| 1 | Dismantling brick work or stone work including stacking of materials as directed by the engineer in charge with in a distrance of 60 meter S.I. No. 692 |
| 2 | cement concrete with 4 cm gauge approved brick ballast, fin sand & cement in the proportion of 12:6:1 including supply of all materials, labour, tools & plants, labour cess etc. required for proper completion of the work S.I.No 273 |
| 3 | M-150 Brick work in cement mortar in proportion of 1:4 (1cement and 4 Coarse sand ) in foundation & plinth including supply of all material, labour, T&P etc required for proper comletion of the work.as perS.I.No. 305(a) |
| 4 | 12mm thick plaster with cement and coarse sand of 2.20 fineness modules in 1:4 over brick work minumum thickness not to be less than 1cm. Including supply of all materials, labour, tools & plant etc. required for proper completion of the work. As per S.I. No.584 |
| 5 | Cement concrete with 2 cm gauge approved stone ballast coarse sand & cement in the proportion of 4:2:1 Including supply of all materials, labour, tools & plant etc. required for proper completion of the work. As perS.I. No. 279a |
| 6 | construction of granular sub-base by providing coars graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at desired density, including cost of all material, labour, T&P including all taxes, royalty, labour cess complete, as per mort clause 401. (A.R.) |
| 7 | Laying of interlocking tiles 60 to 80mm thick including levelling and dressing of surface upto required level and slopes filling joints with local sand including cost of Labour T&P etc complete but excluding cost of material a directed by engineer as per S.I. No. 20.17(New Item) |
| 8 | Supply and laying of interlocking tiles of 80mm thick I shaped mechanically compressed interlocking cement concrete pavers block woth top layers of 8mm thickness having plan dimension 200X(160+120mm)of op cement smooth high gloss finish skid resistant ,manufactured from rubber mould through vibro -compression mechanism .the compressive strength of concrete paver block shall not be less then 30Mpa (m-30)and includiing cost of material ,labour T&P etc recuired for proper completion of the work as per SI no 20.16 new item(A.R.)Red Colour Tiles Grey Colours |
| 9 | R.C.C. work with cement approve coarse sand & 2 cm gauge approved stone grit in proportions of 1:2:4 in slab excluding supply of rainforcement and its bending, but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, T&P etc. required for proper completion of the work including cost of binding wire the rate excludes making of drip course which shall be paid extra. |
| 10 | M.S. (tor steel or plain) in plain work such as R.C.C. or R.B. work including bending for proper shape and including supply of steel & its wastage, bend hooks and authorised overlapping shall be measured and including cost of binding wire. As per (Q.R.) |