|
| 1 | Providing and fixing G.I pipes complete with G.I fittings including trenching and refilling, cost of pipe, labour charges for fixing & laying minor and major tools, transportation charges including GST etc., complete. |
| 2 | 2\" Pipe ( 50 mm dia pipe) |
| 3 | 1\" Pipe(25mm dia pipe) |
| 4 | 3/4\" Pipe (20 mm dia pipe) |
| 5 | Providing and fixing G.I fitting including cost of GI fittings, of ISI standard, including cost of labour, minor & major tools, transportation charges etc.complete. |
| 6 | Elbow-2\" dia (50 mm nominal bore) |
| 7 | Union Socket-2 \" dia (50 mm nominal bore) |
| 8 | Socket-2\" dia (50 mm nominal bore) |
| 9 | Reducer |
| 10 | 2½\"-2\" ( 80 mm X 50 mm nominal bore) |
| 11 | 2\"-1\" ( 50 mm X 25 mm nominal bore) |
| 12 | 2\"-½\" ( 50 mm X 15 mm nominal bore) |
| 13 | Gate valve |
| 14 | 2\" dia (50 mm nominal bore) |
| 15 | ½\" dia (15 mm nominal bore) |
| 16 | 3/4\" dia (20 mm nominal bore) |
| 17 | Nipple -2\" dia x 4\" |
| 18 | Nipple- ½\" dia |
| 19 | Earthwork excavation in trenches in all lands of soil lead up to 100 mtrs and lift upto 1.50 mtr including stacking the excavated earth not more than 3m from the edge of excavation and then retuming the started soil in 15cm layers when required in trenches etc. consolidating each deposited layer by watering, ramming and the disposing of all surplus excavated soil with in a lead of 30 mtrs as directed by EIC, including cost of all labour charges and cost of minor tools etc. complete. and thedisposing of all surplus excavated soil with in a lead o 30 mtrs as directed by EIC, including cost of all labour charges and cost of minor tools etc. |
| 20 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering andshuttering - All work up to plinth level 1:2:4(1 cement, 2 mainland river sand, 4 graded stone aggregate 20 mm nominal size from mainland quarry) but including cost of all labour charges, transportation charges, GST, labour welfare cess, and minor tools etc complete. |
| 21 | Centering and shuttering including strutting, propping etc., and removal of form work and including cost of all materials to work site, cost of all labour charges, labour cess, Minor tools and GST etc., complete. |
| 22 | Foundation, footing, basses for columns |