|
| 1 | Drilling 6\" vertical bore in hard rock area to any required depth as directed by the board officers including labour charges for inserting casing pipes assembly in the directed hole including welding the joints if necessary grounding the casing pipes etc., and including transporting from one place to another etc., complete |
| 2 | Supply and delivery ofPVC casing pipe of the 200mm dia pipes as per IS / 12818 / 92 and as amended from time to time to suit the borewell upto 150m depth (CM) with ISI marking including, loading, unloading , freight, stacking and transit insurance charges etc, complete. SDvol II SR P.No: 6 |
| 3 | Labour Charges for inserting PVC Casing pipes assembly (with slots or without slots) in the drilled hole including jointing the pipes with PVC Couplers with Cement paste etc.,complete.SDvol II SR P.No: 201 |
| 4 | Supplying, laying and jointing G.I. Pipes of approved quality and best variety of \"B\" class pipe of the following dia including labour fixing G.I. Specials, including charges for cutting and threading of pipes, cost of such specials with necessary teak wood plugs, clamps, screws, thread balls, shellac, etc., etc., complete |
| 5 | Supply of UPVC Pipe 32 mmvol II SR P.No: 7 |
| 6 | Supply and fixing of 50mm dia GM Gate Valve with ISI make, the cost shall including materials, fixing and labour charges etc,complete as per standard specification. SD |
| 7 | Supply of 4 SQ.MM PVC INSULATED AND SHEATHED 3 CORE FLAT TYPE COPPER CABLE CONFORMING TO IS 694/1990 SD vol II SR P.No: 124 |
| 8 | Supply of3 HP THREE PHASE100 lpmx75m SUBMERSIBLE PUMPSET SUITABLE FOR 150MM DIA BOREWELL WITHOUT PANEL BOARD AS PER IS 8034/2002 SDvol II SR P.No: 104 |
| 9 | Supply of 3 HP THREE PHASE PANEL BOARD- D.O.L. WITH TWO LEVEL GUARD . PANEL BOARD SHOULD BE PROVIDED AS PER SPECIFICATION vol II SR P.No: 119 |
| 10 | Supply and fixing 200mm dia PVC End cap as Bore cover on topfor securing vol II SR P.No: 10 |
| 11 | Supply and Erection of Nylon Rope PWD 24-25. P -156 |
| 12 | Labour charges for the erection of submersible pumpset in borewell including fixing and jointing submersible cable with proper clamps, erection clamps, pressure gaugesetc., complete and testing the pumpset and trail run for 10 days.SDvol II SR P.No: 204 |
| 13 | GST 18% |