Power Government Departments Closing in 0 days TDR #50853644

Tender For Construction Of 33Kv Line Gangapur From 132Kv Substation Rajatalab Varanasi, 33Kv Line For 33/11 Kv Substation Gopalapur From 132Kv Madiyahu Jaunpur, Increasing Capacity Of 33/11 Kv Substation Sujabad Chandauli And Construction Of 11Kv Line Fro

Issued by Government Departments · gangapur, Uttar Pradesh
Tender Value
Ref. Documents
Estimated cost
Bid Submission
08 Sep 2025
0 days left
EMD
91000
Bank guarantee accepted
Document Fee
3540
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
gangapur → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

CONSTRUCTION OF 33KV LINE GANGAPUR FROM 132KV SUBSTATION RAJATALAB VARANASI, 33KV LINE FOR 33/11 KV SUBSTATION GOPALAPUR FROM 132KV MADIYAHU JAUNPUR, INCREASING CAPACITY OF 33/11 KV SUBSTATION SUJABAD CHANDAULI AND CONSTRUCTION OF 11KV LINE FROM 33/11KV SUBSTATION SUJABAD, DIST-CHANDAULI ON SEMI TURNKEY BASIS.(ALL MATERIAL SHOULD BE AS APPROVED GTP BY PUVVNL (STANDARD MAKE).

BOQ

Name of Work: CONSTRUCTION OF 33KV LINE GANGAPUR FROM 132KV SUBSTATION RAJATALAB VARANASI, 33KV LINE FOR 33/11 KV SUBSTATION GOPALAPUR FROM 132KV MADIYAHU JAUNPUR, INCREASING CAPACITY OF 33/11 KV SUBSTATION SUJABAD CHANDAULI AND CONSTRUCTION OF 11KV LINE FROM 33/11KV SUBSTATION SUJABAD, DIST-CHANDAULI ON SEMI TURNKEY BASIS.(ALL MATERIAL SHOULD BE AS APPROVED GTP BY PUVVNL (STANDARD MAKE).
Sl. No. Item Description
1SUPPLY OF MATERIALS FOR CONSTRUCTION OF 33 KV LINE GANGAPUR FROM 132 KV SUBSTATION RAJATALAB DISTT. VARANASI.
233 KV \"E\" bracket
3GI pipe 6\" dia for cable hoisting
4PG clamp for DOG conductor
5Danger board 33 KV with clamp
6M.S Channel 125x65x6mm
7HDPE pipe 160mm OD PN-4 PE-80 grade UV stabilized as per IS:4984
8Number plate
9GI barbed wire
10Nut & bolts with washer
11Cable holding clamp
12Stone pad 300x300x75mm
13Stay clamp
14Earth wire clamp
15Top channel Clamp
16Bracing angle clamp
17Dropper channel clamp
18Allu. binding wire 6swg
19Stay insulator for 7/8 swg stay wire 33 Kv porcelain type
20ERECTION OF CONSTRUCTION OF 33 KV LINE GANGAPUR FROM 132 KV SUBSTATION RAJATALAB DISTT. VARANASI.
21PCC pole 9 M long
2233 KV Pin insulator polymeric type
2333 kV Stay rod 20x1800 mm
2433 KV Top channel 125x65x6mm- 3200mm
2533 KV Bracing angle 65x65x6mm- 4300mm
26Dropper channel
27ACSR dog conducotr
2833 KV Disc insulatorB&S type Polymeric 70KN
29Disc fitting 70KN
30Earthing rod 20x2500 mm and 6 SWG earthing wire
31Stay wire 9(4MM)7/8 SWG
32GI wire 5mm
3333 KV \"E\" bracket
34GI pipe 6\" dia for cable hoisting
35PG clamp for DOG conductor
36Danger board 33 KV with clamp
37M.S Channel 125x65x6mm
38HDPE pipe 160mm OD PN-4 PE-80 grade UV stabilized as per IS:4984
39Number plate
40GI barbed wire
41Nut & bolts with washer
42Cable holding clamp
43Stone pad 300x300x75mm
44Stay clamp
45Earth wire clamp
46Top channel Clamp
47Bracing angle clamp
48Dropper channel clamp
49Allu. binding wire 6swg
50Stay insulator for 7/8 swg stay wire 33 Kv porcelain type
51Concreting of Stay rod 20x1800 mm as per RESPO norms
52Grouting & concreting of 9M PCC pole along with plinthing/muffing as per RESPO norms
53Cable route marker height*width =40\"x10\" and thikness=3\"\"NOMENCLATURE -33kV UNDERGROUND CABLE,DEPTH - ……METER\"
54Digging & making of standard size cable trench by providing sand, bricks & saparate stone slab for each 33 Kv 3x300 sqmm XLPE cable (all required material like sand, bricks & stone slab etc will be provided by contractor)
55Laying and dressing of 33 kV, 3x300 sqmm XLPE cable in the trench providing fine sand, cushion beneath and fine sand cushion above the cable. The cable shall be duly protected by bricks, sand & saparate stone slab, (all required material like sand, bricks & stone slab etc will be provided by contractor)
56Hosting of 33KV 3x300sqmm XLPE cable with 6\" dia 3.5mtr long GI pipe on the double pole cable before mounting the cable on the double pole, lifting, mounting and clamping on the doubel pole structure and making connection.
57Fixing & jointing of 33 Kv 3x300sqmm XLPE cable outdoor jointing kit after carefully removing the insulation of the cable duly plumbing and taping of cable providing, fixing and crimpling of proper size good quality lugs and complete work.
58Fixing & jointing of 33 Kv 3x300sqmm XLPE cable straight through Jointing kit after carefully removing the insulation of the cable duly plumbing and taping of cable providing, fixing and crimpling of proper size good quality lugs and complete work.
59Cartage charge of 33kV cable
60Cartage charge of all material
61SUPPLY OF MATERIALS FOR CONSTRUCTION OF NEW 33 KV LINE FOR 33/11 KV SUBSTATION GOPALAPUR FROM 132 KV MADIYAHU DIST. JAUNPUR.
62X-Arm clamp for STP 11 mtr/PCC 9 Mtr
63Top channel clamp for STP 11 mtr with N& B
64Bracing angle clamp complete with N& B
65Dropper angle clamp
66Guarding angle clamp
6733 kV \"E\" bracket
68F/T bracket with clamp for PCC
69PG clamp for DOG conductor
70HDPE pipe 160mm OD PN-4 PE-80 grade UV stabilized as per IS:4984
71Danger Board 33 kV with clamp
72Number plate
73GI Barbed wire
74Nut & bolts with washer
75Stone pad
76GI pipe 6\"\" dia
77Red oxide paint
78Allu. Paint
79Cable holding clamp
80Stay clamp
81MS angle 50x50x5mm for extention side/hieght bracket
82MS channel 100x50x5mm for extention side/hieght bracket
83Eye bolt
84Stay insulator for 7/8 swg stay wire 33kv line porceline type
85ERECTION OF CONSTRUCTION OF NEW 33 KV LINE FOR 33/11 KV SUBSTATION GOPALAPUR FROM 132 KV MADIYAHU DIST. JAUNPUR.
8633 kV lightening arrestor
87Structure for L.A.
8833 kV line Isolator
89Structure for line Isolator
90PCC Pole 11 mtr long
91ST Pole 11 mtr long
92PCC pole 9mtr
93ST Pole 13 mtr long
9433 kV V type X-Arm 100x50x6 mm, MS channel for STP 11mtr/PCC 9Mtr
95ACSR DOG conductor (23Km x3+3%)
9633 kV Disc insulatorB&S type Polymeric
97Disc fitting dog/racoon
9833 kV Pin insulator polymeric type
9933 kV Top channel 125x65x6mm- 3200mm long
10033 kV Bracing angle 65x65x6mm- 4300mm long
101Stay wire 7/8 swg
102Dropper channel
103MS angle 65X65X6mm (for guarding angle 3.2mtr*50No*5.8/kg=928 kg)
104Earthing rod 20X2540 mm
105GI wire 5mm
106GI wire 4mm
107X-Arm clamp for STP 11 mtr/PCC 9 Mtr
108Top channel clamp for STP 11 mtr with N& B
109Bracing angle clamp complete with N& B
110Dropper angle clamp
111Guarding angle clamp
11233 kV \"E\" bracket
113F/T bracket with clamp for PCC
114PG clamp for DOG conductor
115Danger Board 33 kV with clamp
116Number plate
117GI Barbed wire
118Nut & bolts with washer
119Stone pad
120GI pipe 6\"\" dia
121Red oxide paint as per RESPO norms
122Allu. Paint as per RESPO norms
123Cable holding clamp
124Stay clamp
125MS angle 50x50x5mm for extention side/hieght bracket
126MS channel 100x50x5mm for extention side/hieght bracket
127Eye bolt
128Stay insulator for 7/8 swg stay wire 33kv line porceline type
129Grouting & concreting of 11M ST pole along with plinthing/muffing as per RESPO norms
130Grouting & concreting of 13M ST pole along with plinthing/muffing as per RESPO norms
131Grouting & concreting of 11M PCC pole along with plinthing/muffing as per RESPO norms
132Grouting & concreting of 9M PCC pole along with plinthing/muffing as per RESPO norms
133Trimming of tree branches on the way of line
134Concreting of Stay rod 20x1800 mm as per RESPO norms
135Cable route marker height*width =40\"x10\" and thikness=3\"\"NOMENCLATURE -33kV UNDERGROUND CABLE,DEPTH - ……METER\"
136Horizontal boring & laying of 160mm dia HDPE pipe below railway track after digging of pit by HDD method
137Laying and dressing of U/G 33 kV, 3*300 sqmm XLPE cable with double circuit configuration below Railway track crossing into 160mm HDPE Pipe by Horizontal drilling method. The cable loop shall be duly protected by bricks, sand & saparate stone slab. (All required materials likes sand, bricks & stone slab etc. will be provided by contractor)
138Digging & making of standard size cable trench by providing sand, bricks & saparate stone slab for each 33 kV 3*300 sqmm XLPE cable (All required materials like sands, bricks & stone slab etc will be provided by contractor)
139Laying and dressing of 33 kV, 3*300 sqmm XLPE cable including loop wtih double circuit configuration in the trench providing fine sand, cushion beneath and fine sand cushion above the cable. The cable shall be duly protected by bricks, sand & saparate stone slab as per RESPO norms. (All required materials likes sand, bricks & stone slab etc. will be provided by contractor)
140Fixing & jointing of 33 kV,3x300 sqmm XLPE cable Outdoor jointing kit after carefully removing the insulation of the cable duly plumbing and taping of cable providing, fixing and crimpling of proper size good quality lugs and complete work
141Fixing & jointing of 33 kV,3x300 sqmm XLPE cable straight through jointing kit after carefully removing the insulation of the cable duly plumbing and taping of cable providing, fixing and crimpling of proper size good quality lugs and complete work
142Hosting of 33 kV,3*300 sqmm XLPE cable with 6\"\" Dia, 3.5 mtr long GI Pipe on the double pole cable before mounting the cable on the double pole, lifting, mounting and clamping on the double pole structure and making connection
143Cartage charge of Cable 3x300 sqmm
144Cartage charge of all other material
145SUPPLY OF MATERIALS FOR INCREASING CAPACITY OF 33/11KV SUBSTATION SUJABAD FROM (1X10) MVA TO (1X10+1X5) MVA, DIST-CHANDAULI
146MS channel 100x50x6mm-3000mm long for fabrication of cable stand and neutral earthing stand for power T/F
147MS flat 50*6mm for fabrication of cable stand and neutral earthing stand for power T/F
148Fire fighting extinguisher (6kg) of sub station as per ISI specification including mounting on wall with the help of clamp
149Fire bucket stand with 04 no. buckets (For switchgear/ control room & switchyard)
150Rubber matt 2*1.5mtr, 3mm thick as per IS standard
151Stone Pad 300x300x75
152Control cable 2x2.5 MM2 (Armored Cable)
153Control cable 4x2.5 MM2 (Armored Cable)
154Control cable 6x2.5 MM2 (Armored Cable)
155Control cable 10x2.5 MM2 (Armored Cable)
156Battery charger
157Battery set 12Nos. X 2Volts, 200Ah with stand
158GI pipe 6\" dia
159E- bracket
160Junction box (for control cable wiring)
161Top channel clamp
162Dropper angle clamp
163Bracing angle clamp
164Stay Clamp
165Cable holding clamp
166PG clamp for DOG conductor
16711kV Danger board & clamp with N&B
16811 kV Cable jointing kit 3x300 mm XLPE O/D
16911 kV Cable jointing kit 3x300 mm XLPE I/D
17011 kV Cable jointing kit 3x185 mm XLPE O/D
17111 kV Cable jointing kit 3x185 mm XLPE I/D
172GI barbed wire
173Clamp & connector for 33kV switchyard equipment
174Break Down, Shut Down Roistaring name board 4 Nos. each
175Stay insulator for 7/10 swg stay wire, 11 kV procelain type
176Fuse set fixing clamp
177Earth wire clamp
17811 kV TPMO with polymer insulator
179Bolts & Nuts all Size
180ERECTION OF INCREASING CAPACITY OF 33/11KV SUBSTATION SUJABAD FROM (1X10) MVA TO (1X10+1X5) MVA, DIST-CHANDAULI
181Main bus bar complete with strucutre (Bus bar gantry, 24 No disc insulator & 06 No disc fitting B&S)
18233kV CT, 200/100/1-1-1A
18333 kV Bus isolator 800A
18433 kV L.A
18533 kV Post insulator
186ACSR DOG conductor
187PCC pole8.5mtr long
18890 lbs rail pices for T/F Plinth (44.64 Kg/Mtr.)
1898.5M PCC pole
190MS Top channel (100*50*6mm-2240mm)
191MS Bracing angle 65x65x6-2700 mm
192Dropper channel (100*50**6mm-2028mm)
19311 kV Disc insulator polymer type 45 KN
19411 kV Disc fitting 45KN
19511 kV Pin insulator polymer type
196Stay rod 16x1800mm
197Stay wire 7/10 SWG
198MS earthing rod 20x2500 mm
199T/F Fresh Oil
20011 kV fuse set
201Fire fighting extinguisher (6kg) of sub station as per ISI specification including mounting on wall with the help of clamp
202Fire bucket stand with 04 no. buckets (For switchgear/ control room & switchyard)
203Rubber matt 2*1.5mtr, 3mm thick as per IS standard
204Stone Pad 300x300x75
205Control cable 2x2.5 MM2 (Armored Cable)
206Control cable 4x2.5 MM2 (Armored Cable)
207Control cable 6x2.5 MM2 (Armored Cable)
208Control cable 10x2.5 MM2 (Armored Cable)
209Battery charger
210Battery set 12Nos. X 2Volts, 200Ah with stand
211GI pipe 6\" dia
212E- bracket
213Junction box (for control cable wiring)
214Top channel clamp
215Dropper angle clamp
216Bracing angle clamp
217Stay Clamp
218Cable holding clamp
219PG clamp for DOG conductor
22011kV Danger board & clamp with N&B
221GI barbed wire
222Clamp & connector for 33kV switchyard equipment
223Break Down, Shut Down Roistaring name board 4 Nos. each
224Stay insulator for 7/10 swg stay wire, 11 kV procelain type
225Fuse set fixing clamp
226Earth wire clamp
22711 kV TPMO with polymer insulator
228Bolts & Nuts all Size
229Earthing of S/s outdoor equipments as per RESPO norms Laying of earth mat in the switchyard by laying of MS round of 32 mm dia in 1000mm deep trenches with MS round 32 mm dia, 3 mtr long earth electrodes as per RESPO norms. The work includes welding of the MS round, conneting all steel structures in the switchyard with the earth mat by means of GI strips of size 50x6mm as per item below. (All required materials will be provided by contractor) (A) Excavation of earth for laying mat
230(B) Driving of earth electrode (32mm dia, 3 mtr long)
231(C) Laying of earth mat (MS) bar including cutting, shaping and binding etc.
232(D) Preparation of joints, proper making and welding of main earth mat bar joints and applying bitumen impregnated on joints i.e. end joints, cross joints and lap joints
233(E) Welding of riser strip with earth mat and department structure body (One set means one riser strip welding to main equipments.)
234Earthing of S/s for indoor equipments as per RESPO normsBy way of boring and lowering \"B\" class GI pipe 2\"\" dia, - 3no*20 mtr deep (02 no for both side of switchgear room in delta connection earthing and making earthing pit for each) by providing all materials like \"B\" class GI pipe 2\"\" dia, 50*6mm GI strip, socket, sand, charcoal, bricks, cement etc.(All required materials will be provided by contractor)
235Plinth & foundation for T/FConstruction of plinth of size 4.50*3.50 Mtr for 5 MVA T/F. (All required materials for civil work like sands, bricks, cement, MS bars, stone grits etc. will be provided by contractor)
236Plinth & foundation for 33 kV VCB(Construction of plinth of standard size suitable for erection of upper structure for 33 kV VCB including grouting of anchor bolts in proper alignment and level. (All required materials for civil work like sands, bricks, cement, MS bars, stone grits etc. will be provided by contractor)
237Digging & Making of standard size Pakka cable trench by providing cement, sand, bricks & C.C. trench cover for laying of various size of control cable (All required materials like cements, sands, bricks & C.C. trench cover etc will be provided by contractor)
238FABRICATION OF TRANSFORMER SEPARATE EARTHING T/F NEUTRAL EARTHING(A) Seprate earthing of power T/F by way of boring and lowering GI pipe 2\"\" dia, - 5no*20 mtr deep (02 no for T/F body earthing and 01 no for T/F neutral in delta connection earthing and making earthing pit for each) by providing all materials like GI pipe 2\"\" dia, 50*6mm GI strip, socket, sand, bricks, cement etc.(All required materials will be provided by contractor)(B) Fabrication and grouting of M.S Channel 100*50*6mm in L- shape with 50*6mm GI strip & in proper size and alignment to provide support for power transformer neutral
239Fabrication and erection of cable support made of two pieces of M.S channel 100x50mm,3.0 mtr long joined to each other by means of 5 nos M.S Flat 50x6mm places each by welding at equal intervals and grouting in a block of standard size complete (All required materials will be provided by contractor)
240INSTALLATION& CHARGING OF 11kV SWITCHGEARS & CONTROL PANEL IN CONTROL ROOM:- A) Shifting carefully & safely 11kV I/C, O/G & bus coupler switchgear from outside of the switchgear room as per direction of Engineer in charge-04 Nos., (B) Fixing and making bus bar connections in between all switchgears-01 Nos & (C) Shifting carefully & installation of 33 kV single circuit transformer control panel in control room-01 No.(All required materials will be provided by contractor)
241FABRICATION, ERECTION & GROUTING OF S/s STRUCTURE:- (A) Fabrication of bus isolatorstructures-01 No., (B) Fabrication of Lightening Arrestor/CT structure-02 No. & (C) Fabrication of Post structure-01 No.
242Grouting & concreting along with plinthing and muffing of PCC pole by providing sand, cement, grit and bricks as per norms (Sand, cement, grit and bricks will be provided by contrator)
243Concreting of stay by providing sand, cement, grit and bricks as pernorms (Sand, cement, grit and bricks will be provided by contrator)
244Digging & Making of standard size Pakka cable trench deep by providing cement, sand, bricks & C.C. trench cover for laying of 11 kV 3x300 sqmm XLPE cable from both 5MVA Transformer (All required materials like cements, sands, bricks & C.C. trench cover etc will be provided by contractor)
245Laying & dressing of 11 kV, 3*300 sqmm underground cable from 5MVA T/F to 11 kV incoming switchgear in the Pakka trench providing fine sand, cushion beneath and fine sand cushion above the cable. The cable shall be duly protected by bricks, sand & saparate stone slab. (All required materials likes sand, bricks & stone slab etc. will be provided by contractor)
246Digging & making of standard size cable trench by providing sand, bricks & saparate stone slab for each 11 kV 3x185 sqmm XLPE cable (All required materials like sands, bricks & stone slab etc will be provided by contractor)
247Laying & dressing of 11 kV,3*185 sqmm underground cable in the trench providing fine sand, cushion beneath and fine sand cushion above the cable. The cable shall be duly protected by Ist class bricks, sand & saparate stone slab. (All required materials likes sand, bricks & stone slab etc. will be provided by contractor)
248Fixing & jointing of 11 kV,3x300 sqmm XLPE cable Outdoor jointing kit after carefully removing the insulation of the cable duly plumbing and taping of cable providing, fixing and crimpling of proper size good quality lugs and complete work
249Fixing & jointing of 11 kV,3x300 sqmm XLPE cable Indoor jointing kits on switchgears after carefully removing the insulation of the cable, duly plumbing and taping of cable providing,fixing and crimpling of proper size good quality lugs, duly plumbing and taping of cable properly fixing of lugs on switchgears and boxes complete work
250Fixing & jointing of 11 Kv 3x185 sqmm XLPE cable Outdoor jointing kit after carefully removing the insulation of the cable duly plumbing and taping of cable providing, fixing and crimpling of proper size good quality lugs and complete work
251Fixing & jointing of 11 kV,3x185 sqmm XLPE cable Indoor jointing kits on switchgears after carefully removing the insulation of the cable, duly plumbing and taping of cable providing, fixing and crimpling of proper size good quality lugs, duly plumbing and taping of cable properly fixing of lugs on switchgears and boxes complete
252Hosting of 11 kV,3*185 sqmmXLPE cable with 100 mm Dia, 3.5 mtr long GI Pipe on the outgoing feeder cable before mounting the cable on the double pole, lifting, mounting and clamping of 11 kV feeder cable boxes on the feeder double pole structure and making connection
253Hosting of 11 kV 3*185 sqmm XLPE cable to 11 outgoing feeder switchgear, 11/0.4 kV T/F & 11 kV 3*300 sqmm XLPE cable from 33/11 kV T/F to 11 kV Incommer switchgears
254Transformer repairing work in case of providing old & used T/F (repairing work of T/F like changing Gasket, changing O ring of T/F busing, stopping oil leakage etc.)
255Painting of all structure, earthing strip, neutral strip stand & T/F cable stand etc. with Alluminium paint & Red Oxide Paint (All required materials like red oxide, alluminium paints will be provided by contractor)
256Transformer Cleaning and painting work (T/F body Colour)
257Miscllaneous Work (Soil filling & Leveling, Dismental & erection of boundery wall etc.)
258Erection of 33/11 Kv 5MVA Power T/F including mounting of T/F on plinth in safe position, fixing of radiator, conservator tank, top up of T/F oil and commissioning of all accecassaris.
259Cartagecharges of all other material
260SUPPLY OF MATERIALS FOR CONSTRUCTION OF 11 KV LINE FROM 33/11 KV SUBSTATION SUJABAD, DIST-CHANDAULI.
261Cross arm clamp
262Top channel clamp
263Dropper channel clamp
264Bracing Angle clamp
26511KV \"E\" bracket with nut & bolt
26611KV \"F/T\" bracket
267M.S angle 65x65x6mm for fabracation of Side X-arm as per site requirement (15 Nos)
268Guard angle clamp
269Stay Clamp
270Stay Insulator
271T-off Clamp
272G.I. Barbed wire
273Nut, Bolt & Washer
274Red oxide paint
275Allu. Paint
276Stone Pad
277PG clamp
278Danger board & clamp with nut & bolt
279GI pipe 100 mm dia
280Cable Holding clamp
281ERECTION OF CONSTRUCTION OF 11 KV LINE FROM 33/11 KV SUBSTATION SUJABAD, DIST-CHANDAULI.
28211M ST pole long
28311M PCC pole long
2848.5M PCC pole long
285ACSR Weasel conductor
28611 Kv \"V\" type X-arm
28711 Kv top channel 100x50x6-2240 mm
288MS dropper channel 100x50x2600mm
28911 Kv MS iron bracing angle 65x65x6-2700 mm with 4 no clamp
29011 Kv stay set 16x1800mm
291Stay wire 7/10 SWG
292Earthing rod 20x2500 mm
29311 Kv disc insulator 45 KN Polymer type
29411 Kv disc fitting 45 KN Polymer type
29511 Kv pin insulator Polymer type
296Guarding angle 65x65x6mm
297T-off Channel
298G.I wire 4mm
299G.I wire 5mm
300Cross arm clamp
301Top channel clamp
302Dropper channel clamp
303Bracing Angle clamp
30411KV \"E\" bracket with nut & bolt
30511KV \"F/T\" bracket
306M.S angle 65x65x6mm for fabracation of Side X-arm as per site requirement (15 Nos)
307Guard angle clamp
308Stay Clamp
309Stay Insulator
310T-off Clamp
311G.I. Barbed wire
312Nut, Bolt & Washer
313Red oxide paint
314Allu. Paint
315Stone Pad
316PG clamp
317Danger board & clamp with nut & bolt
318GI pipe 100 mm dia
319Cable Holding clamp
320Grouting and concreting of 11M ST pole along with plinthing and muffing as per RESPO norms
321Grouting and concreting of 11M PCC pole along with plinthing and muffing as per RESPO norms
322Grouting and concreting of 8.5M PCC pole along with plinthing and muffing as per RESPO norms
323Concreting of Stay rod 20x1800 mm as per RESPO norms
324Digging & making of standard size cable trench by providing sand, bricks & saparate stone slab for each 11 kV 3*185 sqmm XLPE cable (All required materials like sands, bricks & stone slab etc will be provided by contractor)
325Laying and dressing of 11 kV, 3*185 sqmm XLPE cable in the trench providing fine sand, cushion beneath and fine sand cushion above the cable. The cable shall be duly protected by bricks, sand & saparate stone slab. (All required materials likes sand, bricks & stone slab etc. will be provided by contractor)
326Fixing & jointing of 11 Kv 3x185 sqmm XLPE cable Outdoor jointing kit after carefully removing the insulation of the cable duly plumbing and taping of cable providing, fixing and crimpling of proper size good quality lugs and complete work (All required materialswill be provided by contractor)
327Fixing & jointing of 11 Kv 3x185 sqmm XLPE cable straight through jointing kit after carefully removing the insulation of the cable duly plumbing and taping of cable providing, fixing and crimpling of proper size good quality lugs and complete work (All required materialswill be provided by contractor)
328Hosting of 11 kV,3*185 sqmmXLPE cable with 100 mm Dia, 3.5 mtr long GI Pipe on the double pole cable before mounting the cable on the double pole, lifting, mounting and clamping of 11 kV cable boxes on the double pole structure and making connection
329Cable route marker height*width =40\"x10\" and thikness=3\" \"NOMENCLATURE -33kV UNDERGROUND CABLE, DEPTH - ……METER\"
330Tree branch cutting
331Cartage charges of 11 kv 3x185 Sqmm XLPE cable
332Cartage charges of all other material

AI Tender Summary

OUR REF NO 50853644
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 08-09-2025
Authority
Authority Name Purvanchal Vidyut Vitaran Nigam Limited
Work Description CONSTRUCTION OF 33KV LINE GANGAPUR FROM 132KV SUBSTATION RAJATALAB VARANASI, 33KV LINE FOR 33/11 KV SUBSTATION GOPALAPUR FROM 132KV MADIYAHU JAUNPUR, INCREASING CAPACITY OF 33/11 KV SUBSTATION SUJABAD CHANDAULI AND CONSTRUCTION OF 11KV LINE FROM 33/11KV SUBSTATION SUJABAD, DIST-CHANDAULI ON SEMI TURNKEY BASIS.(ALL MATERIAL SHOULD BE AS APPROVED GTP BY PUVVNL (STANDARD MAKE).
Basic Detail
Tender No 09/EWC(V)/2025-26
Bidding Type Tender
Location
City gangapur
State Uttar Pradesh
Key Dates
Publish Date 25 Aug 2025
Submission Date 08 Sep 2025
Open Date 09 Sep 2025
Finance
Tender Value Ref. Documents
Tender Fee 3540
EMD 91000
Exemption Not Available
Document List
0b91fbfa-093c-4b59-a76e-b26ee3960aca.html
BOQ_1948333.xls
TDEWC09PDF.rar
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Aug 25, 2025
11:30 IST

Tender Published

Tender notice published.

Completed
Sep 08, 2025
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Sep 09, 2025

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

0b91fbfa-093c-4b59-a76e-b26ee3960aca.html

xls

BOQ_1948333.xls

rar

TDEWC09PDF.rar

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders