| 1 | Earth work in excavationin foundation in hard soil within 50 m.initial lead and 1.5 m.lift including cost all labour etc. complete in all respect. |
| 2 | Filling sand in foundation & plinth including watering etc. complete. |
| 3 | Filling F&P with excavated material including cost of all materials labour etc. complete in all respect. |
| 4 | Cement concrete(1:3:6) with 40 mm. Size hard crusher broken hard granite metal. |
| 5 | Fly Ash Brick masonary in c.m (1:6) in Foundation and plinth etc complete. |
| 6 | RCC M20 using 20mm size HG C Broken chips including shuttering shuttering curing etc complete. |
| 7 | (a) Column Base & Footing |
| 8 | (b) Plinth Bend |
| 9 | (c) Column & Beam |
| 10 | (d) Lintal |
| 11 | € Roof Slab |
| 12 | Supplying HYSD steel with cutting bending including all cost of labour and material etc complete. |
| 13 | Manufacturing supplying Angular /Tubular truss and purlin including fabrication and fixing in position including all cost etc as per direction of Engineer-in - Charge complete. |
| 14 | Supplying fitting fixing and fabricating MS purlin including errecting etc complete. |
| 15 | Supplying & fitting fixing of HDD Bolt of 60cm long with base plate of (150 x150 x6)mm fixing in position in C C (1:2:4) including all cost and material etc complete. |
| 16 | Supplying fitting fixing of precoated Glavanised iron profile sheet semi gloss of 1000mm width & total coated thickness 0.47mm in roof drilling holes in wind ties with all cost etc complete. |
| 17 | Providing and laying20mm thick grading plaster in cement mortar(1:4) with water proof cement compound with curing etc. all complete. |
| 18 | Fly Ashbrick Masonry in Cement Mortar(1:6) in superstructure with all cost of labour etc complete. |
| 19 | 16 mm thick Cement Plaster in CM (1:6) for Brickmasonry Work etc complete. |
| 20 | 6mm thick cement plaster in CM(1:4) over RCC work including watering curing with all cost conveyance etc complete. |
| 21 | C C (1:2:4) using 12mm size crusher broken granite chips including curing etc complete. |
| 22 | 12 mm thick Cement Plaster in CM(1:6) for Brick masonry Work etc complete.. |
| 23 | Paintingtwo coats with approved shade of plastic emulsion paint over one coat of primer to inside wall surfaces. |
| 24 | Paintingtwo coats with approved shade of weather coat to outside wall surfaces. |
| 25 | Painting 2 coat with approved enamel paint on new wood workor iron work |
| 26 | Cement punning over floor base including curing conveyance etc complete. |
| 27 | Supplying fitting fixing virtrified floor tile including all cost of material labour etc complete. |
| 28 | Supplying fitting fixing wall tile including all cost of material labour etc complete. |
| 29 | Cost, supplying ,fitting &fixing of bathroom fibre door of approved makeincluding fibre choukatha all GI fittings all cost ,conveyance taxes etc. complete. |
| 30 | Manufacturing supplying and labour charges for fitting and fixing in position of M.S.grills as per approved design with one coat of anti-corrosive painting & making good to the damages of walls or R.C.C. or other structuralscomplete including mending |