Supply Of Nrlm Shed Materials For Kalasur Grama Panchayath Savanur Taluk Haveri Dist - Display Board / Cib_Gkala,Lumpsum Material_Gkala,Burnt Bricks Class 35 (Non Modular)Gkala,Solid Concrete Blocks (40X20x20 Cms) 5.00 N Or Sqmm_Gkala,Binding Wire Gkala,Tmt Bars Fe 500_Gkala,Mathi Or Nandi Wood Planks For Panels 25 Mm Thick Gkala,Hom Of Machinaries For Planing Gkala,Add Cutting And Other Wastage 5 Percentage Gkala,Honnewood Planks For Panels 20 Mm Thick Gkala,Honne Wood Gkala,Unit Cost As Per The Specification Gkala,Add Wire Brush, Fine Steel Wool, Putty, Sand Paper, At 3 Percentage On Cost Of Paint Gkala,Ready Mix Primer Paint (Ready Mix Red Lead Paint)Gkala,Add Gkala,Welder Grade I Gkala,Fitter Class I Gkala,Z Section Gkala,Reeded Glass 2 Mm Thick_Gkala,Tw Beading For Fixing Glass Gkala,Stays Gkala,Hinges 5 Heavy Duty_Gkala,Handles_Gkala,Ms Clamps_Gkala,Mullion Section_Gkala,T Section_Gkala,Lime_Gkala,Add Brush, Putty, Glue At 5 Percentage On Cost Of Paint_Gkala,Whitening_Gkala,Dry Distemper_Gkala,Add Brush, Putty At 5 Percentage On Cost Of Distemper Primer_Gkala,Distemper Primer_Gkala,Add Brush, Putty, Sand Paper At 2 Percentage On Cost Of Paint_Gkala,Water Proofing Cement Paint_Gkala,Mason Class Ii (With Tools)_Gkala,Add Providing And Removing Scaffolding At 3 Percentage On Labour_Gkala,Painter Class I_Gkala,Add Brush, Putty, Sand Paper At 3 Percentage On Cost Of Paint_Gkala,Enamel Paint_Gkala,Vitrified Tiles 600X600 Mm_Gkala,White Cement_Gkala,Ceramic Tiles 30 X 30 Cms_Gkala,Add Watering Charges At 1 Percentage On Labour_Gkala,Add White Cement For Pointing At 2 Percentage On Material_Gkala,Mixer (Concrete Small Used In Culvert)_Gkala,Border Tiles 30 X 10 Cms_Gkala,Glazed Tiles 300X450_Gkala,Mason Class I (With Tools)_Gkala,S Or P 100Mm Trap_Gkala,Indian Type Water Closet Of Size 580 Mm Of Specified Make With Footrests_Gkala,Add White Lead Paint, Gasket, Cement, Sand For Making Good The Wall And Floor At 2 Percentage On Material_Gkala,Lead Or Pvc Connection Pipe 32Mm Dia (For Wash Basin)_Gkala,C.I. Or M.S. Brackets For Flushing Cistern_Gkala,Brass Stop Cock_Gkala,Cp Brass Waste 32 Mm Of Standard Pattern_Gkala,Cp Brass Chain With Plug_Gkala,Copper Plated Brass Piller Tap 15Mm_Gkala,White Vitreous China Clay Flat Back Wash Basin Size 550X400mm_Gkala,Handling Loading And Unloading 3 Percentage On Material_Gkala,Labour Charges For Lifting And Placing In Position And Making Connection At 7 Percentage On Material_Gkala,Polyenthylene Water Storage Tank Of Specified Capacity L_Gkala,Pvc Pipe Of 10Kg Cum,110 Mm_Gkala,Pvc Pipe Of 6Kg Cum,63 Mm_Gkala,Pvc Pipe Of 4Kg Cum,75 Mm_Gkala,Polythylene Pipes High Density 32Mm External Dia_Gkala,Add 5 Percentage For Fittings And Wastage Charges_Gkala,Licenced Plumber With Tools_Gkala,Add Handling , Loading And Unloading At 1 Percentage On Material_Gkala,Add Cement Sand And Grit 1Percentage On Material_Gkala,Bib Cock 20Mm Nominal Bore_Gkala,Labour Charges For Handing Errection Of Rcc Rings Etc. At 5 Percentage_Gkala,Transportation Charges Of Materials Beyond 5 Km At 10 Percentage_Gkala,Fabrication Charges Gkala,Cost Of 6.5Mm M.S. Coil_Gkala,Hom Of Vibrator 0.71 Days_Gkala,Plasticizer Or Super Plasticizer Gkala,Add Watering Charges At 1 Percentage On Material Gkala,Mixer (Concrete) 1 Cum Capacity Gkala,Portland Cement_Gkala,Coarse Sand (Zone Iii)_Gkala,Broken Stone Aggregate 12 Mm To 10 Mm Size_Gkala,Broken Stone Aggregate 20 Mm Size Gkala,Broken Stone Aggregate 40 Mm Size_Gkala,Casurina Poles 75 To 100 Mm Dia Gkala,Add Handling , Loading And Unloading At 2 Percentage On Material Gkala,Casurina Poles 100 To 150 Mm_Gkala,Silver Oak Or Equivalent Planks 38 Mm Thick_Gkala,Jungle Wood Runners And Planks_Gkala