| 1 | Dismantling reinforcement cement concrete or reinforcement brick work, including stacking of materials as directed by Engineer-in-charge with in a distance of 60 mt. (200 feet) Si no 694 |
| 2 | RCC work with cement approved coarse sand, and 2cm (3/4\") gauge, approved stone ballast in the proportion 1:1.5:3 in Plinth Beam/Slab beam excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.I. binding wire, an including necessary cantering and shuttering etc and also including supply of all materials, labour and tools and plants etc. required for proper completion of the work binding wire to be supplied by the contractor free of cost. s.i no- 286-1st |
| 3 | Mild steel or iron work in plain work such as reinforced concrete/brick work (when not included in over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel, its wastage and hooks, and authorized over lapping shall be measured.SI. No. 504 |
| 4 | First class brick work in 1:6 cement and fine sand of 1.25 FM. mortar in foundation and plinth including supply of all materials, labour and T & P etc. required for proper completion of the work. |
| 5 | Cast cement concrete door sills, chaukhats boundry posts, shelves and similar small work with cement, approved coarse sand and 2 cm. (3/4\") gauge approved stone ballast in the proportion of 1 : 2 :4 , excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.G.I. binding wire, and including the cost of binding wire, moulds and all other materials, labour and T&P etc required for proper completion of the work. |
| 6 | Earth work in cutting or in Filling in ordinary soil, excavation to be in the form of regular pits not exceeding 1/2 metre (20\") in depth and earthwork in embankment to be in 20 cm(8\") layers, including ramming & dressing the surface to required levels and slopes and also including 1.5 metre (5fts) lifts and 30 m. (100\") lead. The earth from cutting to be used in making filling or to be deposited as spoil banks within 30 metres (100 fts) distance as directed by Engineer-in-charge. (Rate is Including Royality) |
| 7 | 15 mm thick plaster on rough side brick work minimum thickness not less than 10 mm with cement mortar in proportion of 1:6 cement and fine sand of 1.25 fineness modulus including supply of all materials, labour and tools and plants etc required for proper completion of the work.SI No.17.59(III) |
| 8 | Engraving lines in the plaster of outer face wall vertically and horizontally to Display the surface as stone Facing as including supply of all materials, labour and tools and plants etc required for proper completion of the work.SI No.598 |
| 9 | Painting or Varnishing on iron works in small areas or new wood work with one coat of ready mixed priming paint & one coat of approved superior quality ready mixed paint of clear synthetic varnish including supply of all materials, labour and T&P etc. required for proper completion of the work. Paint to be used should confirm to the I.S.I.No. 103 1950 Si no-641 & 642 |
| 10 | Provide and cutting 20mm dia hole 300mm depth for fixing of 16mm dia steel in beam with labour T&P etc complete all work as per direction of engineer-in-charge. |
| 11 | Supply & Fixing Electro pole Lighting pole or post and Hardware Tubular Street Light Poles With Complete Electrification Work With Fitting etc, |
| 12 | U-Type Drain Complete Analysis Atteched. |