Tender For Strengthening The Road From Melpapampadi Tovelanthangal Road 0/0-4/040; 1 Strengthening the road from Melpapampadi tovelanthangal road 0/0-4/040 2 Clearing the scrub jungles including all labour charges for all labour charges etc complete. 3 Km 0/0 - 4/040 4 Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20A including cost of all labour materials, tools, equipments and all incidental charges and sheeting, shoring and br 5 Km 0/0 - 4/040 6 Picking the existing damaged BT surface to 3 - 5cm deep inccluding all labour charges 7 Km 0/0 - 4/040 8 LayingUS GRAVEL including cost and conveyance and stacking at site to departmental gauge for taking pre measurements by departmental officers and including labour charges for spreading the gravelas per standard specification etc. complete. 9 Km 0/0 - 1/000 10 Km 1/0 - 2/000 11 Km 2/0 - 3/000 12 Km 3/0 - 4/000 13 Km 4/0 - 4/040 14 Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. 15 Km 0/0 - 4/040 16 Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. 17 Km 0/0 - 4/040 18 Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all 19 Km 0/0 - 4/040 20 BITUMINOUS CONCRETE 25 MMTHICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 21 Km 0/0 - 4/040 22 Provision of 15 nos of rumble strips covered with premix bituminous carpet, 15 - 20 mm high at centre, 250 mm wide placed at 1 m center-to-centre at approved locations to control speed, marked with white strips of road marking paint. 23 Construction of 1.50m span RCC slab Culvert @ CH328 24 Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B. 25 Supply and Filling with Msand including cost and conveyence all charges 26 Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete. 27 Supplying and erecting centring for Below Sill 28 Supplying and erecting centring forAbove Sill 29 Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete. 30 Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete. 31 Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works. 32 Reinforced cement concrete 1:1 1/2:3 mix using 20mmISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum 33 Provision for Bitumen Pads 34 Provision for TarPaper 35 Provision forWheep Holes 36 Supply and Filling with Msand including cost and conveyence all charges 37 Construction of 1.50m span RCC slab Culvert @ CH962m 38 Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B. 39 Supply and Filling with Msand including cost and conveyence all charges 40 Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete. 41 Supplying and erecting centring for Below Sill 42 Supplying and erecting centring forAbove Sill 43 Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete. 44 Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete. 45 Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works. 46 Reinforced cement concrete 1:1 1/2:3 mix using 20mmISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum 47 Provision for Bitumen Pads 48 Provision for TarPaper 49 Provision forWheep Holes 50 Supply and Filling with Msand including cost and conveyence all charges 51 Provision for KM stone 52 Provision for HM stone of size 73x23x10cm 53 Provision for 60cm Equilateral Triangular sign board charges 54 Provision for sign board 55 Provision for Citizen board cum name board charges 56 Provision for photographic charges 57 GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column BB for all works in this package}