| 1 | Earth work in excavation in foundationin hard with initial leads and lifts including dressing and leveling the bed and depositing the excavated earth at places away from work site with all leads and lifts including cost of all labour and T&P and dewatering if required for the work etc. complete |
| 2 | (a) Godown |
| 3 | (b) Office |
| 4 | Filling foundation and plinth with sand wellwatered & rammed with cost, conveyance,royality,taxes etc. complete. |
| 5 | (a) Godown |
| 6 | (b) Office |
| 7 | Filling foundation and plinth with excavated materials and wellwatered & rammed with cost, conveyance,royality,taxes etc. complete. |
| 8 | (a) Godown |
| 9 | (b) Office |
| 10 | Cementconcrete(1:3:6) with 4mm size hard granite metal including cost, conveyance, royality, taxes, watering and curing etc. complete. |
| 11 | (a) Godown |
| 12 | (b) Office |
| 13 | Brick work with Fly Ash, bricks in F&P having crusing strength between 75kg/cm2 in cement motar (1:6) with cost, conveyance, royalty, watering & curing etc. complete. |
| 14 | (a) Godown |
| 15 | (b) Office |
| 16 | R.C.C. work with M-20 Grade with 20mm and down graded b.h.c.b.g. chips including hoisting and laying. |
| 17 | (a) Columns base |
| 18 | Godown |
| 19 | Office |
| 20 | (b) Grade Beam |
| 21 | Godown |
| 22 | (c) Plinth Beam |
| 23 | Godown |
| 24 | Office |
| 25 | (d) Column in superstructure |
| 26 | Upto 3 Mtr Height |
| 27 | Godown |
| 28 | Office |
| 29 | Above 3 Mtr Height |
| 30 | Godown |
| 31 | (e) Lintel band |
| 32 | Upto 3 Mtr Height |
| 33 | Godown |
| 34 | Office |
| 35 | (f) Wall band |
| 36 | Upto 3 Mtr Height |
| 37 | Office |
| 38 | Above 3 Mtr Height |
| 39 | Godown |
| 40 | (g) Chajja |
| 41 | Office |
| 42 | (h) Slab |
| 43 | Office |
| 44 | Supplying, fitting and placing uncoated HYSD bar reinforcement complete as per drawing and technical specification |
| 45 | (a) Gread beam |
| 46 | Godown |
| 47 | (b) Column Footing (base) |
| 48 | Godown |
| 49 | Office |
| 50 | (c) Column in Superstructure |
| 51 | Godown |
| 52 | Office |
| 53 | (d) Plinth band |
| 54 | Godown |
| 55 | Office |
| 56 | (e) Lintel band |
| 57 | Godown |
| 58 | Office |
| 59 | (f) Chajja |
| 60 | Office |
| 61 | (g) Slab |
| 62 | Office |
| 63 | (h) Wall Beam |
| 64 | Godown |
| 65 | Office |
| 66 | Cementconcrete(1:2:4) with 12mm size hard granite chips including cost, conveyance, royality, taxes, watering and curing etc. complete. |
| 67 | Godown |
| 68 | Providing & laying 20mm grading plaster in CM (1:4) with water proof cement compound with curing including curing and cost, conveyance of all material and labour etc. complete as per the direction of EIC. |
| 69 | Office |
| 70 | Fly brick masonry C.M. (1:6) in superstructure with splay cutting circular moulding etc. including cost, conveyance of all material and labour etc. complete as per the direction of EIC. |
| 71 | (a) Upto 3 Mtr Height |
| 72 | Godown |
| 73 | Office |
| 74 | (b) Above 3 Mtr Height |
| 75 | Godown |
| 76 | 12 m.m thick cement plaster (1:6) over brick work with cost of all materials and all labour etc |
| 77 | (a) Upto 3 Mtr Height |
| 78 | Godown |
| 79 | Office |
| 80 | (b) Above 3 Mtr Height |
| 81 | Godown |
| 82 | 16 m.m thick cement plaster (1:6) over brick work with cost of all materials and all labour etc |
| 83 | (a) Upto 3 Mtr Height |
| 84 | Godown |
| 85 | Office |
| 86 | (b) Above 3 Mtr Height |
| 87 | Godown |
| 88 | Supplying, fitting& fixing of MS shutter of approved design made out of MS angle and sheet of approved specification including cost conveyance of all material etc complete as per the direction of EIC |
| 89 | Godown |
| 90 | Supplying, fitting& fixingof steel ventilator glazed composite with MS grill outside iron frame with glass pairs including putty & wire clips, screw & nails andcost & convaynce of materialsetc.Complete. |
| 91 | Godown |
| 92 | Supplying, fabrication, fitting, fixing& errection of MS tubular Truss & purline including allcost & convaynce of materialsetc.Complete. MS Square Tubular Trusse (100mm x 100mm x 6.3MM size) |
| 93 | Godown |
| 94 | Manufacturing, Supplying (50mmx100mmx50mm) 5mm thick C-Chhanel, purlin, runner and fender to plinth band (Angular) including fabrication, fitting, fixingin position including allcost & convaynce of materialsetc.Complete. |
| 95 | Godown |
| 96 | Painting 2 coats over a coat of primer including cost of paints, labour & sundries etc. complete. |
| 97 | Godown |
| 98 | Office |
| 99 | Supplying fitting & fixing of anticorrossive zinc aluminium alloy painted coloured steel roofingProfile sheetof 1000mm width & total coated thickness 0.45mm in roof including fixing of ridge cap with fasteners of approved specifications etc complete but excluding cost of fasteners including drilling hole in wind ties including fixing of ridges valleys, wind ties etc. complete including cost ofsheet& allfitting (per 1 Sq. Mtr.) |
| 100 | Godown |
| 101 | Supplying, fiting & fixing of holding down bolts (600mmx20mm) & base plates of 8mm thickness including allcost & convaynce of materialsetc.Complete. |
| 102 | Godown |
| 103 | Finishing walls with two coats of water proofing cement paint of approved shade on new work to give an even shade. |
| 104 | (a) Upto 3 Mtr Height |
| 105 | Godown |
| 106 | Office |
| 107 | (b) Above 3 Mtr Height |
| 108 | Godown |
| 109 | Distempering two coats to walls with distemper of approved shade on new work to give an even shade enculding cost of distemper |
| 110 | Office |
| 111 | Wall painting 2 coats with weather coat of approved shade on old work to give an even shade. |
| 112 | (a) Upto 3 Mtr Height |
| 113 | Godown |
| 114 | Office |
| 115 | (b) Above 3 Mtr Height |
| 116 | Godown |
| 117 | Antitermite treatment in foundation trenches, flooring with approved chemicals including the cost of Material & labour charges |
| 118 | Godown |
| 119 | Labour charges for fixing of glass strips of depth 0.05M in joints in floor including cost of glass strips. |
| 120 | Godown |
| 121 | Supplying, fitting and fixing vetrifed tile in floors of size 600mm x 600mm of approved make confirming to IS: 13755 with application of polymer modified quick set cement based water resistant adhesive confirming to IS: 15477 of 3mm thick bed and filling joints with white cement of approved quality including cost of all material, Labour, T&P required for the work all complete as per direction of Engineer-in-Charge. |
| 122 | Office |
| 123 | Supplying, fitting & fixingofglazed tiles of size 300x300 mm approved make confirming to IS:13755 laid on floors, treads or steps and landing on 20 mm thick bed of cement mortar 1:1 (1 cement: 1 sand) jointed with white cementincluding rubing and polishing with cost,coveyance of all materials etc. complete. |
| 124 | Office |
| 125 | Supplying, fitting & fixing glazed wall tiles of size 200x300 mm in wall, dadoo, skirtingand rises of steps on 25 mm thickcement plaster in mortar 1:1 (1 cement: 1 sand) jointed with neat cement slury mixed with pigment to match the shades of the tiles including rubing and polishing with cost,coveyance of all materials etc. complete. |
| 126 | Office |
| 127 | Supplying, fitting and fixing of bath room fiber door of approved make including fiber chukath with all GI fittingsincluding cost, conveyance, taxes of all materials, labour, T & P etc required for the work complete in all respect. |
| 128 | Office |
| 129 | Manufacturing, supplying and labour charges for fitting& fixingin position of M.S. Grill, Door, Window & as per approved design with one coat of anticorasive painting and making good to the damages of walls or RCC or other stracturals complete including mending or cutting sizes or groves with cost & conveyance of all material and labour with T&P required for the work, taxes and roylties etc complete as per the direaction of EIC. |
| 130 | Office |
| 131 | Cost, Supplying, fitting and fixing of pre-cast concrete ventilators of size 0.38x0.25 M including all taxes and labour, T & P etc required for the work complete in all respect. |
| 132 | Office |