|
| 1 | HSR ITEMS [10.76]Providing and laying 60mm thick factory made cement concrete interlocking paver block of M -30 grade made by block making machine with strong vibratory compaction, of approved size, design and shape, laid in required colour and pattern over (BIS 15658:2006) and including 50mm thick compacted bed of coarse sand, filling the joints with line sand etc. all complete as per the direction of Engineer-in-charge. [Through Rate] |
| 2 | [11.5.3]12 mm cement plaster of mix : 3. 1:4 (1 cement: 4 fine sand) [Through Rate] |
| 3 | [11.58]Providing and applying two coats white cement based putty of approved brand and manufacturer, over plastered surface and grinding the surface smooth with sand paper to get en even and smooth finish including cost and carriage of all material , labour charges, scaffolding, sundries etc. complete [Through Rate] |
| 4 | [11.64.1]Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade : 1. New work (two or more coats) over and including water thinnable priming coat with cement primer [Through Rate] |
| 5 | [11.73.2]Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer`s specifications including appropriate priming coat, preparation of surface, etc. complete. 2. On concrete work [Through Rate] |
| 6 | [17.13]Granular Sub-Base (Mix in place) Construction of granular sub-base by providing Material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per technical clause 401 of MORT&H technical specifications [Through Rate] |
| 7 | [18.32.8]Providing and fixing 3 layer PP-R (Poly propylene Random copolymer) pipes confirming to IS:15801 UV stabilized and anti - microbial fusion welded, having thermal stability for hot and cold water supply, including all PP - R plain and brass threaded polypropylene random fittings, including trenching, refilling and testing of joints complete as per direction of Engineer-in-Charge. 8. External work PN - 10 Pipe, 90 mm OD (SDR-11) [Through Rate] |
| 8 | [2.RM098] RM098. HDPE pipes 75mm dia [Rate] |
| 9 | [20.114.1]Supplying erection, testing of fullyautomatic electric control panel board forT/Wells in Pump Chamber consisting ofMS sheet of thickness 14 gauge dulypainted box type floor mounted made ofangle Frame containing 1 no. fullyautomatic air brake starter suitable forMotor of the following capacity, Minswitch of suitable range with HRC fuse, 1no. volt meter (0 to 500 volts), 1 No.Amp. Meter of 0 to 100 amp. 3 sets ofindicating lamp capacitor of suitablecapacity and 1 no. single phase preventerswith the timer switch including wiring inpanel board and suitable electric energymeter wiring in Electric Control PanelBoard complete in all respect as perspecification given in Schedule No. II,Including MCB, suitable, Capacitor,Wooden Box etc as per siterequirement complete in all respect. 1. 10 HP Motor [Through Rate] |
| 10 | [20.115.3]Supplying, erection, testing andcommissioning of horizontal motorpumping set for clear water having head20.00 m as per the indicated requirementsof discharge in LPM and power capacityin BHP as per IS marked. 3. Discharge Capacity (LPM) 500 Power Capacity (BHP) 5 [Through Rate] |
| 11 | [20.7.2]Stringing out A.C./P.V.C pipes and specials casting along trenches and laying the same in trenches, to correct alignment and gradients including cartage from divisional stores or nearest railway station to site of works and return of pieces of pipes to stores. 2. 80 mm internal diameter of pipe line laid complete [Through Rate] |
| 12 | [20.8.2]Jointing A.C./P.V.C. pipes and specials with cast iron detachable joints/split coupler P.V.C. joints fitted with bolts and nuts excluding cost of detachable joints/ split coupler P.V.C. joints rubber rings, bolts and nuts but including cost of labour and tools etc. and tested complete. 2. 80 mm i/d pipe [Through Rate] |
| 13 | [21.38.4]`Lowering salt glazed stoneware pipes and specials into trenches for all depths and laying out the same to correct alignment gradient, level etc in trenches including all dressing and trimming of bed and sides of trenches, if required, trimming and cutting of concrete beds and joint holes, supporting the pipes and specials, in correct position in a suitable rigid manner while the same are being jointed and until the surrounding benching hunching and envelopes are completed. The sewer shall rest on the bed at every point throughout its length and to ensure this, it shall be grouted in without extra charge by the contractor with lime surkhi mortar, in the case of lime concrete beds and 1:3 cement sand mortar in the case of cement concrete beds including cartage from Divisional Store or nearest Railway station to site of work.The internal diameter of sewer being :-` 4. 200 mm internal diameter of sewer [Through Rate] |
| 14 | [21.90.4.1]Construction of rectangular standard brick masonry manhole chambers to standard drawings on S.W. pipe sewers or other circular pipe sewers up to the required depth in 1.5 cement sand mortar, lime concrete in bed and sides of pipe sewer and cement concrete 1:2:4 in benching, 12 mm thick water tight 1:2 cement sand plaster with a floating coat of neat cement and finished with 2 coats of sodium silicate on interior surfacewhererequired, reinforced cement concrete slab 180mm thick fixing 560 mm internal diameter C.I. manhole cover and frame weight not less than 2.5 quintal painted with 3 coats of black bitumen paint, fixing galvanised malleable iron steps embedded in 1:2 cement sand mortar complete. the rate covers the cost of M.S. steel for R.C.C. slab labour for fixing and carriage of C.I. manhole frame and cover and malleable iron steps from the stores of the Engineer-in-charge of the works to the site of works. The rate also include the cost of accurately planned and fitted centring, supports for all works as well as for all curves and special work, cleaning out their beds etc. sodium silicate shall be supplied free of cost at the stores of the Engineer-in-charge. 4.1. On 200 mm internal diameter pipe sewer - for 1.80 meters depth below ground level [Through Rate] |
| 15 | [21.93.1]Providing and fixing SFRC MANHOLE COVERS AND FRAMES MARKED WITH IS: 12592 including setting the same to correct lines and levels in 1:3 cement sand mortar over manhole including carriage loading unloading stacking handling re-handling etc. complete in all respects to the satisfaction to the Engineer-in-charge. 1. Type:- Extra Heavy Duty Set (EHD-35) 560MM Clear Opening [Through Rate] |
| 16 | [21.94.5]Providing salt glazed stone ware pipes grade ‘A’ in standard length of 600 mm each pipe marked with IS: 651 and their lowering, cutting, jointing and testing as described initem No. 21.38, 21.39, item 21.40 including the cost of jointing materials as well as carriage, loading, unloading, stacking, handling, re-handling etc. complete in all respects to the satisfaction of Engineer-in-charge. 5. 300mm i/d [Through Rate] |
| 17 | [22.222.2.1]Providing and fixing in position singel socket SWR UPVC soil waste or antisyphonage pipes as per IS 13592 of E.D.C manufacture or of any other reputed firm including cutting, jointing, wastage, but excluding cost of jointing. 2.1. Single Socket Type B 160mm o/d SWR UPVC pipe lines laid complete [Through Rate] |
| 18 | [22.222.2.3]Providing and fixing in position singel socket SWR UPVC soil waste or antisyphonage pipes as per IS 13592 of E.D.C manufacture or of any other reputed firm including cutting, jointing, wastage, but excluding cost of jointing. 2.3. Single Socket Type B 90mm o/d SWR UPVC pipe lines laid complete [Through Rate] |
| 19 | [22.87.3]Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot and cold water supply including all CPVC plain and brass threaded fittings This includes jointing of pipes and fittings with one step CPVC solvent cement, trenching, refilling and testing of joints complete as per direction of Engineer in Charge.External work 3. 25 mm nominal outer dia Pipes [Through Rate] |
| 20 | [22.98.1]Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end) : 1. 25 mm nominal bore [Through Rate] |
| 21 | [22.98.6]Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end) : 6. 65 mm nominal bore [Through Rate] |
| 22 | [25.1.7]Supplying, fixing, testing and commissioning of condenser water pipes / non insulated chilled water pipes of following sizes of MS C class along with necessary clamps, vibration isolators and fittings such as bends, tees etc. but excluding valves, strainers, gauges etc. adequately supported on rigid supports duly painted/buried in groundexcavation and refilling etc. as per specificationand as required complete in all respect. 7. 80mm dia. [Through Rate] |
| 23 | [25.3.4]Supplying, fixing, testing and commissioning of Butterfly valves PN 16 rated without insulationforwater circulation as per specifications. 4. 150mm dia. [Through Rate] |
| 24 | [25.3.6]Supplying, fixing, testing and commissioning of Butterfly valves PN 16 rated without insulationforwater circulation as per specifications. 6. 100mm dia. [Through Rate] |
| 25 | [25.4.4]Supplying, fixing, testing and commissioning o NON - RETURN VALVE with dual plate of C I body SS plates vulcanized NBR seal flanged end and PN 16 pressure rating as specified. 4. 100mm dia. [Through Rate] |
| 26 | [28.16]Providing and laying water proofing treatment on roofs of slabs by applying cement slurry mixed with water proofing cement compound consisting of applying:(a) after surface preparation, first layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/sqm(b) laying second layer of Fibre glass cloth when the first layer is still green. Overlaps of joints of fibre cloth should not be less than 10 cm.(c) third layer of 1.5 mm thickness consisting of slurry of cement @ 1.289 kg/sqm mixed with water proofing cement compound @ 0.670 kg/sqm and coarse sand @ 1.289 kg/sqm This will be allowed to air cure for 4 hours followed by water curing for 48 hours. The entire treatment will be taken up to 30 cm on parapet wall and tucked into groove in parapet all around.(d) fourth and final layer of brick tiling with cement mortar (which will be paid for separately).For the purpose of measurement the entire treated surface will be measured. [Through Rate] |
| 27 | [28.20.1]Providing and applying integral crystalline slurry of hydrophilic in nature for waterproofing treatment to the RCC structures like retaining walls of the basement, water tanks, roof slabs, podiums, reservoir, sewage and water treatment plant, tunnels / subway and bridge deck etc., prepared by mixing in the ratio of 5 : 2 (5 parts integral crystalline slurry : 2 parts water) for vertical surfaces and 3 : 1 (3 parts integral crystalline slurry : 1 part water) for horizontal surfaces and applying the same from negative (internal) side with the help of synthetic fibre brush. The material shall meet the requirements as specified in ACI-212-3R-2010 i.e. by reducing permeability of concrete by more than 90% compared with control concrete as per DIN 1048 and resistant to 16 bar hydrostatic pressure on negative side. The crystalline slurry shall be capable of self-healing of cracks up to a width of 0.50mm. The work shall be carried out all complete as per specification and the direction of the engineer-in-charge. The product performance shall carry guarantee for 10 years against any leakage. 1. For vertical surface two coats @ 0.70 kg per sqm [Through Rate] |
| 28 | [28.20.2]Providing and applying integral crystalline slurry of hydrophilic in nature for waterproofing treatment to the RCC structures like retaining walls of the basement, water tanks, roof slabs, podiums, reservoir, sewage and water treatment plant, tunnels / subway and bridge deck etc., prepared by mixing in the ratio of 5 : 2 (5 parts integral crystalline slurry : 2 parts water) for vertical surfaces and 3 : 1 (3 parts integral crystalline slurry : 1 part water) for horizontal surfaces and applying the same from negative (internal) side with the help of synthetic fibre brush. The material shall meet the requirements as specified in ACI-212-3R-2010 i.e. by reducing permeability of concrete by more than 90% compared with control concrete as per DIN 1048 and resistant to 16 bar hydrostatic pressure on negative side. The crystalline slurry shall be capable of self-healing of cracks up to a width of 0.50mm. The work shall be carried out all complete as per specification and the direction of the engineer-in-charge. The product performance shall carry guarantee for 10 years against any leakage. 2. For horizontal surface one coat @1.10 kg per sqm [Through Rate] |
| 29 | [4.16.1.1]Excavating trenches of required width and depth for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m. 1.1. All kind of soil Pipes, cables etc, not exceeding 80 mm dia . [Through Rate] |
| 30 | [4.16.1.2]Excavating trenches of required width and depth for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m. 1.2. All kind of soil Pipes, cables etc, exceeding 80 mm dia but not exceeding 300 mm dia. [Through Rate] |
| 31 | [6.1.6]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 6. 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) [Through Rate] |
| 32 | [9.58.1.1]Providing and fixing on wall face Unplasticised - PVC moulded fittings/ accessories for Unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion. 1.1. Coupler 75 mm [Through Rate] |