Auction For Boiler Unit No. 6 & 7 :- Boiler & Esp Structure Along With Associated Auxiliaries, Air Preheater (Rotary),Id Fans, Fd Fans, Pa Fans, Seal Air Fans, Coal Mills, Soot Blowers, Coal Feeders, Coal Bunkers, Scraper Feeders, Dipc System & Building, Blow Down Tank, C.S Tank, Coal Pipes, Feed Line, Ms Lines, Primary Air /Secondary Air /Flue Gas Ducts Etc. Ash Slurry Pump House & Ash Slurry Pipe Lines, Chimney, Building And Foundation Of Above Auxiliaries. Fuel Oil Pump House Ph-2 And Unloading System Of Fuel Oil & Building. Sectional Part Of Wt Plant Ph-1 Installed In Area Of Proposed Unit No.12 Turbine unit no. 6 & 7 :- Turbo generator, HP/IP/LP turbine including valves, Condenser, CEP, TABP, BABP, BCW pumps, Heat exchangers & oil coolers, Instrument Air compressor and plant Air compressors, Flash tank, Boiler feed pumps, Seal oil system, SOP, centrifuge, Stator water system, H2 sealing system, MOT/Main oil pump, Vapour extraction fans, Barring gear, HP heaters, LP heaters, Expansion tank, PRDS, Damper tank, Deaerator, DG sets(PH-II & III), all pipe lines & electrical motors of above auxiliaries. Building & foundation of above auxiliaries. Starting ejectors, excitation system and excitation transformer. All connected pipe lines of feed/condensate/ CW pipe lines. HT, LT switch gear & battery bank. Clarifier tanks, clear water tank, DM water tanks, sump tank, Neutralization pit including their foundation and all associated buildings. Overhead tanks & other water tanks Boiler unit no. 8 & 9 :- Boiler & ESP structure along with associated auxiliaries, Air preheater (Rotary),ID fans, FD Fans, PA fans, seal air fans, coal mills, soot blowers, coal feeders, coal bunkers, scraper feeders, Blow down tank, C.S tank, coal pipes, feed line, MS lines, Primary Air /Secondary Air /Flue gas ducts etc. Ash slurry pump house & Ash slurry pipe lines,Chimney, Building and foundation of above auxiliaries. Fuel oil pump house PH-3 & building.