Tender For Sabarimala Devaswom Mm Festivals In 1201Me Annual Overhauling Repairs Maintenance Reconditioning And Supply Of Spares For Boilers Installed At Sabarimala Reg-- 1 SUPPLY OF SS BALL VALVE 50 NB 2 SUPPLY OF SS Y STRAINER 50 NB S/E 3 SUPPLY OF SPARE KIT FOR PRESSURE REDUCING VALVE (DARLING MUESCO) 4 Supply of PRESSURE REDUCING VALVE 25 NB 5 Supply of SPIDER RRL 100 6 Supply of SPIDER LO75 7 Supply of BEARING 6205 8 Supply of SIGHT GLASS 9 Supply of ELECTODE CAP 10 Supply of THERMIC FLUID 11 Supply of BLOWDOWN VALNE 20 NB 12 Supply of BLOWDOWN VALNE 25 NB 13 Supply of LIMIT SWITCH 14 Supply of SAFETY VALVE 40 NB 15 Supply of SAFETY VALVE 25 NB 16 Supply of OVER LOAD REALY (OLR) 17 Supply of CONTACTOR 12 A 18 Supply of COIL FOR RXA 06/05 19 Supply of PRESSURE SWITCH PM 01 20 Supply of PRESSURE SWITCH PVF 16 21 Supply of MULTI PORT VALVE FOR FILTER SIDE MOUNTED 40 NB 22 Supply of MULTI PORT VALVE FOR SOFTNER SIDE MOUNTED 40 NB 23 Supply of STRAINER BUTTON 24 Supply of RESIN 25 Supply of STEAM BALL VALVE 25 NB 26 Supply of MOTOR 3 PH 1.5 HP 2480 RPM 27 Supply of MOTOR 3 PH 0 940 RPM.5 HP 28 Supply of METALIC BRAIDED HOSE 1 X 1.2 M 29 Supply of METALLIC BRIADED HOSE 1/2 X 20 30 Supply of TH T CABLE 31 Supply of TRANSFORMER 14.5 KVA 32 Supply of PHOTORESISTOR 8205 33 Supply of BEARING 34 Supply of GASKET SET 35 Supply of GLAND PACKING 36 Supply of OIL SEAL T3 37 Supply of SHAFT FOR TF PUMP 38 Supply of SHAFT PROTATION SLEEVE FOR TF PUMP 39 Supply of SPLIT BEARING SET OF 2 40 Supply of OIL SEAL T2 41 Supply of OIL SEAL T1 42 Supply of CIRCLIP 43 Supply of GUDGEON PIN 44 Supply of CONNECTING ROD FOR TRIPLUX PUMP 45 Supply of OIL RING FOR WATER PUMP 46 Supply of GLAND NUT FOR WATER PUMP 47 Supply of PISTON FOR TRIPLUX PUMP 48 Supply of CRANK SHAFT FOR TRIPLUX PUMP 49 Supply of STEAM BALL VALVE WITH SS BALL AND STEAM FORGED STEEL BOADY PTFE SEAT 20 NB 50 Supply of STEAM BALL VALVE WITH SS BALL AND STEAM FORGED STEEL BOADY PTFE SEAT 25 NB 51 Supply of OPTIMISER RX A 05 52 Supply of OPTIMISER RXD 850 53 Supply of OPTIMISER SX 850 54 Supply of COIL FOR SX 850 55 Supply of V BELT A 61 56 Supply of V BELT A 42 57 Supply of V BELT A 53 58 SUPPLY OF V BELT A 44 59 SUPPLY OF VALVE SEAT ASSEMBLY 60 SUPPLY OF SEQUENCE CONTROLLER LMO 61 SUPPLY OF SEQUENCE CONTROLLER MA 810 62 SUPPLY OF WATER PUMP TRIPLEX 63 SUPPLY OF PHOTOCELL QRB 1 64 SUPPLY OF NOZZLE 3.5 GPH 45 DEG HO MONARC 65 SUPPLY OF NOZZLE 9.5 GPH, 60 DEG HO, MONARCH 66 SUPPLY OF NOZZLE 6.5 GPH, 45 DEG HO, MONARCH 67 SUPPLY OF NOZZLE 5.5 GPH, 45 DEG HO, MONARCH 68 SUPPLY OF METALLIC BRIADED HOSE 3/8*40 69 SUPPLY OF GLAND WASHER 70 SUPPLY OF FUEL PUMP AJ6 71 SUPPLY OF DIGITEL TEMPERATURE CONTROLLER (DTC) 0 - 400 C -513 72 SUPPLY OF CONTACTOR 32 A /230 V COIL 73 SUPPLY OF CONTACTOR 9 A /230 V COIL 74 SUPPLY OF COUPLING L075 75 Boiler overhauling and reconditioning worksOverhauling & reconditioning of 400000 Kcal/hr Thermax Make Thermic FluidBoiler at Appapura for appom preparation.a) Reconditioning of thermic fluid generator TP-04 including cleaning of coil by using suitable wire brush and wiping the surface with cotton waste, combustion chamber, checking of top and bottom refractory, blower assembly, burner assembly like diffuser plate, electrode assembly, nozzle, photocell mountings, sight glass etc.and reassembling the coil with new standard high quality gaskets and packing.b) Cleaning the diesel tank, fuel line filters, strainers, fuel pump valves and providing proper packing to the valve, NRV, strainers and ensuring trouble free operation.c) Thermic fluid system - cleaning of thermic fluid pipeline falnges and cleaning and re-setting of SLSV, NRV, valves, etc. repairing and re-conditioning of damaged pipeline parts and fittings, providing proper gland packing for valves with fitting arrangement etc. and ensuring leak proof trouble free operation of thermic fluid heater.d) Repair and reconditioning of control panel of boiler ensuring perfect and trouble free operation of all switch gears , control gears and parts like MCBs, contactors,switches, OLRs, visual and alarm monitors, sequence controller, temperature controller, photocell, pressure switch, solenoid, motors, transformer, interconnecting cable etc. and keep the system ready for smooth operation.e) Rectification of minor fluid leaks and pipelines and karas.f) Painting of boiler such as panel board etc. 76 Overhauling & reconditioning of 850 Kg/hr Thermax make Steam Boiler installed atAravana plant for aravana preparation.a) Dismantling, cleaning and reconditioning of steam boiler 850 Kg/hr, cleaning of coil using suitable wire brush and wiping the surface with cotton waste, combustion chamber, checking of top and bottom refractory, blower assembly, burner assembly,electrode assembly, nozzle, photocell mountings, sight glass etc. and reassembling the unit with high quality packings.b) Cleaning the water line, water tank, strainers, valves, optimizer, economizer tube, chamber and providing high quality gland packings, gaskets, etc.c) Descaling of coil and pipe line using 5% - 10% descaling chemicals or other type of harmless cleaning media of duration of 12 hr and ensuring the boiler water system of leak proof trouble free and smooth operation during festival season.d) Overhauling and reconditioning of feed water pump, fuel pump and blower assembly.e) Cleaning and reconditioning of diesel day tank, fuel and interconnecting pipe line, steam lines, steam valves, filters, strainers, NRV, valves and providing proper packing for leak proof and trouble free operation, steam line, steam valve 77 Overhauling & reconditioning of 500 Kg/hr Thermax make Steam Boiler installed atDevaswom Mess for food preparation.a) Dismantling, cleaning and reconditioning of steam boiler 500 Kg/hr, cleaning of coil using suitable wire brush and wiping the surface with cotton waste, combustion chamber, checking of top and bottom refractory, blower assembly, burner assembly,electrode assembly, nozzle, photocell mountings, sight glass etc. and reassembling the unit with high quality packing.b) Cleaning the water line, water tank, strainers, valves, optimizer, economizer tube,chamber and providing high quality gland packing, gaskets, etc.c) Descaling of coil and pipe line using 5% - 10% descaling chemicals or other type of harmless cleaning media of duration of 12 hr and ensuring the boiler water system of leak proof trouble free and smooth operation during festival season.d) Overhauling and reconditioning of feed water pump, fuel pump and blower assembly.e) Cleaning and reconditioning of diesel day tank, fuel and interconnecting pipe line,steam lines, steam valves, filters, strainers, NRV, valves and providing proper packing for leak proof and trouble-free operation, steam line, steam valve.f) Painting of boiler such as panel board etc. 78 Overhauling & reconditioning of 600 Kg/hr Thermax make Steam Boiler installed atAnnadhana Mandapam for Annadhanam preparation.a) Dismantling, cleaning and reconditioning of steam boiler 600 Kg/hr, cleaning of coil using suitable wire brush and wiping the surface with cotton waste, combustion chamber, checking of top and bottom refractory, blower assembly, burner assembly,electrode assembly, nozzle, photocell mountings, sight glass etc. and reassembling the unit with high quality packing. b) Cleaning the water line, water tank, strainers, valves, optimizer, economizer tube, chamber and providing high quality gland packing, gaskets, etc.c) Descaling of coil and pipe line using 5% - 10% descaling chemicals or other type of harmless cleaning media of duration of 12 hr and ensuring the boiler water system of leak proof trouble free and smooth operation during festival season.d) Overhauling and reconditioning of feed water pump, fuel pump and blower assembly.e) Cleaning and reconditioning of diesel day tank, fuel and interconnecting pipe line,steam lines, steam valves, filters, strainers, NRV, valves and providing proper packing for leak proof and trouble free operation, steam line, steam valve.f) Painting of boiler such as panel board etc. 79 Overhauling & reconditioning of 300 Kg/hr Thermax make Steam Boiler installed at Medicated Drinking water plant for Medicated Drinking water preparation.a) Reconditioning of steam boiler 300 Kg/hr, cleaning of coil using suitable wire brush and wiping the surface with cotton waste, combustion chamber, checking of top and bottom refractory, blower assembly, burner assembly, electrode assembly, nozzle, photocell mountings, sight glass etc. and reassembling the unit with high quality packings.b) Cleaning the water line, water tank, strainers, valves, optimizer, economizer tube,chamber and providing high quality gland packings, gaskets, etc.c) Descaling of coil and pipe line using 5% - 10% descaling chemicals or other typeof harmless cleaning media of duration of 12 hr and ensuring the boiler water system ofleak proof trouble free and smooth operation during festival season.d) Overhauling and reconditioning of feed water pump, fuel pump and blower assembly.e) Cleaning and reconditioning of diesel day tank, fuel and interconnecting pipe line, steam lines, steam valves, filters, strainers, NRV, valves and providing proper packing for leak proof and trouble free operation, steam line, steam valve.f) Painting of boiler such as panel board etc 80 Servicing of 400000 Kcal/HrThermax make Thermic fluid heater installed at Sarmkuthy for preparation of hot drinking water - Checking of top and bottom refractory, blower assembly, burner assembly like diffuser plate, electrode assembly,nozzle, photocell mountings, sight glass etc. Cleaning the diesel tank, fuel line filters,strainers, fuel pump valves and providing proper packing to the valve, NRV, strainers and ensuring trouble free operation.Checking and minor repair of control panel of boiler ensuring perfect and trouble free operation of all switch gears , control gears and parts like MCBs, contactors, switches, OLRs, visual and alarm monitors,sequence controller,temperature controller, photocell, pressure switch,solenoid,motors,transformer, interconnecting cable etc. and keep the system ready for smooth operation 81 Boiler Ovehauling-replacing the defective steam and condensate piping, steampipe line, hot water pump line, SS flanges etc Insulation of Thermic fluid pipelines using mineral wool covered with chicken mesh and cladded with aluminium sheet of suitable thickness for a total insulation thickness of 50 mm. 82 Replacing damaged steam line ,Condensate ,Fuel line and Water line for Aravnaplant,Annadhanam,devaswom mess and Medicated drinking water boiler etc Supply fabrication and erection of MS pipe line for various point at Sabarimala rateinclusive of bend, flanges barrel nipple , nut and bolt labour charges and consumables etc MS C CLASS PIPE 80 NB 83 Replacing damaged steam line ,Condensate ,Fuel line and Water line for Aravnaplant,Annadhanam,devaswom mess and Medicated drinking water boiler etcSupply fabrication and erection of MS pipe line for various point at Sabarimala rate inclusive of bend, flanges barrel nipple , nut and bolt labour charges andconsumables etc MS C CLASS PIPE 50 NB 84 Replacing damaged steam line , Condensate , Fuel line and Water line for Aravnaplant ,Annadhanam,devaswom mess and Medicated drinking water boiler etc Supply fabrication and erection of MS pipe line for various point at Sabarimala rateinclusive of bend, flanges barrel nipple , nut and bolt labour charges and consumables etc MS C CLASS PIPE 40 NB 85 Replacing damaged steam line , Condensate , Fuel line and Water line for Aravnaplant ,Annadhanam,devaswom mess and Medicated drinking water boiler etc Supply fabrication and erection of MS pipe line for various point at Sabarimala rateinclusive of bend, flanges barrel nipple , nut and bolt labour charges and consumables etc MS C CLASS PIPE 25 NB 86 Replacing damaged steam line , Condensate , Fuel line and Water line for Aravnaplant ,Annadhanam,devaswom mess and Medicated drinking water boiler etc Supply fabrication and erection of MS pipe line for various point at Sabarimala rateinclusive of bend, flanges barrel nipple , nut and bolt labour charges and consumables etc MS C CLASS PIPE 20 NB 87 Replacing damaged steam line , Condensate , Fuel line and Water line for Aravnaplant ,Annadhanam,devaswom mess and Medicated drinking water boiler etcSupply fabrication and erection of MS pipe line for various point at Sabarimala rateinclusive of bend, flanges barrel nipple , nut and bolt labour charges and consumables etc MS C CLASS PIPE 15 NB 88 Replacing damaged steam line, and hot Water line for Aravnaplant , Annadhanam,devaswom mess and Medicated drinking water boiler etc. Supply fabrication and erection of SS pipe line for various point at Sabarimala rate inclusive of bend, barrelnipple, nut and bolt and consumables etc SS 304 SCH 40 NB PIPE 89 Replacing damaged steam line, and hot Water line for Aravnaplant , Annadhanam,devaswom mess and Medicated drinking water boiler etc. Supply fabrication and erection of SS pipe line for various point at Sabarimala rate inclusive of bend, barrelnipple, nut and bolt and consumables etc SS 304 SCH25 NBPIPE 90 Replacing damaged steam line, and hot Water line for Aravnaplant , Annadhanam,devaswom mess and Medicated drinking water boiler etc. Supply fabrication and erection of SS pipe line for various point at Sabarimala rate inclusive of bend, barrelnipple, nut and bolt and consumables etc SS 304 SCH 20 PIPE 91 Supply and fixing of SS flanges with SS nut bolt, gasket etc SS 304 FLANGE 40NB 92 Supply and fixing of SS flanges with SS nut bolt, gasket etc SS 304 FLANGE 25NB 93 Supply and fixing of SS flanges with SS nut bolt, gasket etc SS 304 FLANGE 20NB