| 1 | ProvidingandlayingTackCoatoverExistingBTsurfaceusing2KgofBitumen Emulsion(RS1)per10sqmforpreparatorytoanotherbituminousconstruction overitincludingcostofmaterial,labourcharges,rentalsformachinery,fueland all other incidental charges etc., complete as perClause 503 of MORTH Rev-5 |
| 2 | Road A |
| 3 | Road B |
| 4 | Providing,laying 50mmconsolidatedthickBituminousMacadamusing 0.20cumof26.50- 13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37 Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5 Grade-II |
| 5 | Road A |
| 6 | ProvidingandLaying50mmthickBituminousMacadamusingcourseaggregateandVG30 bitumenwhichshallconsistofconstructioninasinglecoursebase/bindercourseconfirming tothespecficationonapreviouslypreparedbase,(usingMiniHotMixPlantandPower Roller)includingcostofmaterial,labourcharges,rentalsformachinery,fuelandallother incidental charges etc., complete as per clause 504 MORTH Rev-5(ForPatchWorks) |
| 7 | Road B |
| 8 | ProvidingandlayingBituminousConcreteto30mmthickusing0.13cumof19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heatingthebitumenandaggregatetorequiredtemperatureandmixingtheminrequired temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paversite,spreadingthemixtouniformthicknessof40mmwithmechanicalpavertothe specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 tCMPwithbitumen boiler,tipper trucks,Paver Finisher,Vibratory roller andallothertoolsandplantrequired,includingfuelandallotherincidentalchargesetc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 |
| 9 | Road A |
| 10 | Road B |
| 11 | Earthworkexcavationinallclassesofsoilsexcepthardrockrequiringblastingand depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of otherdeleteriousmatterandobstructions,trimmingofbottomofexcavationbackfilling, clearingupthesiteanddisposalofallsurplusmaterialsetc.,completeasperstandard specification. For making up of low berms using carted earth with an average lead of 4 Km and inculding compaction with power roller |
| 12 | Road A |
| 13 | Earthworkexcavationinallclassesofsoilsexcepthardrockrequiringblastingand depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of otherdeleteriousmatterandobstructions,trimmingofbottomofexcavationbackfilling, clearingupthesiteanddisposalofallsurplusmaterialsetc.,completeasperstandard specification. For making up of low berms using carted earth with an average lead of 5 Km and inculding compaction with power roller |
| 14 | Road B |
| 15 | Calculation of SubTotal, GST and Total Amount carried out by system automatically |
| 16 | Basic cost of value put to tender as per estimate |
| 17 | Add GST at 18% |
| 18 | Total Value put to Tender |
| 19 | Quoted value |
| 20 | Final Quoted Value |
| 21 | Add GST at 18% of Final Quoted Value |
| 22 | Total Value of Contract Including 18% of GST |
| 23 | Basic cost of value put to tender as per Estimate |
| 24 | Quoted Rate in Figures (Total Value of Contract Including 18% of GST ) |