}

Tender For Construction Of V.R.B. And Protection Work At Km. 11.820, 13.008 And 22.930 Of M.J.L.C - Dismantling Stone Work In Cement Mortor Including Stacking Of Dismantaled Materials As Directed By Engineer-In-Charge . 2 Dismantling R.C.C. 1:2:4 Work I, mirzapur-Uttar Pradesh

Irrigation Department has published Tender For Construction Of V.R.B. And Protection Work At Km. 11.820, 13.008 And 22.930 Of M.J.L.C - Dismantling Stone Work In Cement Mortor Including Stacking Of Dismantaled Materials As Directed By Engineer-In-Charge . 2 Dismantling R.C.C. 1:2:4 Work I. Submission Date for this Tender is 28-08-2025. Bridge Work Tenders in mirzapur Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

50757237
Tender For Construction Of V.R.B. And Protection Work At Km. 11.820, 13.008 And 22.930 Of M.J.L.C - Dismantling Stone Work In Cement Mortor Including Stacking Of Dismantaled Materials As Directed By Engineer-In-Charge . 2 Dismantling R.C.C. 1:2:4 Work I
Tender
Indian
Uttar Pradesh
Mirzapur
28-08-2025

Tender Details

Tender For Construction Of V.R.B. And Protection Work At Km. 11.820, 13.008 And 22.930 Of M.J.L.C - Dismantling stone work in cement mortor including stacking of dismantaled materials as directed by Engineer-in-Charge . 2 Dismantling R.C.C. 1:2:4 work including stacking of materials as directed by Engineer-in-Charge. 3 Earth work in excavation of foundation in sand stone or other soft rock by pick axex including all lead and lift, with proper completionand disposal including dewatering if required. 4 Centering & shuttering for C.C. workin different parts of structure including cost of material, labour, T&P, fixing and removal etc. 5 Laying C.C. 1:2:4 (M-15) with cement, coarse sand of FM. not less than 2.0 and hard stone grit 4.75 mm to 20. mm size including cost of all material, all lead and lift, labour, T&P etc. required for proper completion of work. 6 Centering & shuttering for R.C.C. workin different parts of structure including cost of all materials, labour, all lead & lift, T&P etc. required for proper completion of work. 7 Providing & laying TMT (Fe 550) steel bar including Carriage, Cutting, Bending, Binding and placing steel for reinforcement with cost of binding wire and cost of all materials, labour, all lead & lift, T&P etc. required for proper completion of work. 8 Laying R.C.C. 1:1.5:3 (M–20) with cement, coarse sand of F.M. not less than 2.00 and crushed hard stone grit including cost of all material, labour, all lead & lift, T&P etc. required for proper completion of work but excluding cost of reinforcement, centering and shuttering in construction ofdifferent parts of structure. 9 Providing & laying 150mm wide& 6.00 mm thickPVC water stop seal atjoints including cost of all material, labour, T&P etc. required for proper completion of work. /RM 10 Laying R.C.C. 1:1:2 M–25 (as per mix design) with cement, coarse sand of F.M. not less than 2.00 and crushed hard stone grit including cost of all material, labour, all lead & lift, T&P etc. required for proper completion of work but excluding cost of reinforcement, centering and shuttering in construction ofdifferent parts of structure. 11 Laying & Fixing joint filler board (18m.m. thick) including cost of all materials, labour, all lead & lift,T& P etc. required for proper completion of work. 12 P/F Hard stone wheel guard of size 200 x 200 x 900 mm with cost of all material, labour, all lead & lift T&P etc. 13 Laying 3 m.m. thickPolyplus Multyplast tar paper over bed block including cost of all materials, labours, T&P etc, required for proper completion of work. 14 Providing expansion joint in concrete including placing and fixing of angle iron (55x55x10) & M.S. plate (125x10) with 10mm dia anchor bars and filling with bitumen including cost of all materials, all lead and lift, labours, T&P etc. required for proper completion of work. 15 C.R. Stonemasonary wall with 1:3 cement, coarse sand mortor including cost of all material, labour and T&P etc. including all lead and lift for proper completion of work. 16 Providing and fixing PVC Pipe in drainage spout & weep holes including cost of all materials, labours, all lead & lift, T&P etc, required for proper completion of work. 17 Supplying and laying coarse sand in filter including cost of all materials, labour, T&P, all lead & lift etc. required for proper completion of work. 18 Supplying and Laying graded hard stone grit 4.75 mm to 20 mm size in filter including cost of all materials, labour, T& P, all lead & lift etc. required for proper completion of work. 19 Supplying and Laying graded hard stone ballast 20 to 40 mm size in filter and in gaps of C.C. blocks including cost of all materials, labour, T&P, all lead & lift etc. required for proper completion of work. 20 Earth work in filling with proper dressing and compaction including all lead & liftetc. required for proper completion of the work. 21 Cement pointing 1:2 C.M.(struck deep) on stone masonary including cost of all materials, labour, all lead & lift, T&P etc required for proper completion of work. 22 Cement plaster 1:3 C.M. (20 mm thick) on stone masonary including cost of all materials,T&P etc required for proper completion of work. 23 Making construction groove inconcrete surface including painting with sealing primer on joint and filling groove with sealing compound including cost of all materials, fuel for heating labour, T & P etc. required for proper completion of work.

Key Value

Document Fees
INR 2360 /-
EMD
INR 266000.0 /-
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail