| 1 | Gada Path (from Ch. 0.00 m to Ch. 400.00 m, L=0.40 km)Clearing and Grubbing Road LandClearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.(i) By Manual Means(a) In area of non thorny jungle |
| 2 | Construction of Embankment with Material Obtained from Borrow PitsConstruction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5(i) Private Land |
| 3 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.(i) Private Land |
| 4 | Granular Sub-base with Well Graded Material (Table 400.1)(Only for PMGSY work)(A) By Mix in Place MethodConstruction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.(ii) For Grading II Material |
| 5 | ii) Guchikola Chuburi Path (from Ch. 0.00 m to Ch. 350.00 m, L=0.35 km)Clearing and Grubbing Road LandClearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.(i) By Manual Means(a) In area of non thorny jungle |
| 6 | Construction of Embankment with Material Obtained from Borrow PitsConstruction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5(i) Private Land |
| 7 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.(i) Private Land |
| 8 | Granular Sub-base with Well Graded Material (Table 400.1)(Only for PMGSY work)(A) By Mix in Place MethodConstruction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.(ii) For Grading II Material |
| 9 | iii) Major Chuk Path (from Ch. 0.00 m to Ch. 500.00 m, L=0.50 km)Clearing and Grubbing Road LandClearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.(i) By Manual Means(a) In area of non thorny jungle |
| 10 | Construction of Embankment with Material Obtained from Borrow PitsConstruction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5(i) Private Land |
| 11 | Construction of Subgrade and Earthen ShouldersConstruction of subgrade and earthen shoulders with approved material obtainedfrom borrow pits with all lifts and leads, transporting to site, spreading, grading torequired slope and compacted to meet requirement of Table 300.2 with lead upto1000 m as per Technical Specification Clause 303.1.(i) Private Land |
| 12 | Granular Sub-base with Well Graded Material (Table 400.1)(Only for PMGSY work)(A) By Mix in Place MethodConstruction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.(ii) For Grading II Material |
| 13 | B. Cross Drainage Works (2 Nos 600mm dia HPC Single row)Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitablematerial. |
| 14 | Laying 1st class bedding on well compacted sand, moorum as per clause 115(ii)Granular bedding |
| 15 | Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granularmaterial in single row includingfixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106.B)1000mm dia. |
| 16 | Backfilling in Foundation Trenches as per drawing and technical specification Clause 1108 |
| 17 | iv) Komar Patty path (from Ch. 0.00 m to Ch. 250.00 m, L=0.25 km)Clearing and Grubbing Road LandClearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.(i) By Manual Means(a) In area of non thorny jungle |
| 18 | Construction of Embankment with Material Obtained from Borrow PitsConstruction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5(i) Private Land |
| 19 | Construction of Subgrade and Earthen ShouldersConstruction of subgrade and earthen shoulders with approved material obtainedfrom borrow pits with all lifts and leads, transporting to site, spreading, grading torequired slope and compacted to meet requirement of Table 300.2 with lead upto1000 m as per Technical Specification Clause 303.1.(i) Private Land |
| 20 | Granular Sub-base with Well Graded Material (Table 400.1)(Only for PMGSY work)(A) By Mix in Place MethodConstruction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.(ii) For Grading II Material |
| 21 | B. Cross Drainage Works (2 Nos 600mm dia HPC Single row)Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitablematerial. |
| 22 | Laying 1st class bedding on well compacted sand, moorum as per clause 115(ii)Granular bedding |
| 23 | Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granularmaterial in single row includingfixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106.B)1000mm dia. |
| 24 | Backfilling in Foundation Trenches as per drawing and technical specification Clause 1108 |
| 25 | v) Chetia Handique Saikia Path (from Ch. 0.00 m to Ch. 850.00 m, L=0.85 km)Clearing and Grubbing Road LandClearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.(i) By Manual Means(a) In area of non thorny jungle |
| 26 | Construction of Embankment with Material Obtained from Borrow PitsConstruction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5(i) Private Land |
| 27 | Construction of Subgrade and Earthen ShouldersConstruction of subgrade and earthen shoulders with approved material obtainedfrom borrow pits with all lifts and leads, transporting to site, spreading, grading torequired slope and compacted to meet requirement of Table 300.2 with lead upto1000 m as per Technical Specification Clause 303.1.(i) Private Land |
| 28 | Granular Sub-base with Well Graded Material (Table 400.1)(Only for PMGSY work)(A) By Mix in Place MethodConstruction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.(ii) For Grading II Material |
| 29 | B. Cross Drainage Works (2 Nos 600mm dia HPC Single row)Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitablematerial. |
| 30 | Laying 1st class bedding on well compacted sand, moorum as per clause 115(ii)Granular bedding |
| 31 | Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granularmaterial in single row includingfixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106.B)1000mm dia. |
| 32 | Backfilling in Foundation Trenches as per drawing and technical specification Clause 1108 |