| 1 | Cartage of following material from store center Meerut to Site of work including loading & unloading at both ends maximum distance up to 40 Km. :-(as per direction of Supervising Engineer). |
| 2 | Control panel |
| 3 | 11 kv VCB 200/100\5amp |
| 4 | 33 KV VCB 1250 amp |
| 5 | Cartage of battery set with charger 24 volts |
| 6 | cartage of 11 KVCT 200/100/1 |
| 7 | Cartage of 11 KVPT |
| 8 | Cartage of LA |
| 9 | 33 KV TPMO/ISOLATOR(as per UPPCL Respo). |
| 10 | Fixing of 33 KV TPMO/ISOLATOR(as per UPPCL Respo). |
| 11 | Erection andfixing ofControl panel with All accessories and fabrication. |
| 12 | Erection of fixing 33 KV & 11 KV VCB with All accessories and fabrication. (as per direction of Supervising Engineer). |
| 13 | Providing and Laying of diffirent size of ( 2x2.5 ) m.m square control cable i.e from buchhole realy to Marshalling box to switch gear room , 33 KV CTs Junction box, CT 33 KV .33 KV PT , VCB Control panel junction box to 33 KV VCB control panel from T/F etc.in the cable trench including making proper connection at Buchholz realy , Marshalling box as per requeired for installed equipment . (as per direction of Supervising Engineer). |
| 14 | Providing and Laying of diffirent size of (4x2.5 ) m.m square control cable i.e from buchhole realy to Marshalling box to switch gear room , 33 KV CTs Junction box, CT 33 KV .33 KV PT , VCB Control panel junction box to 33 KV VCB control panel from T/F etc.in the cable trench including making proper connection at Buchholz realy , Marshalling box as per requeired for installed equipment .(as per direction of Supervising Engineer). |
| 15 | Fixing of 11KVCT(as per UPPCL Respo). |
| 16 | Fixing of 11 KVPT (as per UPPCL Respo). |
| 17 | Fixingof Lightening Aresstor (as per UPPCL Respo). |
| 18 | Fixingof battery set with charger 24 volts (as per UPPCL Respo). |
| 19 | Fixing of 33 KV TPMO/ISOLATOR(as per UPPCL Respo). |
| 20 | Providing and Fixing WTI/OTI (as per UPPCL Respo). |
| 21 | Replacement of damaged digital volt meter/ Ameter |
| 22 | Earthing of PCC pole with MS earth rod of 2.5 mtr. Long including excavation of pit & driging of MS rod up to proper depth & connection the earth electrode with the help of GI wire. (25KVA, 63 KVA, 100 KVA) (as per UPPCL Respo). |
| 23 | Providing & fixing chemical earthing(as per UPPCL Respo). |
| 24 | Providing and fixing water lavel earthing. (as per UPPCL Respo). |