|
| 1 | Providing and Replacement of Gun metal bush of ceiling/exhaust/cooler fan/ as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. |
| 2 | P & F 3 Speed rotary switch for Desert Cooler complete with testing etc as required. |
| 3 | Servicing and overhauling of 20\" sweep desert cooler including oiling, greasing, painting of tank from inside with rubber paint after properly desmantling each assembly and refixing the same as required. |
| 4 | Paintingof desert cooler with two coats of rubber paint inside of water tank and two coat of synthetic enamelled paint on both side of cooler body, fan body, grills etc.after cleaning with sand paper, complete in all respect as required. |
| 5 | Replacement of cooler pads (heavy) setof3 no. of size 25\" x 27\" |
| 6 | P & F aluminiun blade for 20\"\" desert cooler fanas required. |
| 7 | Labour Chargesfor fixing of desert cooler in windows including handling of cooler upto desired location, making electrical/water connections, testing etc. as required.Second floor |
| 8 | P & F of submerciblepump setsuitable for 18/24 \"Desert coolers. |
| 9 | P & F of submerciblepump setsuitable for 36 \"Desert coolers. |
| 10 | P & Ffan motor suitable for 20\" desert coolerincluding making connection testing etc. as required.with Aluminiumwinding Motor ISI Marked |
| 11 | Supplying and charging of fresh refrigerant and testing of performance of air conditioner/ fridge/ water cooler of following capacity including capillary and strainer/ filter. 1.5 TR Window/ Split A.C. |
| 12 | …do… 2.0 TR Window/ Split A.C. |
| 13 | …do… 25/50 / 40/80 Ltr. Water cooler |
| 14 | Replacement of defective compressor by company repaired compressor as per OEM recommendationsof following gadgets including testing etc. as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. 1.5 TR A.C. |
| 15 | ….do ….. 2.0 TR A.C. |
| 16 | …do…. 25/50 / 40/80 Ltr. Water cooler |
| 17 | Servicing of 1.0/1.5/2.0 TR capacity Split/ Window type air conditioner |
| 18 | P & Replacement of overload protection of A.C./ Water cooler as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. |
| 19 | P & Replacement of thermostat of A.C./ Water cooler/fridge as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. |
| 20 | P & Replacement of starting relay ofA.C/water cooler/fridge compressor as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. |
| 21 | P & Replacement of fan motor of evaporator/ condensor complete as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. |
| 22 | S & F of capacitor of 230V/ 275V, 50Hz rating of plastic casing and terminals -Lugs or copper wire. 120-150 micro farad |
| 23 | …do… Running capacitor, 25.0 micro farad |
| 24 | Providing & Fixing of IS : 4985 - 2000 Class -4 (10 Kgf / Sqcm) UPVC drain water piping withfittings (IS:7834 & 10Kgf/sqcm) like elbow, socket, Tee, solvent cement jointing,support with MS hanger on ceiling or recessed in wallwith chasing & plastering with 6 mmthickclosedcellelastomeric nitrile rubberinsulation including leakage testing etc. as required of following Nominal sizes. All as per pre approved by Engineer in charge.For additional technical parameters of products/ work, refer Annexure \"A\" attached with this BSR . 25 mm |
| 25 | Making hole in stone masonary/ RCC wall/ RCC slab with core cutter for accomodating refrigerant pipe/ drain pipe/ MS pipe/ cables etc of following dia , 50 mm dia per running inch length |
| 26 | Supply & fixing MS powder coated stand suitable for 1.0/1.5/ 2.0 Tr outdoor type of Split AC.All as per pre approved by Engineer in charge.For additional technical parameters of products/ work, refer Annexure \"A\" attached with this BSR . |
| 27 | Supply, installation, testing and comissioning ofinterconnectingcopperrefrigerant pipingof DHE Grade C12200- ASTM B68, B75, chemical composition of copper %- 99.0 Min and Phosphorus %- 0.015 to 0.040 . For Annealed copper tube :- Tensile strength = 210 Mpa wih elongation % = 40 Min . Ink MarkBrand Printing on Hard Tubes should be present. duly insulated with tubular elastomeric nitrile rubber FM/UL approved with high water vapor diffusion resistance and low thermal conductivity should be certified \"Class O\" in Fire Propagationas per BS 476 Part 6 including chase cutting andfilling with mortar, Slotted channel supports mounted on 10 mm threaded rod at suitable spacing the exposed piping shall be wrapped with glass woven cloth and lag coating for vapour barrier and weather protection. Joints shall be covered with nitrile rubber tape of 3 mm thick complete as required of following sizes. All as per pre approved by Engineer in charge.For additional technical parameters of products/ work, refer Annexure \"A\" attached with this BSR, 12.7 mm O.D., wall thinkness ≥ 0.8mm (insulation – 13 mm thick) |
| 28 | …do… 9.5 mm O.D., wall thinkness ≥ 0.8mm (insulation – 13 mm thick) |
| 29 | Dismentling of splitair conditioner of any capacity/any type including existing indoor unit & outdoor unit , refrigerant piping , connecting cables , drain pipe etc. including shifting of dismentaled material to store completeas required |
| 30 | Rewinding of ceiling fan motor (starting and running winding) including all necessary material. The motor is to be wound taking no. of coils, turns and pitch as it was originally wound with required size super enamelled wire with \"E\" class insulation material and making connections etc. as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. (New model ceiling fan), 900/1200 mm sweep (New model ceiling fan) |
| 31 | Providing and Replacement ofball bearing of ceiling/ exhaust fanand refixing the same at suitable location as requiredand as per OEM recommendations. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. |
| 32 | P & Replacement of cover/ bearing seat of ceiling/ exhaust fan. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. |
| 33 | P & F Aluminium Blades (a set of 3 blades) duly painted and well finished 900/ 1200 mm. The material of the fan blade shall be of designation 31500B with condition HX6 aluminium alloy sheet confirming to IS 737/2008 |
| 34 | Rewinding of Heavy duty Exhaust fan motor including all necessary material,The motor is to be wound taking no. of coils,turns and pitch as it was originally wound with required size super enamelled wire with \"E\" class insulation material and making connections etc. as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. 300/ 380 mm sweep |
| 35 | Rewinding of single phase motor of 1400 RPM including all necessary material and of the same characteristics as original with required size of super enamelled wire \"E\" class insulation material and testing etc. as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. 0.25 H.P.To 0.50 H.P. |
| 36 | Labour charges for installation of submersible motor pump set including lowering/ delowering of pipes, cables, accessories etc. in tube-well/ open well complete including T&P, transportation of tripod, chain pulley block & any other material required for this purpose complete in all respect.Lowering only |
| 37 | …do…Delowering only |
| 38 | …do…Delowering and Lowering |
| 39 | Providing & Laying of Polypropylene rope Confirming to IS:5175 for submersible pump of following sizes. complete in all respect. All as per pre approved by Engineer in charge.For additional technical parameters of products/ work, refer Annexure \"A\" attached with this BSR. 12mm (suitable up to 50 mm OD pipe) |
| 40 | …do…. 16mm (suitable above 50mm & up to 75mm OD pipe) |
| 41 | Providing & Fixing of HDPE pipe Confirming to IS:4984:2021for water supply suitable for submersible & jet pump with required fittings ie socket, elbows, tee etc. complete in all respect. All as per pre approved by Engineer in charge.For additional technical parameters of products/ work, refer Annexure \"A\" attached with this BSR . for vertical installation,50 mm OD6 kg / cm2 |
| 42 | …do…. 63 mm OD6 kg / cm2 |
| 43 | SITC of Single Stage, water cooled, High Speed (2880 RPM), Horizontal, Centrifugal, Openwell Submersible pumps set pre filled with coolent water and fitted with mechanical seal - T/C Vs T/C, Thrust bearing shall be ofcarbon + S.S.The stator body of single phase pumpshall be of SS and rest of all shall be of cast iron. All casting parts should be cathod electro deposition (CED) coated and other construction material should be confirming to IS : 14220: 2018 . The overall performance of pump shall confirm to BEE energy efficiency level of 3 star. Valid BEE certificate from OEM must be submitted for the same. Motor should be IE2 class as per IEC 60034-2-1: 2007, IEC 60034-30: 2008,& IS12615:2011, including making connection etc as required complete in all respect. OEM shall have submitNABL / CPRI / ERDA accrediatedlab type test certificate before execution. All as per pre approved by Engineer in charge.For additional technical parameters of products/ work, refer Annexure \"A\" attached with this BSR, 0.5 HP, 1-Ø, (7 -15) Mtr, (130 - 72) LPM |
| 44 | ….do….. 5.0 HP, 3-Ø, (14 -28) Mtr, (995-500) LPM |
| 45 | Rewinding of single phase/3phase submersible motor including all necessary material and of the same characteristics as original with required size of super enamelled wire \"E\" class insulation material and testing etc. as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor, 0.5 H.P.To 1.0 H.P. |
| 46 | …do…Above 3.0 HP to 5.0 HP |
| 47 | …do….From7. 5 HP to 10.0 HP |
| 48 | Repairing of submersible pump of withreplacement of broken impellers ,diffuser,bush/bearing set , oil seal complete with testing etc. as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor,2.0 H.P.to 3.0 HP |
| 49 | …do… From7. 5 HP to 10.0 HP |
| 50 | Rewinding of three phase squirrel cage induction motor of 1400 to 2800 RPM including all necessary material and of the same characteristics as original with required size of super enamelled wire \"E\" class insulation material and testing etc. as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor, 3.0 H.P. |
| 51 | …do… 7.5 H.P. |