Tender For Construction Of 33Kv Line Gangapur From 132Kv Substation Rajatalab Varanasi, 33Kv Line For 33/11 Kv Substation Gopalapur From 132Kv Madiyahu Jaunpur, Increasing Capacity Of 33/11 Kv Substation Sujabad Chandauli And Construction Of 11Kv Line Fro
Tender Overview
Project Description
CONSTRUCTION OF 33KV LINE GANGAPUR FROM 132KV SUBSTATION RAJATALAB VARANASI, 33KV LINE FOR 33/11 KV SUBSTATION GOPALAPUR FROM 132KV MADIYAHU JAUNPUR, INCREASING CAPACITY OF 33/11 KV SUBSTATION SUJABAD CHANDAULI AND CONSTRUCTION OF 11KV LINE FROM 33/11KV SUBSTATION SUJABAD, DIST-CHANDAULI ON SEMI TURNKEY BASIS.(ALL MATERIAL SHOULD BE AS APPROVED GTP BY PUVVNL (STANDARD MAKE).
BOQ
| Sl. No. | Item Description |
| 1 | SUPPLY OF MATERIALS FOR CONSTRUCTION OF 33 KV LINE GANGAPUR FROM 132 KV SUBSTATION RAJATALAB DISTT. VARANASI. |
| 2 | 33 KV \"E\" bracket |
| 3 | GI pipe 6\" dia for cable hoisting |
| 4 | PG clamp for DOG conductor |
| 5 | Danger board 33 KV with clamp |
| 6 | M.S Channel 125x65x6mm |
| 7 | HDPE pipe 160mm OD PN-4 PE-80 grade UV stabilized as per IS:4984 |
| 8 | Number plate |
| 9 | GI barbed wire |
| 10 | Nut & bolts with washer |
| 11 | Cable holding clamp |
| 12 | Stone pad 300x300x75mm |
| 13 | Stay clamp |
| 14 | Earth wire clamp |
| 15 | Top channel Clamp |
| 16 | Bracing angle clamp |
| 17 | Dropper channel clamp |
| 18 | Allu. binding wire 6swg |
| 19 | Stay insulator for 7/8 swg stay wire 33 Kv porcelain type |
| 20 | ERECTION OF CONSTRUCTION OF 33 KV LINE GANGAPUR FROM 132 KV SUBSTATION RAJATALAB DISTT. VARANASI. |
| 21 | PCC pole 9 M long |
| 22 | 33 KV Pin insulator polymeric type |
| 23 | 33 kV Stay rod 20x1800 mm |
| 24 | 33 KV Top channel 125x65x6mm- 3200mm |
| 25 | 33 KV Bracing angle 65x65x6mm- 4300mm |
| 26 | Dropper channel |
| 27 | ACSR dog conducotr |
| 28 | 33 KV Disc insulatorB&S type Polymeric 70KN |
| 29 | Disc fitting 70KN |
| 30 | Earthing rod 20x2500 mm and 6 SWG earthing wire |
| 31 | Stay wire 9(4MM)7/8 SWG |
| 32 | GI wire 5mm |
| 33 | 33 KV \"E\" bracket |
| 34 | GI pipe 6\" dia for cable hoisting |
| 35 | PG clamp for DOG conductor |
| 36 | Danger board 33 KV with clamp |
| 37 | M.S Channel 125x65x6mm |
| 38 | HDPE pipe 160mm OD PN-4 PE-80 grade UV stabilized as per IS:4984 |
| 39 | Number plate |
| 40 | GI barbed wire |
| 41 | Nut & bolts with washer |
| 42 | Cable holding clamp |
| 43 | Stone pad 300x300x75mm |
| 44 | Stay clamp |
| 45 | Earth wire clamp |
| 46 | Top channel Clamp |
| 47 | Bracing angle clamp |
| 48 | Dropper channel clamp |
| 49 | Allu. binding wire 6swg |
| 50 | Stay insulator for 7/8 swg stay wire 33 Kv porcelain type |
| 51 | Concreting of Stay rod 20x1800 mm as per RESPO norms |
| 52 | Grouting & concreting of 9M PCC pole along with plinthing/muffing as per RESPO norms |
| 53 | Cable route marker height*width =40\"x10\" and thikness=3\"\"NOMENCLATURE -33kV UNDERGROUND CABLE,DEPTH - ……METER\" |
| 54 | Digging & making of standard size cable trench by providing sand, bricks & saparate stone slab for each 33 Kv 3x300 sqmm XLPE cable (all required material like sand, bricks & stone slab etc will be provided by contractor) |
| 55 | Laying and dressing of 33 kV, 3x300 sqmm XLPE cable in the trench providing fine sand, cushion beneath and fine sand cushion above the cable. The cable shall be duly protected by bricks, sand & saparate stone slab, (all required material like sand, bricks & stone slab etc will be provided by contractor) |
| 56 | Hosting of 33KV 3x300sqmm XLPE cable with 6\" dia 3.5mtr long GI pipe on the double pole cable before mounting the cable on the double pole, lifting, mounting and clamping on the doubel pole structure and making connection. |
| 57 | Fixing & jointing of 33 Kv 3x300sqmm XLPE cable outdoor jointing kit after carefully removing the insulation of the cable duly plumbing and taping of cable providing, fixing and crimpling of proper size good quality lugs and complete work. |
| 58 | Fixing & jointing of 33 Kv 3x300sqmm XLPE cable straight through Jointing kit after carefully removing the insulation of the cable duly plumbing and taping of cable providing, fixing and crimpling of proper size good quality lugs and complete work. |
| 59 | Cartage charge of 33kV cable |
| 60 | Cartage charge of all material |
| 61 | SUPPLY OF MATERIALS FOR CONSTRUCTION OF NEW 33 KV LINE FOR 33/11 KV SUBSTATION GOPALAPUR FROM 132 KV MADIYAHU DIST. JAUNPUR. |
| 62 | X-Arm clamp for STP 11 mtr/PCC 9 Mtr |
| 63 | Top channel clamp for STP 11 mtr with N& B |
| 64 | Bracing angle clamp complete with N& B |
| 65 | Dropper angle clamp |
| 66 | Guarding angle clamp |
| 67 | 33 kV \"E\" bracket |
| 68 | F/T bracket with clamp for PCC |
| 69 | PG clamp for DOG conductor |
| 70 | HDPE pipe 160mm OD PN-4 PE-80 grade UV stabilized as per IS:4984 |
| 71 | Danger Board 33 kV with clamp |
| 72 | Number plate |
| 73 | GI Barbed wire |
| 74 | Nut & bolts with washer |
| 75 | Stone pad |
| 76 | GI pipe 6\"\" dia |
| 77 | Red oxide paint |
| 78 | Allu. Paint |
| 79 | Cable holding clamp |
| 80 | Stay clamp |
| 81 | MS angle 50x50x5mm for extention side/hieght bracket |
| 82 | MS channel 100x50x5mm for extention side/hieght bracket |
| 83 | Eye bolt |
| 84 | Stay insulator for 7/8 swg stay wire 33kv line porceline type |
| 85 | ERECTION OF CONSTRUCTION OF NEW 33 KV LINE FOR 33/11 KV SUBSTATION GOPALAPUR FROM 132 KV MADIYAHU DIST. JAUNPUR. |
| 86 | 33 kV lightening arrestor |
| 87 | Structure for L.A. |
| 88 | 33 kV line Isolator |
| 89 | Structure for line Isolator |
| 90 | PCC Pole 11 mtr long |
| 91 | ST Pole 11 mtr long |
| 92 | PCC pole 9mtr |
| 93 | ST Pole 13 mtr long |
| 94 | 33 kV V type X-Arm 100x50x6 mm, MS channel for STP 11mtr/PCC 9Mtr |
| 95 | ACSR DOG conductor (23Km x3+3%) |
| 96 | 33 kV Disc insulatorB&S type Polymeric |
| 97 | Disc fitting dog/racoon |
| 98 | 33 kV Pin insulator polymeric type |
| 99 | 33 kV Top channel 125x65x6mm- 3200mm long |
| 100 | 33 kV Bracing angle 65x65x6mm- 4300mm long |
| 101 | Stay wire 7/8 swg |
| 102 | Dropper channel |
| 103 | MS angle 65X65X6mm (for guarding angle 3.2mtr*50No*5.8/kg=928 kg) |
| 104 | Earthing rod 20X2540 mm |
| 105 | GI wire 5mm |
| 106 | GI wire 4mm |
| 107 | X-Arm clamp for STP 11 mtr/PCC 9 Mtr |
| 108 | Top channel clamp for STP 11 mtr with N& B |
| 109 | Bracing angle clamp complete with N& B |
| 110 | Dropper angle clamp |
| 111 | Guarding angle clamp |
| 112 | 33 kV \"E\" bracket |
| 113 | F/T bracket with clamp for PCC |
| 114 | PG clamp for DOG conductor |
| 115 | Danger Board 33 kV with clamp |
| 116 | Number plate |
| 117 | GI Barbed wire |
| 118 | Nut & bolts with washer |
| 119 | Stone pad |
| 120 | GI pipe 6\"\" dia |
| 121 | Red oxide paint as per RESPO norms |
| 122 | Allu. Paint as per RESPO norms |
| 123 | Cable holding clamp |
| 124 | Stay clamp |
| 125 | MS angle 50x50x5mm for extention side/hieght bracket |
| 126 | MS channel 100x50x5mm for extention side/hieght bracket |
| 127 | Eye bolt |
| 128 | Stay insulator for 7/8 swg stay wire 33kv line porceline type |
| 129 | Grouting & concreting of 11M ST pole along with plinthing/muffing as per RESPO norms |
| 130 | Grouting & concreting of 13M ST pole along with plinthing/muffing as per RESPO norms |
| 131 | Grouting & concreting of 11M PCC pole along with plinthing/muffing as per RESPO norms |
| 132 | Grouting & concreting of 9M PCC pole along with plinthing/muffing as per RESPO norms |
| 133 | Trimming of tree branches on the way of line |
| 134 | Concreting of Stay rod 20x1800 mm as per RESPO norms |
| 135 | Cable route marker height*width =40\"x10\" and thikness=3\"\"NOMENCLATURE -33kV UNDERGROUND CABLE,DEPTH - ……METER\" |
| 136 | Horizontal boring & laying of 160mm dia HDPE pipe below railway track after digging of pit by HDD method |
| 137 | Laying and dressing of U/G 33 kV, 3*300 sqmm XLPE cable with double circuit configuration below Railway track crossing into 160mm HDPE Pipe by Horizontal drilling method. The cable loop shall be duly protected by bricks, sand & saparate stone slab. (All required materials likes sand, bricks & stone slab etc. will be provided by contractor) |
| 138 | Digging & making of standard size cable trench by providing sand, bricks & saparate stone slab for each 33 kV 3*300 sqmm XLPE cable (All required materials like sands, bricks & stone slab etc will be provided by contractor) |
| 139 | Laying and dressing of 33 kV, 3*300 sqmm XLPE cable including loop wtih double circuit configuration in the trench providing fine sand, cushion beneath and fine sand cushion above the cable. The cable shall be duly protected by bricks, sand & saparate stone slab as per RESPO norms. (All required materials likes sand, bricks & stone slab etc. will be provided by contractor) |
| 140 | Fixing & jointing of 33 kV,3x300 sqmm XLPE cable Outdoor jointing kit after carefully removing the insulation of the cable duly plumbing and taping of cable providing, fixing and crimpling of proper size good quality lugs and complete work |
| 141 | Fixing & jointing of 33 kV,3x300 sqmm XLPE cable straight through jointing kit after carefully removing the insulation of the cable duly plumbing and taping of cable providing, fixing and crimpling of proper size good quality lugs and complete work |
| 142 | Hosting of 33 kV,3*300 sqmm XLPE cable with 6\"\" Dia, 3.5 mtr long GI Pipe on the double pole cable before mounting the cable on the double pole, lifting, mounting and clamping on the double pole structure and making connection |
| 143 | Cartage charge of Cable 3x300 sqmm |
| 144 | Cartage charge of all other material |
| 145 | SUPPLY OF MATERIALS FOR INCREASING CAPACITY OF 33/11KV SUBSTATION SUJABAD FROM (1X10) MVA TO (1X10+1X5) MVA, DIST-CHANDAULI |
| 146 | MS channel 100x50x6mm-3000mm long for fabrication of cable stand and neutral earthing stand for power T/F |
| 147 | MS flat 50*6mm for fabrication of cable stand and neutral earthing stand for power T/F |
| 148 | Fire fighting extinguisher (6kg) of sub station as per ISI specification including mounting on wall with the help of clamp |
| 149 | Fire bucket stand with 04 no. buckets (For switchgear/ control room & switchyard) |
| 150 | Rubber matt 2*1.5mtr, 3mm thick as per IS standard |
| 151 | Stone Pad 300x300x75 |
| 152 | Control cable 2x2.5 MM2 (Armored Cable) |
| 153 | Control cable 4x2.5 MM2 (Armored Cable) |
| 154 | Control cable 6x2.5 MM2 (Armored Cable) |
| 155 | Control cable 10x2.5 MM2 (Armored Cable) |
| 156 | Battery charger |
| 157 | Battery set 12Nos. X 2Volts, 200Ah with stand |
| 158 | GI pipe 6\" dia |
| 159 | E- bracket |
| 160 | Junction box (for control cable wiring) |
| 161 | Top channel clamp |
| 162 | Dropper angle clamp |
| 163 | Bracing angle clamp |
| 164 | Stay Clamp |
| 165 | Cable holding clamp |
| 166 | PG clamp for DOG conductor |
| 167 | 11kV Danger board & clamp with N&B |
| 168 | 11 kV Cable jointing kit 3x300 mm XLPE O/D |
| 169 | 11 kV Cable jointing kit 3x300 mm XLPE I/D |
| 170 | 11 kV Cable jointing kit 3x185 mm XLPE O/D |
| 171 | 11 kV Cable jointing kit 3x185 mm XLPE I/D |
| 172 | GI barbed wire |
| 173 | Clamp & connector for 33kV switchyard equipment |
| 174 | Break Down, Shut Down Roistaring name board 4 Nos. each |
| 175 | Stay insulator for 7/10 swg stay wire, 11 kV procelain type |
| 176 | Fuse set fixing clamp |
| 177 | Earth wire clamp |
| 178 | 11 kV TPMO with polymer insulator |
| 179 | Bolts & Nuts all Size |
| 180 | ERECTION OF INCREASING CAPACITY OF 33/11KV SUBSTATION SUJABAD FROM (1X10) MVA TO (1X10+1X5) MVA, DIST-CHANDAULI |
| 181 | Main bus bar complete with strucutre (Bus bar gantry, 24 No disc insulator & 06 No disc fitting B&S) |
| 182 | 33kV CT, 200/100/1-1-1A |
| 183 | 33 kV Bus isolator 800A |
| 184 | 33 kV L.A |
| 185 | 33 kV Post insulator |
| 186 | ACSR DOG conductor |
| 187 | PCC pole8.5mtr long |
| 188 | 90 lbs rail pices for T/F Plinth (44.64 Kg/Mtr.) |
| 189 | 8.5M PCC pole |
| 190 | MS Top channel (100*50*6mm-2240mm) |
| 191 | MS Bracing angle 65x65x6-2700 mm |
| 192 | Dropper channel (100*50**6mm-2028mm) |
| 193 | 11 kV Disc insulator polymer type 45 KN |
| 194 | 11 kV Disc fitting 45KN |
| 195 | 11 kV Pin insulator polymer type |
| 196 | Stay rod 16x1800mm |
| 197 | Stay wire 7/10 SWG |
| 198 | MS earthing rod 20x2500 mm |
| 199 | T/F Fresh Oil |
| 200 | 11 kV fuse set |
| 201 | Fire fighting extinguisher (6kg) of sub station as per ISI specification including mounting on wall with the help of clamp |
| 202 | Fire bucket stand with 04 no. buckets (For switchgear/ control room & switchyard) |
| 203 | Rubber matt 2*1.5mtr, 3mm thick as per IS standard |
| 204 | Stone Pad 300x300x75 |
| 205 | Control cable 2x2.5 MM2 (Armored Cable) |
| 206 | Control cable 4x2.5 MM2 (Armored Cable) |
| 207 | Control cable 6x2.5 MM2 (Armored Cable) |
| 208 | Control cable 10x2.5 MM2 (Armored Cable) |
| 209 | Battery charger |
| 210 | Battery set 12Nos. X 2Volts, 200Ah with stand |
| 211 | GI pipe 6\" dia |
| 212 | E- bracket |
| 213 | Junction box (for control cable wiring) |
| 214 | Top channel clamp |
| 215 | Dropper angle clamp |
| 216 | Bracing angle clamp |
| 217 | Stay Clamp |
| 218 | Cable holding clamp |
| 219 | PG clamp for DOG conductor |
| 220 | 11kV Danger board & clamp with N&B |
| 221 | GI barbed wire |
| 222 | Clamp & connector for 33kV switchyard equipment |
| 223 | Break Down, Shut Down Roistaring name board 4 Nos. each |
| 224 | Stay insulator for 7/10 swg stay wire, 11 kV procelain type |
| 225 | Fuse set fixing clamp |
| 226 | Earth wire clamp |
| 227 | 11 kV TPMO with polymer insulator |
| 228 | Bolts & Nuts all Size |
| 229 | Earthing of S/s outdoor equipments as per RESPO norms Laying of earth mat in the switchyard by laying of MS round of 32 mm dia in 1000mm deep trenches with MS round 32 mm dia, 3 mtr long earth electrodes as per RESPO norms. The work includes welding of the MS round, conneting all steel structures in the switchyard with the earth mat by means of GI strips of size 50x6mm as per item below. (All required materials will be provided by contractor) (A) Excavation of earth for laying mat |
| 230 | (B) Driving of earth electrode (32mm dia, 3 mtr long) |
| 231 | (C) Laying of earth mat (MS) bar including cutting, shaping and binding etc. |
| 232 | (D) Preparation of joints, proper making and welding of main earth mat bar joints and applying bitumen impregnated on joints i.e. end joints, cross joints and lap joints |
| 233 | (E) Welding of riser strip with earth mat and department structure body (One set means one riser strip welding to main equipments.) |
| 234 | Earthing of S/s for indoor equipments as per RESPO normsBy way of boring and lowering \"B\" class GI pipe 2\"\" dia, - 3no*20 mtr deep (02 no for both side of switchgear room in delta connection earthing and making earthing pit for each) by providing all materials like \"B\" class GI pipe 2\"\" dia, 50*6mm GI strip, socket, sand, charcoal, bricks, cement etc.(All required materials will be provided by contractor) |
| 235 | Plinth & foundation for T/FConstruction of plinth of size 4.50*3.50 Mtr for 5 MVA T/F. (All required materials for civil work like sands, bricks, cement, MS bars, stone grits etc. will be provided by contractor) |
| 236 | Plinth & foundation for 33 kV VCB(Construction of plinth of standard size suitable for erection of upper structure for 33 kV VCB including grouting of anchor bolts in proper alignment and level. (All required materials for civil work like sands, bricks, cement, MS bars, stone grits etc. will be provided by contractor) |
| 237 | Digging & Making of standard size Pakka cable trench by providing cement, sand, bricks & C.C. trench cover for laying of various size of control cable (All required materials like cements, sands, bricks & C.C. trench cover etc will be provided by contractor) |
| 238 | FABRICATION OF TRANSFORMER SEPARATE EARTHING T/F NEUTRAL EARTHING(A) Seprate earthing of power T/F by way of boring and lowering GI pipe 2\"\" dia, - 5no*20 mtr deep (02 no for T/F body earthing and 01 no for T/F neutral in delta connection earthing and making earthing pit for each) by providing all materials like GI pipe 2\"\" dia, 50*6mm GI strip, socket, sand, bricks, cement etc.(All required materials will be provided by contractor)(B) Fabrication and grouting of M.S Channel 100*50*6mm in L- shape with 50*6mm GI strip & in proper size and alignment to provide support for power transformer neutral |
| 239 | Fabrication and erection of cable support made of two pieces of M.S channel 100x50mm,3.0 mtr long joined to each other by means of 5 nos M.S Flat 50x6mm places each by welding at equal intervals and grouting in a block of standard size complete (All required materials will be provided by contractor) |
| 240 | INSTALLATION& CHARGING OF 11kV SWITCHGEARS & CONTROL PANEL IN CONTROL ROOM:- A) Shifting carefully & safely 11kV I/C, O/G & bus coupler switchgear from outside of the switchgear room as per direction of Engineer in charge-04 Nos., (B) Fixing and making bus bar connections in between all switchgears-01 Nos & (C) Shifting carefully & installation of 33 kV single circuit transformer control panel in control room-01 No.(All required materials will be provided by contractor) |
| 241 | FABRICATION, ERECTION & GROUTING OF S/s STRUCTURE:- (A) Fabrication of bus isolatorstructures-01 No., (B) Fabrication of Lightening Arrestor/CT structure-02 No. & (C) Fabrication of Post structure-01 No. |
| 242 | Grouting & concreting along with plinthing and muffing of PCC pole by providing sand, cement, grit and bricks as per norms (Sand, cement, grit and bricks will be provided by contrator) |
| 243 | Concreting of stay by providing sand, cement, grit and bricks as pernorms (Sand, cement, grit and bricks will be provided by contrator) |
| 244 | Digging & Making of standard size Pakka cable trench deep by providing cement, sand, bricks & C.C. trench cover for laying of 11 kV 3x300 sqmm XLPE cable from both 5MVA Transformer (All required materials like cements, sands, bricks & C.C. trench cover etc will be provided by contractor) |
| 245 | Laying & dressing of 11 kV, 3*300 sqmm underground cable from 5MVA T/F to 11 kV incoming switchgear in the Pakka trench providing fine sand, cushion beneath and fine sand cushion above the cable. The cable shall be duly protected by bricks, sand & saparate stone slab. (All required materials likes sand, bricks & stone slab etc. will be provided by contractor) |
| 246 | Digging & making of standard size cable trench by providing sand, bricks & saparate stone slab for each 11 kV 3x185 sqmm XLPE cable (All required materials like sands, bricks & stone slab etc will be provided by contractor) |
| 247 | Laying & dressing of 11 kV,3*185 sqmm underground cable in the trench providing fine sand, cushion beneath and fine sand cushion above the cable. The cable shall be duly protected by Ist class bricks, sand & saparate stone slab. (All required materials likes sand, bricks & stone slab etc. will be provided by contractor) |
| 248 | Fixing & jointing of 11 kV,3x300 sqmm XLPE cable Outdoor jointing kit after carefully removing the insulation of the cable duly plumbing and taping of cable providing, fixing and crimpling of proper size good quality lugs and complete work |
| 249 | Fixing & jointing of 11 kV,3x300 sqmm XLPE cable Indoor jointing kits on switchgears after carefully removing the insulation of the cable, duly plumbing and taping of cable providing,fixing and crimpling of proper size good quality lugs, duly plumbing and taping of cable properly fixing of lugs on switchgears and boxes complete work |
| 250 | Fixing & jointing of 11 Kv 3x185 sqmm XLPE cable Outdoor jointing kit after carefully removing the insulation of the cable duly plumbing and taping of cable providing, fixing and crimpling of proper size good quality lugs and complete work |
| 251 | Fixing & jointing of 11 kV,3x185 sqmm XLPE cable Indoor jointing kits on switchgears after carefully removing the insulation of the cable, duly plumbing and taping of cable providing, fixing and crimpling of proper size good quality lugs, duly plumbing and taping of cable properly fixing of lugs on switchgears and boxes complete |
| 252 | Hosting of 11 kV,3*185 sqmmXLPE cable with 100 mm Dia, 3.5 mtr long GI Pipe on the outgoing feeder cable before mounting the cable on the double pole, lifting, mounting and clamping of 11 kV feeder cable boxes on the feeder double pole structure and making connection |
| 253 | Hosting of 11 kV 3*185 sqmm XLPE cable to 11 outgoing feeder switchgear, 11/0.4 kV T/F & 11 kV 3*300 sqmm XLPE cable from 33/11 kV T/F to 11 kV Incommer switchgears |
| 254 | Transformer repairing work in case of providing old & used T/F (repairing work of T/F like changing Gasket, changing O ring of T/F busing, stopping oil leakage etc.) |
| 255 | Painting of all structure, earthing strip, neutral strip stand & T/F cable stand etc. with Alluminium paint & Red Oxide Paint (All required materials like red oxide, alluminium paints will be provided by contractor) |
| 256 | Transformer Cleaning and painting work (T/F body Colour) |
| 257 | Miscllaneous Work (Soil filling & Leveling, Dismental & erection of boundery wall etc.) |
| 258 | Erection of 33/11 Kv 5MVA Power T/F including mounting of T/F on plinth in safe position, fixing of radiator, conservator tank, top up of T/F oil and commissioning of all accecassaris. |
| 259 | Cartagecharges of all other material |
| 260 | SUPPLY OF MATERIALS FOR CONSTRUCTION OF 11 KV LINE FROM 33/11 KV SUBSTATION SUJABAD, DIST-CHANDAULI. |
| 261 | Cross arm clamp |
| 262 | Top channel clamp |
| 263 | Dropper channel clamp |
| 264 | Bracing Angle clamp |
| 265 | 11KV \"E\" bracket with nut & bolt |
| 266 | 11KV \"F/T\" bracket |
| 267 | M.S angle 65x65x6mm for fabracation of Side X-arm as per site requirement (15 Nos) |
| 268 | Guard angle clamp |
| 269 | Stay Clamp |
| 270 | Stay Insulator |
| 271 | T-off Clamp |
| 272 | G.I. Barbed wire |
| 273 | Nut, Bolt & Washer |
| 274 | Red oxide paint |
| 275 | Allu. Paint |
| 276 | Stone Pad |
| 277 | PG clamp |
| 278 | Danger board & clamp with nut & bolt |
| 279 | GI pipe 100 mm dia |
| 280 | Cable Holding clamp |
| 281 | ERECTION OF CONSTRUCTION OF 11 KV LINE FROM 33/11 KV SUBSTATION SUJABAD, DIST-CHANDAULI. |
| 282 | 11M ST pole long |
| 283 | 11M PCC pole long |
| 284 | 8.5M PCC pole long |
| 285 | ACSR Weasel conductor |
| 286 | 11 Kv \"V\" type X-arm |
| 287 | 11 Kv top channel 100x50x6-2240 mm |
| 288 | MS dropper channel 100x50x2600mm |
| 289 | 11 Kv MS iron bracing angle 65x65x6-2700 mm with 4 no clamp |
| 290 | 11 Kv stay set 16x1800mm |
| 291 | Stay wire 7/10 SWG |
| 292 | Earthing rod 20x2500 mm |
| 293 | 11 Kv disc insulator 45 KN Polymer type |
| 294 | 11 Kv disc fitting 45 KN Polymer type |
| 295 | 11 Kv pin insulator Polymer type |
| 296 | Guarding angle 65x65x6mm |
| 297 | T-off Channel |
| 298 | G.I wire 4mm |
| 299 | G.I wire 5mm |
| 300 | Cross arm clamp |
| 301 | Top channel clamp |
| 302 | Dropper channel clamp |
| 303 | Bracing Angle clamp |
| 304 | 11KV \"E\" bracket with nut & bolt |
| 305 | 11KV \"F/T\" bracket |
| 306 | M.S angle 65x65x6mm for fabracation of Side X-arm as per site requirement (15 Nos) |
| 307 | Guard angle clamp |
| 308 | Stay Clamp |
| 309 | Stay Insulator |
| 310 | T-off Clamp |
| 311 | G.I. Barbed wire |
| 312 | Nut, Bolt & Washer |
| 313 | Red oxide paint |
| 314 | Allu. Paint |
| 315 | Stone Pad |
| 316 | PG clamp |
| 317 | Danger board & clamp with nut & bolt |
| 318 | GI pipe 100 mm dia |
| 319 | Cable Holding clamp |
| 320 | Grouting and concreting of 11M ST pole along with plinthing and muffing as per RESPO norms |
| 321 | Grouting and concreting of 11M PCC pole along with plinthing and muffing as per RESPO norms |
| 322 | Grouting and concreting of 8.5M PCC pole along with plinthing and muffing as per RESPO norms |
| 323 | Concreting of Stay rod 20x1800 mm as per RESPO norms |
| 324 | Digging & making of standard size cable trench by providing sand, bricks & saparate stone slab for each 11 kV 3*185 sqmm XLPE cable (All required materials like sands, bricks & stone slab etc will be provided by contractor) |
| 325 | Laying and dressing of 11 kV, 3*185 sqmm XLPE cable in the trench providing fine sand, cushion beneath and fine sand cushion above the cable. The cable shall be duly protected by bricks, sand & saparate stone slab. (All required materials likes sand, bricks & stone slab etc. will be provided by contractor) |
| 326 | Fixing & jointing of 11 Kv 3x185 sqmm XLPE cable Outdoor jointing kit after carefully removing the insulation of the cable duly plumbing and taping of cable providing, fixing and crimpling of proper size good quality lugs and complete work (All required materialswill be provided by contractor) |
| 327 | Fixing & jointing of 11 Kv 3x185 sqmm XLPE cable straight through jointing kit after carefully removing the insulation of the cable duly plumbing and taping of cable providing, fixing and crimpling of proper size good quality lugs and complete work (All required materialswill be provided by contractor) |
| 328 | Hosting of 11 kV,3*185 sqmmXLPE cable with 100 mm Dia, 3.5 mtr long GI Pipe on the double pole cable before mounting the cable on the double pole, lifting, mounting and clamping of 11 kV cable boxes on the double pole structure and making connection |
| 329 | Cable route marker height*width =40\"x10\" and thikness=3\" \"NOMENCLATURE -33kV UNDERGROUND CABLE, DEPTH - ……METER\" |
| 330 | Tree branch cutting |
| 331 | Cartage charges of 11 kv 3x185 Sqmm XLPE cable |
| 332 | Cartage charges of all other material |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender