|
| 1 | BM 50mm Thick Using Mini Hot Mix Plant - ProvidingandLaying50mmthickBituminousMacadamusingcourseaggregateandVG30 bitumenwhichshallconsistofconstructioninasinglecoursebase/bindercourse confirmingtothespecficationonapreviouslypreparedbase,(usingMiniHotMixPlantand PowerRoller)includingcostofmaterial,labourcharges,rentalsformachinery,fuelandall otherincidentalchargesetc.,completeasperclause 504MORTHRev-5(ForPatchWorks) (MORTH No. 111, 112, 504, 900) |
| 2 | Road A |
| 3 | Advance Patch work using 45mm IRC size HBG metal for making thepot holesand patching usingVG10 grade bitumen including mixing atthe rate of 44 Kg / Cum of chips after trimming the pot holes or depression to proper shape and depth side painting with tack coat and compacting the layers as directed by Departmental officers etc.,complete, as per MORTH Specification. |
| 4 | Road B |
| 5 | Tack Coat Over Existing BT Surface - ProvidingandlayingTackCoatOverExistingBTsurfaceusing2KgofBitumen Emulsion(RS1)per10sqmforpreparatorytoanotherbituminousconstruction overitincludingcostofmaterial,labourcharges,rentalsformachinery,fueland all other incidental charges etc., complete as perClause 503 of MORTH Rev-5e asper Clause 503 of MORTH Rev (MORTH No. 111,112,501, 503,900) |
| 6 | Road A |
| 7 | Road B |
| 8 | BC 30/40mm Thick (Grade-II) Using VG30 Bitumen -ProvidingandlayingBituminousConcreteto30/40mmthickusing0.13cumof19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heatingthebitumenandaggregatetorequiredtemperatureandmixingtheminrequired temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paversite,spreadingthemixtouniformthicknessof40mmwithmechanicalpavertothe specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler,tipper trucks, Paver Finisher, Vibratory roller andallothertoolsandplantrequired,includingfuelandallotherincidentalchargesetc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 - Grade - II. (MORTH No. 111, 112, 501, 507, 900) |
| 9 | Road A |
| 10 | Road B |
| 11 | EARTH WORK FOR BERMS INCL. COMPACTION - Earthworkexcavationinallclassesofsoilsexcepthardrockrequiringblastingand depositingonbankwithallleadsandliftsasperSS20Bincludingcostofalllabour charges,materials,tools,equipmentsandallincidentalcharges,includingcompacting with power roller, watering, including all hire and fuel charges for all tools and plants, removalofotherdeleteriousmatterandobstructions,trimmingofbottomofexcavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For making up of low berms with conveyance. Lead for Carted Earth: 1 Km (MORTH No. 111, 112, 301, 305, 900) |
| 12 | Road A |
| 13 | Road B |
| 14 | Calculation of SubTotal, GST and Total Amount carried out by system automatically |
| 15 | Basic cost of value put to tender as per estimate |
| 16 | Add GST at 18% |
| 17 | Total Value put to Tender |
| 18 | Differnce Amount (Excess/Less) |
| 19 | Quoted Amount (Basic Rate Only) |
| 20 | Add GST at 18% of of Quoted Amount |
| 21 | Total Value of Quoted Amount Including 18% of GST |
| 22 | Basic cost of value put to tender as per Estimate |
| 23 | Quoted Rate in Figures (Total Value of Contract Including 18% of GST ) |