| 1 | Supply of Materials |
| 2 | Cross arm holding clamp with Nut & bolt suitable for PCC/ST Pole with Nut & Bolt |
| 3 | Stone pad 300*300*75 |
| 4 | PG Clamp PCC/ST Pole with Nut & Bolt |
| 5 | MS Nut Bolt 250mmX16mm dia. |
| 6 | Piercing Clamp for LT |
| 7 | I Hook |
| 8 | Suspenstion Clamp |
| 9 | Errection Work |
| 10 | Safe Loading, carriage from Store Center Chilbila Pratapgarh to work site (Distance 10-70 K.M.) and unloading, errection of 8.5 meter PCC Pole Single pole with complete fitting as per respo norms. (This work includes grouting and earthing of pole) |
| 11 | Safe Loading, carriage from Store Center Chilbila Pratapgarh to work site (Distance 10-70 K.M.) and unloading, errection of 8.5 meter PCC Double Pole with complete fitting as per respo norms. (This work includes grouting and earthing of pole) |
| 12 | Safe Loading, carriage from Store Center Chilbila Pratapgarh to work site (Distance 10-70 K.M.) and unloading, errection of 9 meter single pole PCC Pole with complete fitting as per respo norms. (This work includes grouting and earthing of pole) |
| 13 | Safe Loading, carriage from Store Center Chilbila Pratapgarh to work site (Distance 10-70 K.M.) and unloading, errection of 9 meter PCC Double Pole with complete fitting as per respo norms.(This work includes grouting and earthing of pole) |
| 14 | Safe Loading, carriage from Store Center Chilbila Pratapgarh to work site (Distance 10-70 K.M.) and unloading, errection of 11 meter single PCC Pole with complete fitting as per respo norms. (This work includes grouting and earthing of pole) |
| 15 | Safe Loading, carriage from Store Center Chilbila Pratapgarh to work site (Distance 10-70 K.M.) and unloading, errection of 11 meter ST Single pole with complete fitting as per respo norms. (This work includes grouting and earthing of pole) |
| 16 | Safe Loading, unloading and carriage from store to work site of other line Matching Materials and Accessories |
| 17 | Safe Loading, carriage from Store Center Chilbila Pratapgarh to work site (Distance 10-70 K.M.) and unloading, errection of 11 meter STPDouble Pole with complete fitting as per respo norms. (This work includes grouting and earthing of pole) |
| 18 | Safe Loading, carriage from Store Center Chilbila Pratapgarh to Different work site (Distance 30-70 K.M.) of ACSR weasel conductor and other line Materials. |
| 19 | Safe Loading, carriage from Store Center Chilbila Pratapgarh to Different work site (Distance 30-70 K.M.) of ACSR Rabit conductor and other line Materials. |
| 20 | Stringing and Sagging of three phase 11 KV Line on 8.5 meter PCC Pole with ACSR Raibit conductor and binding with insulator. |
| 21 | Stringing and Sagging of three phase 11 KV Line on 8.5 meter PCC Pole with ACSR weasel conductor and binding with insulator. |
| 22 | Safe Loading, carriage from Store Center Chilbila Pratapgarh to Different work site and laying (Distance 30-70 K.M.) of 11 KV XLPE Cable 3*185 sqmm. |
| 23 | Safe Loading, carriage from Store Center Chilbila Pratapgarh to Different work site and laying (Distance 30-70 K.M.) of L T CABLE3(3X50+1X35+1X16) sqmm. |
| 24 | Safe Loading, carriage from Store Center Chilbila Pratapgarh to Different work site and installation work (Distance 30-70 K.M.) of 3 Phase distrubution box |
| 25 | Cutting of tree branches of the construction of 11 KV and LT lines. |
| 26 | Safe carriage of following capacity Transformers from store centre chilbila Pratapgarh to work site and mounting at double pole with energization as per respo norms. (0-70 K.M.) |
| 27 | 25 KVA |
| 28 | Complete stay grouting and nozzaling as per respo norms. (All material providing of contractor) |