each machine. 31 Providing and Fitting of Siren horn hooter for Guru-III 32 P/F of of Filter kit-(M-oil filter-01 No.,fuel water seperator-01 No., fuel filter-01 No., air filter-01 NO.) as per sample and as recomended by OEM. 33 Supply of wiper blade with arm 34 ASHOK LEYLAND STALLION NEW 35 Fabrication of new cutting edges for Snow Service Blade Assembly out of MS Flats as per sample, which will be supplied by the Department. The fabrication involves of cutting the flats by using oxy- acetylene gas to the matching length of four pieces of the existing fitted cutting edges of the blade and drilling of 24 holes of size 16-18 mm at required locations. The job also includes supply of new set of M14 bolts with nuts and washers of standard grade. the job also includes cost of transportation, loading and unloading etc of cutting edges from divisional office to SCCR Kulgam/Bathipora All tools and tackles during execution of work are to be provided by firm. 36 Repairs to the variable plough assembly. The job includs dismounting of the plough from the machine and removing of bends by heating, pressing, hammering and welding at damaged/ cracked spots. 37 Four wheel checking and hub greasing by way of:1. Removing of tyres, wheel hub, brake drum, bearings both inner and outer, axle and all realted parts of the hub assembly. Washing and cleaning of all the parts using HSD(cost on a/c of HSD is mentioned seprately).2. Checking bearings, brake shoes and all realted parts.3.Providing and fitting of new oil seals.4. Greasing of bearing and hub while repacking and adjust hub end play (required quantity of grease will be provided by the department).5. Reassembling of the hub and refitting of tyres. 38 Greasing on critical components which include: steering linkages including sway bar links, ball joints, tie rods ends, control arm bushings and pitman arm, Suspension parts including spring shackles and pins, propellor shaft splines and crosses in U Joints. The job includes greasing on various points of Blade Assmebly. (The required amount of the grease will be provided by the Department). The tools including grease gun involved in the execution of the job are to be provided by the firm. 39 HSD for washing of parts 40 Dhoti Cloth 41 Providing and Fitting of filter kit (M. Oil Filter and fuel filter kit)and air filter as per sample and as recommended by OEM. 42 Electric Job:The job includes identifying and replacing faulty fuses, ensuring strict adherence to machine specifications. Providing and fitting of the front-side fog lights (2 No. each) by replacing damaged ones with new fog lights for improved visibility under Snowy conditions (12V/24V with ip64 protection). Additionallyreplacing damaged wiring with new segments of the correct size for each machine. 43 Providing and Fitting of Siren horn hooter 44 P/F of wiper blade with arm

Key Value

Document Fees
INR 200 /-
Tender Value
INR 1.27 Lakhs /-

Attachment

FileName File Description File Size
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail