Tender For Road, Drain, Interlocking Tiles And Asphalting Work On 12 M Road Leading To Hig Plot No. 354 In Shastripuram Yojna - Dismantlling lnterlocking tiles tiles work in floors/Roads lald in dry sand including stacking with 50 metre lead for thickness of tile 60mm to Bomm (CH-17 Item No. 22 SOR 2023-24) 2 Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge: 2.1.1 All kinds of soil (DSR-2023) 3 Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand) (Item No. 6.1.1 DSR 2023) 4 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) (Item No. 4.1.2 DSR 2023 5 12mm Thick cement plaster in single coat on fair side of single or half brick wall for interior plastering upto floor two level including internal rounded angles not exceeding 80mm in girth, chamfers and finished even and smooth. (Item No. 13.4.1 DSR-2023) 1 cement : 4 Coarse sand 6 Water line work :- Excavating trenches by mechinical / manual means of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, for all depth, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : All kinds of soil - Pipes, cables etc. exceeding 80 mm dia. but not exceeding 300 mm dia (Item No. 2.10.1.2 DSR-2023) 7 Providing and fixing PVC pipe conforming to IS make working pressure 6 Kg/SqCm incuding testing labour T&P and all complete fittings (CH-23 S.I. No. 30(C) SOR 2023-24) 110 mm diameter 8 Providing and fixing C.I. sluice valves (with cap) complete with bolts, nuts, rubber insertions etc. (the tail pieces if required will be paid separately) : (CH-23 S.I. No. 13 SOR 2023-24) 100 mm diameter - Class I 9 Constructing brick masonary chamber for underground C.I. inspection chamber and bends with bricks in cement mortar 1:4 (1 cement : 4 coarse sand) C.I. cover with frame (light duty) 455x610 mm internal dimensions, total weight of cover with frame to be not less than 38 kg (weight of cover 23 kg and weight of frame 15 kg), R.C.C. top slab with 1:2:4 mix (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size), foundation concrete 1:5:10 (1 cement : 5 fine sand : 10 graded stone aggregate 40 mm nominal size), inside plastering 12 mm thick with cement mortar 1:3 (1 cement : 3 coarse sand), finished smooth with a floating coat of neat cement on walls and bed concrete etc. complete as per standard design : (CH-25 S.I. No. 8 SOR 2023-24) (a) Inside dimensions 600x 850 mm and 45 cm deep for pipe line with three or more inlets : With common burnt clay F.P.S. (non modular) bricks of class designation M-150 10 Road work:- Construction of granual sub base (GSB) by providing coarse graded material spreading in uniform layers with moter grader surface, mixing by mix in place method with rotavator at OMC & compacting with vibratory power roller to achieve the desired density, complete as per clause Table-400-2 S.N. 4.2 (C) MORT&H specification no. 401 (53mm - 26.50mm @ 35%, 26.50-4.75mm @ 45%, 2.36-mm and below @ 20%) 11 Providing and Laying spreading and compacting grades stone aggregate to wet mix macadam (WMM) specification including premixing the material with water to OMC in mechnical Mix plant carries of mixed materical by tipper to site laying in uniform layers with paver in sub-base/base course on a well prepared surface and compacting with vibratory roller to achieve the desired density as per MORT&H specification No 406 S.No. 4.12 (table -400-11) Material (For Grading-I),53 mm -22.4 mm 30.00%, 22.4mm-4.75mm 40.00%, 2.36 mm and below 30%) 12 Providing and applyingTack Coat VG-10 bitumen using bitumen pressure distributor@ 0.30 Kg/ M2 on the prepared bituminous surface cleaned with labour and Air compnesson including cost of bitumen, aggregate, T&P labour & all taxes complete as per MORTH&H specification No.503 Analyses attached. 13 Providing and laying of Bituminous Macadom with 60-90 TPH Batch type Hot Mix Plant producing an average out put of 75 TPH, Ussing Crushed stone aggregates of specified grading as given below, Primixed with Bituminous Binder @ 3.30%of mix and filter, Transporting the hot mix to work site, laying with a hydrostatic paver finsher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem roller to achieve the disired compaction as per MORTH specification clause No. 501.6 and 501.7 complete in all respects 50mm to 80 mm thick using VG-30 Bitumen (Grading 19mm nominal size) 25-10mm 40% 10-5mm 40% 5mm and below 20% 14 Providing and laying Semi Dense Bituminious Concrete with 60-90 TPH Batch type Hot Mix Plant producing an average out put of 75 TPH, Using Crushed stone aggregates of specified grading as given below, premixed with Bituminous Binder @ 4.50%of mix and filter, transporting the hot mix to work site, laying with a hydrostatic paver finsher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tan tom rolar to achieve disired compaction as per MORTH specification clause No. 508 complete in all respect 25 mm thick using VG-30 Bitumen, 9.5-4.75mm57per cent 4.75mm and below 4.1% filter 2% 15 Supply Laying of 80 mm I Shaped (Zigzag) rubber moulded gray precast Interlocking tiles of thickness 60 to 100mm (Compressive strength not less then 30Mpa and weight 4.50kg) Including 25mm thick local sand base levelling and dressing of surface to required level and slope, filling joints with local sand all complete work. (Cha.-20 S.I No. 17 E, SOR 2023-24 16 Engaging of Beldar for Malva disposal. (Item No. 15 SOR 2023-24) 17 Supply of Tractor Trolly with driver including P.O.L. (Item No. 25 SOR 2023-24) 18 Cartage of ballast, Kankar Coal, grit or sand including loading & unloading but excluding stacking on pucca roads: 5.00 km (CH-3 Item No. 1 SOR 2023-24)