Tender For Ward - 19, Patel Nagar Lal Chowk Amit Telas To Rk Steel Road Improvement Work By Danes.- Dismantling reinforced cement concrete or reinforced brick work including stacking of materials as directed by the Engineer-in- charge within a distance of 60 metre (200 feet). PWD SOR 2022 17.3 2 foundation 3 Providing and fixing factory made precast RCC perforated drain covers, having concrete of strength not less than M-25, of size 1000 x 450x50 mm, reinforced with 8 mm dia four nos longitudinal & 9 nos cross sectional T.M.T. hoop bars, including providing 50 mm dia perforations @ 100 to 125 mm c/c, including providing edge binding with M.S. flats of size 50 mm x 1.6 mm complete, all as per direction of Engineerin- charge. 4 First class Brick Work in (1:4) cement & four coarse sand 2.20 F.M. morter in foundation and plinth and T&P etcall completed as per the direction of engineer - in - charge. (AS PER PWD SOR 2022 PAGE NO 20 SI NO 6.05 ITEM NO 305 (a) 5 12 mm thick plaster with cement and coarse sand of1.25 fineness modules in (1:4) over brick work minimum thickness not to be less than 1 cm including supply of all material, labour, tools & plant etc required for proper completion of the work. (AS PER PWD SOR 2022 PAGE NO 36 SI NO 13.11 NEW ITEM ) 6 S/L P:C:C (1:6:12) with 40 mm gauge brick ballast ,fine sand of 1.25 f.m and cement in foundation and under floor including all materials, labour, tools, & plant etc all completed as per the direction of engineer - in - charge.{ AS PER PWD SOR 2022 PAGE NO 18 SI NO 5.01 ITEM NO 273 } 7 R.C.C work with cement ,approved coarse sand & 2cm gauge approved stone grit in proportions of 1:1.5:3 in lintels of doors &windows excluding supply of reinforcement and its bending ,but including its fixing and binding wire including necessary cantering and shuttering etc .and supply of all materials,labour,tools& plants etc. required for proper completion of the work including cost of binding wire. the rate excludes making of drip course which shall be paid extra etc all complete as per direction of engineer in charge.(AS PER PWD SOR 2020/283 a .) 8 Steel reinforcement for R.C.C work including straightening ,cutting ,bending,placing in position and binding all complete upto plinth level mild steel and medium tensile steel bars DSR 2023 ITEM N.5.22.1 9 S/S of 22.4 to 53mm gauge stone ballast with stacking for measurment etc. all complete as per the direction of Engineer in charge (AS PER PWD SOR 2020 RMR) 10 Supply of screening material with stacking for measurment 11 etc all complete as per the direction of engineer in-charge AS PER PWD SOR 2020 RMR 11 Consolidation of stone aggregates of 45-63 mm/22.4-53mm size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2/3 as per Technical Specification Clause 405 12 S/L Tack coat of bitumen @ 0.30 kg/m2 including heating the VG 10 bitumen spraying the bitumen with mechanically operated sparay unit fitted on bitumen boiler & cleaning and prepairing the existing road surface etc all completed as per the direction of engineer - in - charge. 13 Providing & laying Bitumen macadam with 100 TPH hot mix plant producing an average output op 75 tonnes per hour using crushed aggregate of specified grading premixed with VG-10 @ 3.3%,transported to site laid over a previous prepared surface wi 14 Providing and laying bituminous concrete with HMP crushed aggregates from approved quarry of specified grading, premixed with bituminous binder (VG-30) @ 5.4 per cent by weight of total mix and filler,transporting the hot mix to work site,laying with a hydrostatic paver finisher to the required grade, level alignment,rolling with smooth wheeled. vibratory and tandem rollers to achieve the desired compaction (Ref. to Mort&HSpecification no. 507 ) Adjustment for bitumen shall be done as per job mix formula and e-in-c latter No 2651 Dt 27-07-12 for proper completion of work as per direction of engineer-in-cgarge including all labour,T&P,taxes , labour cess etc. complete. 15 Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface. Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35-2015 The finished surface to be level, uniform and free from streaks and holes. 16 Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface. Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35-2015 The finished surface to be level, uniform and free from streaks and holes. 17 Supply & laying 80 mm thick Precase cement concrete ishape interlocking (perfoted) paver block (Grey color) with top layer of minimum 8 mm thickness having plan dimension 200X(160+120mm) of O.P cement smoothing gloss finish,skid resistant manufacturered from rubber moulds M-30 GRADE AS PER SOR 2022. 18 S/L C:C (1:2:4) with 20 mm stone grit, coarse sand & cement etc all complete as the direction of engineer in charge. (AS PER PWD SOR 2022 279 ( a). 19 Desposal of refused material/malwa distance up to 8 km etc all complete as the direction of engineer in charge. (AS PER PWD SOR 2020 /231( a). 20 SF of Sing board