Tender For Maintenance Of Completed Scheme Narela Zone. Sub Head:-Supplying Of Drinking Water (Potable) Through Tankers Of Capacity 10,000 Litres From Djb Source In Lig/Ews Flats In Pocket- Iii, Iv, V & Vi, Sector G-2/G-6, Narela, Narela-Delhi
TDR : 50893296
Tender Notice
BOQ
Expired
Narela
Delhi
Tender For Maintenance Of Completed Scheme Narela Zone. Sub Head:-Supplying Of Drinking Water (Potable) Through Tankers Of Capacity 10,000 Litres From Djb Source In Lig/Ews Flats In Pocket- Iii, Iv, V & Vi, Sector G-2/G-6, Narela
Name of Work:-Maintenance of completed scheme Narela Zone. Sub head:-Supplying of drinking water (potable) through tankers of capacity 10,000 litres from DJB source in LIG/EWS flats in Pocket- III, IV, V & VI, Sector G-2/G-6, Narela
Sl. No.
Item Description
1
Supply of drinking (potable) water through water tankers of capacity 10,000 litres from DJB source including driver, helper, lubricants, fuels and delivery/distribution water (potable) all complete as per direction of Engineer-in-charge.
2
Conditions:1 The royalty will be paid by the agency to Delhi Jal Board as per the prevalent rates of DJB and is already included in the rates.2 The DJB water source shall be DJB-UGR in HolambiKalan, Delhi.3 GPS tracker to be installed on tankers, payment shall be linked to logs of GPS data for payment purpose.4 Verification of daily tankers by DJB.NOTE-: Condition for L1 Bidder – Availability and Exclusive Deployment of Water Tankers:- The L1 bidder shall be required to submit a Memorandum of Understanding (MoU) or ownership documents confirming the availability of at least four water tankers, each having a minimum capacity of 10,000 litres, and compliant with BS-VI emission norms or operating on CNG. Furthermore, the bidder must certify that the said tankers are not deployed elsewhere at the time of MoU submission and shall remain exclusively available for this work throughout the contract period—from the start date until completion of the work to ensure the timely and proper supply of drinking water as per the contract requirements. Failure to submit the requisite MoU or ownership documents, or non-compliance with the exclusivity condition, within 7 days of issuance of the Letter for commencement of work may result in forfeiture of the Performance Guarantee and additional performance guarantee (if any) and will render L1 Bidder ineligible to participate in bid in re-tendering of said work.
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.