| 1 | Conducting Geo-Physical survey including conveyance the instrument etc., complete(As per Tward Seculd) ( DD 05.05.2023) |
| 2 | Drilling of150mm dia vertical bore well upto the recommended depth etc., complete(Hard rock) |
| 3 | Supply and inserting of6 Ksc PVC casing pipe etc., complete |
| 4 | Earth work excavation and depositing on bank with initial of 10m and lift of 2.00m in Hard stiff clay, Stiff Black Cotton soil, Hard red earth, Shales, Murrams and earth mixed with small size boulders etc. as per SS 20 B |
| 5 | Plain Cement Concrete 1:4:8 (one cement for sand and eight aggregate) using 40 mmHBS for foundation including the cost of mixing concrete, ramming, curing etc., complete and as directed by Officers etc., complete |
| 6 | Brick work in CM 1:5 (one cement five sand) 12mm thick over brick work including finishing curing etc. and as directed by departmental officers etc., complete |
| 7 | Plastering with CM 1:5 (one cement and five sand) 12mm thick over brick work including finishing curing etc., and as directed by departmental officers etc., complete |
| 8 | Supply and delivery and fixing of HDPE tank including loading and unloading, transportation fixing and necessary GI pipe and specials for pipe connection works including cutting, threading and fixing charges as directed by departmental officers etc., complete |
| 9 | Supply and delivery ofGI & PVC specials confirming to ISI Specifications 50mm MS clamp set WD- M0617 |
| 10 | Supply and delivery of MS Kiosk of size 0.75 x 0.45 x 0.75 for fixing or meter board, switch board with MS door and lock and key arrangements |
| 11 | Supply and delivery of Three-phase pump set with motor as per ISI 50 lpm x 40 head with out panel board consist of following.Submersible Pump(WD-M1614) |
| 12 | Supply and delivery of Three-phase panel board with 2 level guard and auto start (5 HP Panel Board) |
| 13 | Supply and delivery of50mm UPVC - Column pipe including all labour charges |
| 14 | Supply and delivery of PVC Insulated and Sheathed 3 core flat type 4 sq.mm copper cable conforming to IS 694/1990 |
| 15 | 50mm GI clamp set |
| 16 | 50mm PVC Pipe |
| 17 | 50mm PVC Coupling |
| 18 | 50mm PVC Elbow |
| 19 | 150 mm bore cover |
| 20 | 50mm GM Gate valve |
| 21 | 50 mm GI flangh set |
| 22 | 50mm Elbow |
| 23 | 50mm NAV |
| 24 | 25mm GI service pipe |
| 25 | 7/20 copper wire for service connection |
| 26 | 16 amps main switch |
| 27 | 20mm CI Tap |
| 28 | 20mm GI Pipe nipple |
| 29 | 20mm GIcoupling |
| 30 | Nylon rope for Bore wWell |
| 31 | Earthwork excavation above water level in light or sandy soil for infiltration gallery, syphon or connecting pipeline and connected works including refilling complete. 50 MMPVC Pipe |
| 32 | Laying and Joining of Supplied PVC and GI Pipes 50 MMPVC Pipe |
| 33 | REFILLING of PVC PIPES50 MMPVC Pipe |
| 34 | Labour charges for erection of pump set in the deep bore well including connection of submersible cable etc. |
| 35 | Labour charges for tap connection and inter connection etc., including cutting of GI pipes fixing of specials etc., complete |
| 36 | Internal wiring with copper insulated wire through conduct pipes, with necessary switches, distribution boxes with bulkhead fittings and bulbs. |
| 37 | Earthing as per EB rules including cost of civil works such as construction of earth pit earth electrodes, GI wire, etc., |
| 38 | E B Service charges etc., completed |