| 1 | Water Proofing Treatment to RCC roofs comprising of : - |
| 2 | Taking down existing water proofingtreatment (any no. of layers) from RCC roofs includingcleaning the surface including flashings and junction of parapet etc. with wire brushing & water to the entire satisfaction of EIC, complete all as specified. |
| 3 | PCC (1:2:4) type B-0 using 12.5 mm graded stone aggregate, laid to slope as directed by Engineer in Charge over RCC roofs as padding, complete all as specified. |
| 4 | Rendering15 mm thick (Average thickness) rendering on roof surface including flashings and junction of parapets etc., finished even and fairin cement mortar (1:4), using water proofing compound as recommended by manufacturers after brushing cement slurry @ 1.20 kg/Sq. m, complete all as specified. NOTE: Supply only WPC will be measured & paid for separately under respective item of BoQ. |
| 5 | APP based polymeric membrane laid on primed roofs & flashing by forced application using Butane torch and sealing all joints on primed surface by applying hot blown industrial grade bitumen @ 85/25 @ 1.20 kg/Sq.m over a coat of bitumenous primer @ 0.40 litre per square metre over clean RCC/plastered roof surfaces & flashings complete, all as specified. |
| 6 | 40 mm thick brick tiles are bedded over 15 mm thick cement mortar (1:6),and joints grouted flush in cement mortar (1:3) mixed with 5% of crude oil by weight of cement on APP membrane complete all as specified. |
| 7 | Heat resistant terrace tiles (300mm x 300mm x 20mm), ISI MARKED, with SRI (solar refractive index) >78, solar reflection >0.70 and initial emittance>0.75 on waterproof & sloped surface of terrace, laid on 20mm thick cement sand mortar (1:4) and grouting the joints with mix of white cement & marble powder in ratio (1:1) including rubbing and polishing of the surface upto 3 cuts including providing skirting uoto 150mm height along the parapet walls in the same manner complete all as specified. |
| 8 | Making benching with PCC (1:2:4) type B-0 (using water proofing compound) along side walls adjoining to roofs, in CONCAVE SHAPE,complete all as specified. NOTE: WPC will be measured and paid for separately under respective item of BoQ. |
| 9 | NOTE : For Guarantee of Water Proofing Treatmentrefer PS clause 11.5. |
| 10 | Supply only liquid water proofing compound, ISI marked, complete all as specified. |
| 11 | Brick work using bricks as specified in PS clause 5.1, straight or curved on plan exceeding 6.00 metre mean radius built in cement mortar (1:6), complete all as specified. |
| 12 | Rendering 15 mm thickon fair faces of brick work or concrete surfaces, finished even and fair on walls in cement mortar (1:4), mixed with water proofing compound as per manufacturers instructions, complete all as specified. |
| 13 | Complete removal of existing treatment of any description, including prepration of wall surfaces of any description and applying two coats of exterior acrylic emulson over and including a coat of water based exterior primer complete all as specified. |
| 14 | Prepration of new plasterd wall surfaces of any descriptionand applying the two coats of exterior acrylic emulson over and including a coat of water based exterior primer complete all as specified. |
| 15 | PVC pipes, 110 mm external dia pipe, type-A, ISI marked (IS:13592) single socketed in any length with or without rubber ring joints, fixed to wall with PVC brackets & clamp as SWR / rain water pipes, IN REPLACEMENT, complete all as specified. |
| 16 | uPVC/PVC bends any radius, complete all as specified. suitable for PVC soil waste discharge pipes 110 mm external dia. |
| 17 | Steel tubes 20mm bore‘medium grade’, galvanized with all fittings and fixed to walls and ceilings or laid in floors, including taking up or down steel tubing and connections from existing location, complete all as specified. |
| 18 | 500 litre capacity, white/ black, three layered polyethylene water storage tanks (cylindrical vertical with closed top) including hoisted and fixed in position, making connections, IN REPLACEMENT, complete all as specified including the following acessories: -(i) Brass ball valves, high pressure, with GI rod & high density plastic ball complete screwed for iron pipe or brass ferrule and fixed, suitable for 20 mm bore GI pipe, IN REPLACEMENT, complete all as specified.(iii) Gun-metal stop valve (quarter turn type) with MS lever handle, suitable for GI tubes 20 mm bore, ISI marked, screwed both ends for iron pipe, IN REPLACEMENT , complete all as specified.(iv) Provn of 20 mm bore GI light grade tube from O/H tank to nearest mouth of RWP. |
| 19 | Taking down cement plaster of any description on brick walls or concrete surfaces etcincluding raking out joints, hacking for key, scrubbing down with water etc complete all as specified. |
| 20 | Demolition brickwork masonrybuilt in cement mortar including all quoins, arches, pillars etc complete all as specified. |
| 21 | Demolition of mud phuska in roofs, any thickness including plaster and leeping plaster all as specified. |
| 22 | Dismantlig brick tiles in roof laid dry and pointed in cement mortar all as specified. |
| 23 | Demolition of cement concrete (unreinforced)of any description and in any position not otherwise specifically provided all as specified. |
| 24 | Demolition of reinforced cement concrete (RCC water tank)of any description and in any position not otherwise specifically provided all as specified. |
| 25 | Notes:Amount ofcredit for retrieved materials is mentionedintender documents in pdf form which will be deducted while acceptance of tender offline. |