| 1 | SH:- Jungle clearance |
| 2 | Clearing and Grubbing Road Land .(Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.)a) In area of thorny jungle |
| 3 | SH:- Earth work in embankment |
| 4 | Construction of Embankmentwith Material obtained from Borrowpits (Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2). |
| 5 | SH:- Preparation of sub-grade |
| 6 | Clearing and Grubbing Road Land .(Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.)a) In area of thorny jungle |
| 7 | Consolidation of sub-grade with road roller of 8 to 12 tonne capacity including making good the undulations etc. with earth or quarry spoils etc. and rerolling the sub grade. |
| 8 | SH:- Granular Sub-base |
| 9 | Granular Sub-Base with Coarse Graded Material (Table:- 400- 2)Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 (Grading- I) |
| 10 | SH:- WBM-II |
| 11 | Water Bound Macadam (Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density.) A) By Manual MeansGrading- II (Using Screening Type-A (13.2mm Agg.) |
| 12 | SH:- RCC S/Culvert 2.00 Mtr span - 13 Nos, 4.00 Mtr span - 9 Nos, 6.00 Mtr span - 7 Nos. |
| 13 | Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.) Ordinary soil (Mannual means (Depth upto 3m) |
| 14 | PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.) |
| 15 | Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. (PCC Grade M15 ) |
| 16 | Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications |
| 17 | Furnishing and Placing Reinforced/ Prestressed cement concrete in super-structure as per drawing and Technical Specification A) RCC Grade M20. Case-I Using Concrete Mixer. For solid slab super-structure, Height upto 5m |
| 18 | Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications. |
| 19 | Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification. A) Granular material. |