Tender For Provn Of Scada For Stp And Irp Under Ge East Bareilly; 1.00 Part-IOperate SCADA & IRP system for 1 yr during defect laibelity period including payment of bills of telecom service provide(Contarctor to provide month wise breakdown details of the same). AMC work of all the equipments/accessories are deemed to be included in the quoted rates.(i) One Engineer for a Day of 8 hours three shifts round the clock for monitoring , fault rectification and report generation of scada system. (ii) One Technician for a Day of 8 hours three shifts round the clock for attending all the defects/complaint immediately for smmoth running of SCADA system.(iii)Tool and Machinery for whole SCADA Automation system.(iv) Repair/Replacement of U/S spare of any type which is part of AMC technician shall be professionally qualified engineer not less than Diploma holder in the feild of information technology, instrumentation and control, computer Engineering and Shall have knowledge of installation and operation of SCADA system.(v) The quoted rate shall also include the cost of security of entire system i.e. protection from malware attack and data theft etc. for efficient and secured operation of system. 2.00 Operate SCADA & IRP system for 2 yr during defect laibelity period including payment of bills of telecom service provide(Contarctor to provide month wise breakdown details of the same). AMC work of all the equipments/accessories are deemed to be included in the quoted rates.(i) One Engineer for a Day of 8 hours three shifts round the clock for monitoring , fault rectification and report generation of scada system. (ii) One Technician for a Day of 8 hours three shifts round the clock for attending all the defects/complaint immediately for smmoth running of SCADA system.(iii)Tool and Machinery for whole SCADA Automation system.(iv) Repair/Replacement of U/S spare of any type which is part of AMC technician shall be professionally qualified engineer not less than Diploma holder in the feild of information technology, instrumentation and control, computer Engineering and Shall have knowledge of installation and operation of SCADA system.(v) The quoted rate shall also include the cost of security of entire system i.e. protection from malware attack and data theft etc. for efficient and secured operation of system. 3.00 Operation and comprehensive mainenance of SCADA & IRP system including cost of upgradation of Software,cost of spares for 1st year after complition of defect liability period,operation including payment of bills by telecom service provider (Contractor to provide month-wise breakdown details of the same).(AMC work of all the equipments/accessories are deemed to be included in te quoted rates.(i) One Engineer for a Day of 8 hours three shifts round the clock for attending all the defects/complaints immediately , monitoring , fault rectification and report generation of scada system. (ii) One Technician for a Day of 8 hours three shifts round the clock for attending all the defects/complaints immediately , monitoring , fault rectification and report generation of scada system. (iii) Tool and Machinery for whole SCADA Automation system.(iii) Repair/Replacement of U/S spare of any type which is part of AMC technician shall be professionally qualified engineer not less than Diploma holder in the feild of information technology, instrumentation and control, computer Engineering and Shall have knowledge of installation and operation of SCADA system.(v) The quoted rate shall also include the cost of security of entire system i.e. protection from malware attack and data theft etc. for efficient and secured operation of system. 4.00 Operation and comprehensive mainenance of SCADA system including cost of upgradation of Software,cost of spares for 2nd year after complition of defect liability period,operation including payment of bills by telecom service provider (Contractor to provide month-wise breakdown details of the same).(AMC work of all the equipments/accessories are deemed to be included in te quoted rates.(i) One Engineer for a Day of 8 hours three shifts round the clock for attending all the defects/complaints immediately , monitoring , fault rectification and report generation of scada system. (ii) One Technician for a Day of 8 hours three shifts round the clock for attending all the defects/complaints immediately , monitoring , fault rectification and report generation of scada system. (iii) Tool and Machinery for whole SCADA Automation system.(iv) Repair/Replacement of U/S spare of any type which is part of AMC technician shall be professionally qualified engineer not less than Diploma holder in the feild of information technology, instrumentation and control, computer Engineering and Shall have knowledge of installation and operation of SCADA system.(v) The quoted rate shall also include the cost of security of entire system i.e. protection from malware attack and data theft etc. for efficient and secured operation of system. 5.00 Operation and comprehensive mainenance of SCADA & IRP system including cost of upgradation of Software,cost of spares for 3rd year after complition of defect liability period,operation including payment of bills by telecom service provider (Contractor to provide month-wise breakdown details of the same).(AMC work of all the equipments/accessories are deemed to be included in te quoted rates.(i) One Engineer for a Day of 8 hours three shifts round the clock for attending all the defects/complaints immediately , monitoring , fault rectification and report generation of scada system. (ii) One Technician for a Day of 8 hours three shifts round the clock for attending all the defects/complaints immediately , monitoring , fault rectification and report generation of scada system. (iii) Tool and Machinery for whole SCADA Automation system.(iv) Repair/Replacement of U/S spare of any type which is part of AMC technician shall be professionally qualified engineer not less than Diploma holder in the feild of information technology, instrumentation and control, computer Engineering and Shall have knowledge of installation and operation of SCADA system.(v) The quoted rate shall also include the cost of security of entire system i.e. protection from malware attack and data theft etc. for efficient and secured operation of system. 6.00 Operation and comprehensive mainenance of SCADA & IRP system including cost of upgradation of Software,cost of spares for 4th year after complition of defect liability period,operation including payment of bills by telecom service provider (Contractor to provide month-wise breakdown details of the same).(AMC work of all the equipments/accessories are deemed to be included in te quoted rates.(i) One Engineer for a Day of 8 hours three shifts round the clock for attending all the defects/complaints immediately , monitoring , fault rectification and report generation of scada system. (ii) One Technician for a Day of 8 hours three shifts round the clock for attending all the defects/complaints immediately , monitoring , fault rectification and report generation of scada system. (iii) Tool and Machinery for whole SCADA Automation system.(iv) Repair/Replacement of U/S spare of any type which is part of AMC technician shall be professionally qualified engineer not less than Diploma holder in the feild of information technology, instrumentation and control, computer Engineering and Shall have knowledge of installation and operation of SCADA system.(v) The quoted rate shall also include the cost of security of entire system i.e. protection from malware attack and data theft etc. for efficient and secured operation of system. 7.00 Operation and comprehensive mainenance of SCADA & IRP system including cost of upgradation of Software,cost of spares for 5th year after complition of defect liability period,operation including payment of bills by telecom service provider (Contractor to provide month-wise breakdown details of the same).(AMC work of all the equipments/accessories are deemed to be included in te quoted rates.(i) One Engineer for a Day of 8 hours three shifts round the clock for attending all the defects/complaints immediately , monitoring , fault rectification and report generation of scada system. (ii) One Technician for a Day of 8 hours three shifts round the clock for attending all the defects/complaints immediately , monitoring , fault rectification and report generation of scada system. (iii) Tool and Machinery for whole SCADA Automation system.(iv) Repair/Replacement of U/S spare of any type which is part of AMC technician shall be professionally qualified engineer not less than Diploma holder in the feild of information technology, instrumentation and control, computer Engineering and Shall have knowledge of installation and operation of SCADA system.(v) The quoted rate shall also include the cost of security of entire system i.e. protection from malware attack and data theft etc. for efficient and secured operation of system. 8.00 Operation and comprehensive mainenance of SCADA & IRP system including cost of upgradation of Software,cost of spares for 6th year after complition of defect liability period,operation including payment of bills by telecom service provider (Contractor to provide month-wise breakdown details of the same).(AMC work of all the equipments/accessories are deemed to be included in te quoted rates.(i) One Engineer for a Day of 8 hours three shifts round the clock for attending all the defects/complaints immediately , monitoring , fault rectification and report generation of scada system. (ii) One Technician for a Day of 8 hours three shifts round the clock for attending all the defects/complaints immediately , monitoring , fault rectification and report generation of scada system. (iii) Tool and Machinery for whole SCADA Automation system.(iv) Repair/Replacement of U/S spare of any type which is part of AMC technician shall be professionally qualified engineer not less than Diploma holder in the feild of information technology, instrumentation and control, computer Engineering and Shall have knowledge of installation and operation of SCADA system.(v) The quoted rate shall also include the cost of security of entire system i.e. protection from malware attack and data theft etc. for efficient and secured operation of system. 9.00 Operation and comprehensive mainenance of SCADA & IRP system including cost of upgradation of Software,cost of spares for 7th year after complition of defect liability period,operation including payment of bills by telecom service provider (Contractor to provide month-wise breakdown details of the same).(AMC work of all the equipments/accessories are deemed to be included in te quoted rates.(i) One Engineer for a Day of 8 hours three shifts round the clock for attending all the defects/complaints immediately , monitoring , fault rectification and report generation of scada system. (ii) One Technician for a Day of 8 hours three shifts round the clock for attending all the defects/complaints immediately , monitoring , fault rectification and report generation of scada system. (iii) Tool and Machinery for whole SCADA Automation system.(iv) Repair/Replacement of U/S spare of any type which is part of AMC technician shall be professionally qualified engineer not less than Diploma holder in the feild of information technology, instrumentation and control, computer Engineering and Shall have knowledge of installation and operation of SCADA system.(v) The quoted rate shall also include the cost of security of entire system i.e. protection from malware attack and data theft etc. for efficient and secured operation of system. 10.00 Operation and comprehensive mainenance of SCADA & IRP system including cost of upgradation of Software,cost of spares for 8th year after complition of defect liability period,operation including payment of bills by telecom service provider (Contractor to provide month-wise breakdown details of the same).(AMC work of all the equipments/accessories are deemed to be included in te quoted rates.(i) One Engineer for a Day of 8 hours three shifts round the clock for attending all the defects/complaints immediately , monitoring , fault rectification and report generation of scada system. (ii) One Technician for a Day of 8 hours three shifts round the clock for attending all the defects/complaints immediately , monitoring , fault rectification and report generation of scada system. (iii) Tool and Machinery for whole SCADA Automation system.(iv) Repair/Replacement of U/S spare of any type which is part of AMC technician shall be professionally qualified engineer not less than Diploma holder in the feild of information technology, instrumentation and control, computer Engineering and Shall have knowledge of installation and operation of SCADA system.(v) The quoted rate shall also include the cost of security of entire system i.e. protection from malware attack and data theft etc. for efficient and secured operation of system. 11.00 Schedule A Part I A : Building Work (ref Sch A in Pdf folder) 12.00 Sch A Part I B (Building Work) 13.00 Chemical dosing system one each for Alum consisting of metering dosing pump ofcapacity 14 LPH against 5 Kg/cm2 pressurewith FHP electric motor operating on 415V/3phpower supply with chemical preparation cumdosing tank of capacity 200 Liters- one no.made out of FRP duly mounted with agitatormade of SS-316 and having suitablearrangement for mounting Dosing pump on thetank lid. 14.00 Oxidation Chamber suitable for 10000GPHcapacity , factory fabricated out of Mild Steelsheets having dished ends and size not lessfor 3.5 Kg/cm2 pressure. Vessel thickness fordished ends to be 8mm and for shell to be 8mmwith header & lateral sytem for distribution ofwater & ai .Oxidation chamber would becomplete with frontal piping and butterfly valvesfor inlet , outlet , drain , air feeding , automaticair release arrangement. Also the vessel to beprovided with suitable manhloe and handholewith proper bolted covers for ease ofmaintenance . Fresh charge of Iron removalmedia upto a min. bed depth of 1250mm to beprovided in the oxidation chamber. All internalsurfaces to be painted with lead free blackbitumastic paint and external surfaces to bepainted with two coats of synthetic enamel overa coat of redoxide primer. 15.00 Air compressor suitable to deliver oil free air @10 cu.m/hr against 3.0 kg./cm2pressure complete with electric motor andaccessories including air filter , pressure gaugeand outlet control valve etc.. ( 1W+1SB) 16.00 Iron removal Pressure Filter suitable for10000GPH capacity , factory fabricated out ofMild Steel sheets having dished ends and sizenot less than 1800mm dia. And 1800mm HOSsuitable for 3.5 Kg/cm2 pressure. Vesselthickness for dished ends to be 10mm and forshell to be 8mm with under bed disributionheader with laterals. Filter vessel would becomplete with frontal piping and butterfly valvesfor inlet , outlet , drain , backwash , air scouring, air release arrangement. Also the vessel to beprovided with suitable manhloe and handholewith proper bolted covers for ease ofwith proper bolted covers for ease ofmaintenance . Fresh charge of Filter mediaconsisting of graded gravels and quartz sandupto a min. bed depth of 1100mm to beprovided in the filter . All internal surfaces to bepainted with lead free black bitumastic paint andexternal surfaces to be painted with two coats of synthetic enamel over a coat of redoxide primer. 17.00 Air blower suitable to deliver back wash air @140 cu.m/hr against 0.35 kg./cm2 pressurecomplete with electric motor, air filter , silencer ,wafer check valve and common base frameetc. 18.00 Supply and Install Pumping sets,Discharge-756 LPM & Head 30 mtr centrifugal, electric driven 10 HP Motor Complete including suitable size of Copper cable LT panel Startor to Moter. all as specified and directed. 19.00 Supply and Install Pumping sets,Discharge-756 LPM & Head 30 mtr centrifugal, electric driven 5 HP Motor Complete including suitable size of Copper cable LT panel Startor to Moter. all as specified and directed. 20.00 Supply, install, testing and commissioning of Mild steel chlorine gas cylinder suitable for 100Kg capacity with filling lequid chlorine gas, industrial type as manufacturer recommended pressure for usage of drinking water treatment for improving taste, safety and odour of drinking water, highly reactive, reliable, optimum quality to kill Bacterial organisms at public properties, complete all as specified and as directed. 21.00 Supply, install, testing and commissioning of Remote wall/floor panel mounted Vacuum Chlorinator (regulator) for reduces the gas from a varying supply pressure 10kg- 75kg capacity with suitable capacity pressure feed pump including safety kit complete set suitable for disinfection of water through Vaccum feed or Pressure feed (Motor) chlorination by main water supply/swimming pools/sewage water treatment etc, complete all as specified and directed. 22.00 Notes :- The fwg items will not be measured as part of plant and shall be measured and paid separately:(a) All interconnecting pipe as per site.(b) All civil works including foundation.(c) All electrical works including starter panel, cabling and earthing. 23.00 Supply and testing for Iron Test Kit (0-10 mg/l, Blue, Aqua) Determines the dissolved Iron concentration in water by conversion of the Iron present in it to ferrous (Fe2+) state. Make process of testing fast, easy and safe, to match the color chart, make it simple to obtain the iron level in water, complete all as specified and as directed. 24.00 Supply, laying, jointing and lekage testing of MS ERW Pipe for making inter connection between motors and IRP Plants including supply and fixing of all fittings such as bend, tee, elbow, union, reducer etc laid in surfaces/trenches complete all as specified and directed of the following size:-(a) 50mm dia 25.00 (b) 65 mm dia 26.00 (c) 80 mm dia 27.00 (d) 100 mm dia 28.00 Supply and laying of 150 mm (6) bore centrifugally cast (Spun) Ductile Iron pressure pipe with spigot & socket end, class K-9 in any length laid in trenches, conforming to IS-8329/2000 with cement mortar lining with and including rubber gasket jointing conforming to IS-15382/tyton joint complete with all fittings e.g Tee, Bends etc all as specified and directed. 29.00 M&L for run lead joint Spigot and socketed pipes and fittings for 150 mm bore of pipe complete all as specified. 30.00 Supply and fix non return valve of size 150 mm bore, ISI marked including all joints with rubber or fiber board, bolts and nuts, washers etc complete all as specified. 31.00 S & F for Gun Metal Air Release valves, heavy duty screwed ends ISI marked suitable for 25 mm (1”) bore pipe and fixing up in oxydation chambers & IRP Pressure filter chambers including jointing materials etc, including making arrangement for safe working complete all as specified and directed. 32.00 Supply and fix Foot Valve conforming to IS 4038 100 mm (4”) dia including jointing materials etc, including making arrangement for safe working complete all as specified and directed. 33.00 Supply and fix Stainer Y Type confirming to IS, Size 100 mm (4”) dia including jointing materials etc, including making arrangement for safe working complete all as specified and directed. 34.00 Supply and fix pressure gauge 4dial 0-21 kgs rating complete all as specified. 35.00 M & L for Cutting CI /DI pipes and reducing to required length ,insertion of new tees, elbow branches before laying pipes. 36.00 S&F and testing of cast iron/DI pipe fittings (specials) heavy duty for spigot and socketed pipes upto 200mm bore of any type such as bends (any type, radius and angle) tapers any type, (straight, bend, increasing, decreasing or double socket etc.) Tee pieces single branch. Y junction, double branch, cross (all sockets or socket and spigot) collars, caps and plugs complete all as specified and directed. 37.00 Schedule A Part II A : Internal Electrification (ref Sch A in Pdf folder) 38.00 Sch A Part II B (Internal Electrification) 39.00 Supply and laying with commissioning and testing XLPE insulated, armoured heavy duty electric cable with aluminium conductor, 1100 volts grade of size 25 sqmm x 3.5 core laid in trenches, passing through pipes, fixed on walls complete including connecting properly by means of thimbles etc, complete all as specified and as directed. 40.00 Ditto, but sec. area 16 sqmm x 4 Core. 41.00 Ditto, but sec. area 6 sqmm x 2 Core. 42.00 M&L earthing complete with GI earth plate electrode of size 60cm x 60cm x 6.0mm thick burried directely in ground vertically to a depth not less than 2.25m below normal ground level with top edge of earth plate at a depth not less than 1.5m below normal ground level connected to and including earth lead of GI strip 32 x 6 mm by means of bolts, nuts and check nuts and washers etc made of GI and connected to Earthing test point and earth dolly all as shown in elect plate No 5 SSR Pt-I including all necessary excavation earth work, PCC chamber, chamber cover with handle (PCC 1:2:4) including 40mm dia protection pipe and 20mm dia watering pipe and wire mesh funnel etc complete all as specified and as directed. 43.00 S&F in repair earth continuity conductor GI strip 32x6mm size complete all as specified and directed. 44.00 Designing, Supplying, Developing, lnstallation, Integrating and Commission STP SCADA System along with various Automation equipment for STP as indicated and as per details attached. The STP SCADA system shall comprise of following: (a) Central Monitoring Station (CMS) with personal computer with latest processor and monitor of suitable size. (b) UPS with two hours backup. (c) Colour Laser Printer. (d) Server (When more than one STP being monitored centrally). (e) Data Gateway. (f) SCADA software which can be operated, programmed and modified by agencies other than developer. (g) PLC/ Microprocessor Controllers with indoor/ outdoor applications for water sensing display, pump operation with RTU without RTU or Microprocessor controller and microprocessor transmitter. (h) Suitable communication system including payment of bills to telecom service provider. (j) Pressure transmitters. (k) Ultrasonic sensors. (l) Flow-mneters and switches. (m) Online Continuous Efluent Monitoring System (OCEMS). 45.00 Notes:- (i) Design of Communication System shall be done by the bidder. Cloud based server/ data storage/ communication shall not be used and only local server based system shall be designed. (ii) The cost of each item shall also be attached to arrive at pricing in case of some addition/ reduction at site. (iii) Operating system, system software and programming shall not be intellectual property of any agency. (iv) The memory in the hard disk shall be suitable for six months data. The backup storage device/ devices shall be provided for archiving of data more than six months old upto five years. (v) In case of addition of installations, the system shall be capable of integrating the same. (vi) The responsibility of the agency is restricted to intimate mechanical and electrical failures such as failure of pumps, compressors, etc. Such repairs shall be carried by MES. (vii) Operation and maintenance charges to be paid separately. (viii) The SCADA system should have provision of both manual and automatic operation of installations. 46.00 Supply fixing testing and commissioning submersible cable round/flat 4.0 sqmm x 3 core PVC insulated and PVC sheathed with multi stranded copper conductor 1100 volts grade fixed to submersible motor column pipe using suitable size of clamps made out of stainless steel flat of size 20x2 mm with steel nuts bolts & washer foe every column pipe of 3 mtr lenght all as specified and directed. 47.00 All as per above item no 46.00 but 2.5 sqmm x 3 core. 48.00 Supply,install, test and commission, indoor type ,LT panel ,cubicle type, factory fabricated,CPRI approved, panel board made with 2.0 mm thick CRCA Sheet , weather and vermin proof , floor mounted type, IP-52 protection Class, comprising of copper bus bar mounted on hygroscopic insulator housed in separate chamber covered with R-Y-B and black PVC heat shrinkable sleeve, mounted on Hold fastener bolt, nuts and washers. Front opening hinged door with locking arrengement including Panel wiring of required size cable, Provision of cable glands,Separate compartment to accomodate MCBs, measuring instruments, Bus bar and cable gallay ,proper arrangements for ventilation complete with provn for connecting earthing at both sides of panel board comprises as following:- INCOMER:- (i) MCCB 4 pole 250A, 415V, 50Hz, 25 kA - 01 Nos. OUTGOING:- (i) MCCB 4 pole 160A, 415V, 50Hz, 16 kA - 01 No. (i) MCCB 4 pole 100A, 415V, 50Hz, 16 kA - 01 No. (iii) MCB TPN 40A, 415V, 50Hz, 10 kA - 03 Nos. (iv) MCB SPN 20A, 415V, 50Hz, 10 kA - 02 No. METERING & INDICATION:- (i) Ammeter, Digital type, 0-200 A with CTs- 01 set. (ii) Voltmeter, Digital type 0-500V with - 01 set. (iii) R-Y-B phase indicating lamps with 3 Nos. - 01 set. (iv) Internal wiring with suitable size of PVC insulated stranded copper conductor duly crimped with copper lugs ferruled. 49.00 Schedule A Part II A : Semi Underground water Sump of 50000 Gallone Capacity (ref Sch A in Pdf folder)